Eric, Wen
We did a rough alignment of the VOPO cavity after installing the input paths. The pump and seed beams were delivered via the long in-air fibers wrapped with protective foam. We were able to see and align the beam spots traversed the round trips of the cavity. It was difficult to see the transmitted beam of either green or red; a PD and a camera would be needed to do a finer alignment. Unfortunately, there's not much space in the small clean room to install the sensors. Instead, we'll put the circular breadboard into the vacuum tank once we receive the new table legs. This will free a lot of space.
Did some assembly of the input paths. The CLF (orange) and front seed (red) paths use the standard mode matching solution for the VIP CLF paths at the sites. Attached is a picture of what has been completed so far. Components are as follows:
Notes/thoughts:
Last week, I'd done some repair work on the SQZ2 and SQZ3 TwinCAT I/O chassis after a brief power outage took both units down. During that work, I also repaired the middle rail for SQZ2 (controls the OPO common mode board) by replacing the EtherCAT 1100 adapter at the front of the rail. Last week, I was getting error messages when I attempted to reboot the BECKHOFF with SQZ2 Mid Rail enabled. I decided to bypass it again and fix the issue later.
Turns out, all I needed to to was:
Seems to be working now. We should be able to use the OPO servo next week for locking the LASTI VOPO prior to installing it in the old VOPO tank.
I measured the mode of the 532 nm collimator this afternoon. This measurement was done using the old fiber feedthrough from the LASTI X HAM. I made sure to coil the fiber a bit to ensure sufficient bending loss for any higher order mode content (these old homemade UHV fibers weren't quite single mode for green if memory serves). I measured a waist disstance of .363 meters and a beam waist size of 156 um (radius). Surprisingly, this gives > 99% mode matching to the VOPO if the fiber collimator is placed 12" away from M1 (VOPO input coupler). Looks like we don't need any mode matching lenses on this path.
For reference, here are the q values at the fiber collimator output: q_x (used for mode matching) = -0.36342+0.14517i, q_y = -0.3708+0.158i
The optical path delivering seed is recovered. The old set-up merges the seed or CLF light in free space before sending them to the same fiber. This is not a good design; instead, we should use the site's design where the seed and CLF are coupled in separate fibers, which will merge in a fiber BS. The current design is attached in the picture.
As I recovered the seed fiber alignment, I saw some unsettling amplitude modulation of the laser beam. As I traced back upstream, I found both PBS cube mounts had broken clamping arms. This proves that these types of cube mounts are not good enough for long-term operation. I've replaced them with metal ones that sandwich the cube between two plates.
The seed beam is now coupled to the fiber with 89% efficiency.
[Wen, Eric]
We found a number of spare Class-A fiber collimators in the orange lab, and plan to use them to assemble the new VOPO 10 dB setup in the VOPO tank. These are of the O3 variety, so are no longer as useful as site spares (the spares page has been updated).
We plan to implement an existing layout solution for the CLF and 532 injection paths for the VOPO cavity (with tweaks for fiber collimator measurement). After some digging on the DCC we were able to find the desired documentation:
Eric, Wen
Now that the SHG is working with good efficiency, we aligned the green path on the SQZ table to deliver the pump light to the VOPO. The power budget of the path is shown in the attachment. We got about 78% coupling to the fiber using the old set-up. The pump out of the fiber is around 30 mW, and can potentially be increased to 87 mW for the VOPO NLG sweep in the future. We'll clean up some hardwares before the vacuum prep lab shutdown and continue aligning the seed path tomorrow.
[Wen, Eric]
After some morning woes with the Beckhoff, we were able to get the slow controls up and running again. Now that the servo electronics have been updated, we decided to finish setting up the new SHG. The loop is now locking nicely with a 1.2kHz UGF and 60 deg of phase margin. We could afford to increase the boost corner frequencies later if we decide we'd like a bit more suppression around 100 Hz (currently all three are set to 2.5Hz/50 Hz Pole/Zero boosts).
The SHG efficiency seems fine. With 224 mW incident @1064 nm, we are getting about 125 mW of 532 nm. About 56% conversion efficiency at this input power level. Probably could do a bit better if we further optimize the temperature.
[Hudson, Melissa] We switched the Mach-Zehnder interferometer's locking electronics from a red pitaya to analog electronics. This improved the RMS phase noise from about 250 mrad to about 9 mrad when locking with 2 uW of incident laser power on one interferometer input port. Above 0.5 Hz, the relevant low-frequency bound for our planned 2 second measurement(set by the red pitaya's memory and acquisition rate), the RMS phase noise is now 3.0 mrad. Assuming we decrease the power further by a factor of 4, we anticipate having roughly 12 mrad of RMS phase noise from the interferometer, which should still be low enough not to degrade squeezing substantially. The upshot is that we have experimental confirmation that there exists a CLF power level that is simultaneously high enough to lock the interferometer and low enough to allow us to measure high levels of squeezing. The measured 3 mrad of phase noise is also consistent with a theoretical model of the interferometer laid out in section VI.A of the attached document, which anticipates 0.8 mrad of RMS phase noise for an interferometer with phase noise suppressed to the shot + electronics noise level from 0 to 10 kHz.
I made some modifications to the SHG Common mode board since the existing values made no sense to Wen and me.
Mods:
Now we just need to change the PZT driver to have a 100 Hz output Low Pass and the servo should have the desired TF.
Added an output low pass filter on the SHG PZT driver board output: R=3.1k, C=470nF. 100 Hz
Setting up our two new BASIK lasers. Below is a list of connections and corresponding power levels for the 1550.12 nm laser. The losses for the beamsplitters are a bit higher than in the other setup. I suspect that is because they've been in use for a while and the connectors are a bit worn; The components on the 1545 setup are all brand new. I did my best to clean the connectors.
Path I: Laser, AOM, Beamsplitter
Path II: To Prestab Chamber
Path III: To Interferometer and test output
Setting up our two new BASIK lasers. Below is a list of connections and corresponding power levels for the 1545 nm laser
Path I: Laser, AOM, Beamsplitter
Path II: To Prestab Chamber
Path II: To Interferometer and test output
[Hudson, Melissa] We added a fine temperature control circuit to the breadboard OPO's thermal controls. As with the compact squeezer, this setup allows the temperature to be controlled in "coarse" or "fine" modes where the coarse mode allows us to servo the temperature to near 34 degrees and the "fine" mode has better temperature resolution near 34 degrees but will saturate far from 34 degrees. The circuit diagram is shown below. The fine temperature control loop, which we expect will be used in normal operation from now on has a UGF of 50 mHz, 37 degrees of phase margin, and a gain margin of about 2, as shown in the transfer function below.
The fine control's integrator value should be 0.015 and proportional value should be 2.0
I updated the scripts for the BSQZ to give calibrated transfer functions and noise spectra. This concerns lockBreadboardOpo.py, clf2_AOM.py for the three loops OPO PDH, CLF 2f, CLF-LO.
For all three loops:
Details of the OPO PDH loop:
Details of the CLF 2f and CLF-LO loops:
Results:
See the plots attached for examples of calibrated TFs and spectra. With the current tuning of the loops, I manage to have 1.5 kHz of UGF on the OPO PDH, 5 kHz of UGD on both the CLF 2f and the CLF LO. The phase noise is negligible on the OPO PDH (<1 mrad), while it is around 2 mrad on both the CLF 2f and the CLF LO loops.
Conclusion:
The BSQZ now has calibrated plots which we can use to quantify the efficiency of our loops.
I locked the Mach-Zehnder with the compact squeezer in alignment mode (30 uW of power into the interferometer's input port) with a proportional gain of 10 and an integrator corner frequency of 600 Hz. This resulted in a loop with a UGF of about 3 kHz and about 50 degrees of phase margin (see below). Converting volts on the homodyne detector to phase units using phi = pi/delta_V where delta_V is the peak-to-trough voltage on the interferometer's homodyne when the interferometer is scanned, I find that the RMS phase noise is about 13 mrad. There is a clear structural resonance at about 5 kHz, as can be seen on the spectrum below, but this is not the dominant contribution to the phase noise spectrum. The dominant source of phase noise in the loop is the red pitaya's DAC/ADC noise. As 13 mrad represents a best-case scenario phase noise for the interferometer, it is likely that we may need to switch the MZI controls from a red pitaya to an analog circuit to avoid the red pitaya's poor low-frequency noise performance.
Jacques, Melissa, Hudson
Motivations:
We therefore decided to implement a dither lock loop on the BOPO, similar to the one on the CSQZ, in order to decouple the thermal fluctuaions form the intensity fluctuations of the BSQZ CLF.
Experimental setup: The loop is implemented by using the RP CSQZ1.mit.edu (the same one used for the BOPO's usual PDH lock), whose input 2 is now connected to the CLF REFL PD + DC BLOCK. with maximum CLF power (90% of the fiber BS going to the CLF path), we can lock the loop. Furthermore on the PZT drive we use a 510 Ohm resistor instead of the 30 kOhm one. The code for the dither lock is in the file opoDitherLock2.py.
Results: The loop closes and is stable with the default parameters (quadrature factor = 1, dither amplitude = 0.01, dither frequency = 17 kHz, autogain = 1. It is a soft loop for now as can be seen from its TF here because increasing the gain seems to make the transmitted power oscillate, and we are quite close to the SNR limit on the "in2" of the RP (see error signal shape here) which sees the 17 kHz dither of the CLF REFL PD. If needs be we can always add an amplifier on this path to improve the SNR (SR560-style as the minicircuit ones don't go as low as 17 kHz).
Conclusion: the dither loop should be well-tuned enough to allow us to proceed towards sending the BOPO into the MZI and do alignments.
The dither lock only acquires lock when the CLF beam is well aligned into the cavity. This means that in alignment mode, we should keep the CLF at 15MHz detuning, but detune the LO by that same amount in order to see visibility fringes.
To switch from squeezing to alignment: (1) Swap 90 and 10% output fibers so 90% of light goes to OPO CLF path and 10% of light goes through AOMs to the homodyne (2) Remove the 30k resistor in series with the 500 ohm resistor and the OPO's piezo (3) Adjust ND filter in front of RF reflection PD so signal is in 5-10V range but PD is not saturated. (4) Connect output of IR reflection RFPD with a DC block to the CSQZ1 IN2 port on the BOPO's cable patch board. To switch from alignment to squeezing: (1) Swap 90 and 10% output fibers so 10% of light goes to OPO CLF path and 90% of light goes through AOMs to the homodyne (2) Add back the 30k resistor in series with the 500 ohm resistor in series with the OPO's piezo (3) Adjust ND filter in front of RF reflection PD so signal is in 5-10V range but PD is not saturated. (4) Connect cable labeled "532 trans" to IN 2 of the red pitaya CSQZ1 (used for breadboard OPO PDH lock)