Displaying reports 441-460 of 1025.Go to page Start 19 20 21 22 23 24 25 26 27 End
Reports until 21:04, Monday 14 October 2024
SQZ General
wenxuan - posted 21:04, Monday 14 October 2024 (11804)
LASTI VOPO rough alignment

Eric, Wen

We did a rough alignment of the VOPO cavity after installing the input paths. The pump and seed beams were delivered via the long in-air fibers wrapped with protective foam. We were able to see and align the beam spots traversed the round trips of the cavity. It was difficult to see the transmitted beam of either green or red; a PD and a camera would be needed to do a finer alignment. Unfortunately, there's not much space in the small clean room to install the sensors. Instead, we'll put the circular breadboard into the vacuum tank once we receive the new table legs. This will free a lot of space. 

Images attached to this report
SQZ General
eoelker - posted 15:51, Sunday 13 October 2024 (11803)
VOPO breadboard input paths

Did some assembly of the input paths.  The CLF (orange) and front seed (red) paths use the standard mode matching solution for the VIP CLF paths at the sites.  Attached is a picture of what has been completed so far.  Components are as follows:

Notes/thoughts:

 

 

Images attached to this report
SQZ General
eoelker - posted 10:46, Sunday 13 October 2024 (11802)
BECKHOFF SQZ2 Middle Rail fixed

Last week, I'd done some repair work on the SQZ2 and SQZ3 TwinCAT I/O chassis after a brief power outage took both units down.  During that work, I also repaired the middle rail for SQZ2 (controls the OPO common mode board) by replacing the EtherCAT 1100 adapter at the front of the rail.  Last week, I was getting error messages when I attempted to reboot the BECKHOFF with SQZ2 Mid Rail enabled.  I decided to bypass it again and fix the issue later.

Turns out, all I needed to to was:

  1. Stop the system
  2. Enable SQZ2 Mid Rail
  3. Click "Generate mappings", "Check Configuration, and then "Activate Configuration" in the system manager
  4. Start the system
  5. Restart tcIOC

Seems to be working now.  We should be able to use the OPO servo next week for locking the LASTI VOPO prior to installing it in the old VOPO tank.

SQZ General
eoelker - posted 18:11, Saturday 12 October 2024 (11801)
Pump to OPO path solution

I measured the mode of the 532 nm collimator this afternoon.  This measurement was done using the old fiber feedthrough from the LASTI X HAM.  I made sure to coil the fiber a bit to ensure sufficient bending loss for any higher order mode content (these old homemade UHV fibers weren't quite single mode for green if memory serves).  I measured a waist disstance of .363 meters and a beam waist size of 156 um (radius).  Surprisingly, this gives > 99% mode matching to the VOPO if the fiber collimator is placed 12" away from M1 (VOPO input coupler).   Looks like we don't need any mode matching lenses on this path.  

For reference, here are the q values at the fiber collimator output:  q_x (used for mode matching) = -0.36342+0.14517i,   q_y =  -0.3708+0.158i

Non-image files attached to this report
SQZ General
wenxuan - posted 17:43, Friday 11 October 2024 (11800)
OPO 1064-nm seed path power budget

The optical path delivering seed is recovered. The old set-up merges the seed or CLF light in free space before sending them to the same fiber. This is not a good design; instead, we should use the site's design where the seed and CLF are coupled in separate fibers, which will merge in a fiber BS. The current design is attached in the picture.

As I recovered the seed fiber alignment, I saw some unsettling amplitude modulation of the laser beam. As I traced back upstream, I found both PBS cube mounts had broken clamping arms. This proves that these types of cube mounts are not good enough for long-term operation. I've replaced them with metal ones that sandwich the cube between two plates. 

The seed beam is now coupled to the fiber with 89% efficiency. 

Images attached to this report
SQZ General
eoelker - posted 09:59, Friday 11 October 2024 (11799)
VOPO tank mode matching and fiber collimators

[Wen, Eric]

We found a number of spare Class-A fiber collimators in the orange lab, and plan to use them to assemble the new VOPO 10 dB setup in the VOPO tank.  These are of the O3 variety, so are no longer as useful as site spares (the spares page has been updated).

We plan to implement an existing layout solution for the CLF and 532 injection paths for the VOPO cavity (with tweaks for fiber collimator measurement).  After some digging on the DCC we were able to find the desired documentation:

SQZ General
wenxuan - posted 17:19, Wednesday 09 October 2024 (11798)
OPO 532-nm path power budget

Eric, Wen

 

Now that the SHG is working with good efficiency, we aligned the green path on the SQZ table to deliver the pump light to the VOPO. The power budget of the path is shown in the attachment. We got about 78% coupling to the fiber using the old set-up. The pump out of the fiber is around 30 mW, and can potentially be increased to 87 mW for the VOPO NLG sweep in the future. We'll clean up some hardwares before the vacuum prep lab shutdown and continue aligning the seed path tomorrow.

Images attached to this report
SQZ General
eoelker - posted 16:33, Tuesday 08 October 2024 (11797)
New SHG Working well

[Wen, Eric]

After some morning woes with the Beckhoff, we were able to get the slow controls up and running again.  Now that the servo electronics have been updated, we decided to finish setting up the new SHG.  The loop is now locking nicely with a 1.2kHz UGF and 60 deg of phase margin.  We could afford to increase the boost corner frequencies later if we decide we'd like a bit more suppression around 100 Hz (currently all three are set to 2.5Hz/50 Hz Pole/Zero boosts). 

The SHG efficiency seems fine.  With 224 mW incident @1064 nm, we are getting about 125 mW of 532 nm.  About 56% conversion efficiency at this input power level.  Probably could do a bit better if we further optimize the temperature.

Images attached to this report
Heisenberg IFO General
hudsonl - posted 10:44, Monday 07 October 2024 (11793)
MZI Lock with Analog Electronics
[Hudson, Melissa]

We switched the Mach-Zehnder interferometer's locking electronics from a red pitaya to analog electronics. This improved the RMS phase noise from about 250 mrad to about 9 mrad when locking with 2 uW of incident laser power on one interferometer input port. Above 0.5 Hz, the relevant low-frequency bound for our planned 2 second measurement(set by the red pitaya's memory and acquisition rate), the RMS phase noise is now 3.0 mrad. 

Assuming we decrease the power further by a factor of 4, we anticipate having roughly 12 mrad of RMS phase noise from the interferometer, which should still be low enough not to degrade squeezing substantially. The upshot is that we have experimental confirmation that there exists a CLF power level that is simultaneously high enough to lock the interferometer and low enough to allow us to measure high levels of squeezing. 

The measured 3 mrad of phase noise is also consistent with a theoretical model of the interferometer laid out in section VI.A of the attached document, which anticipates 0.8 mrad of RMS phase noise for an interferometer with phase noise suppressed to the shot + electronics noise level from 0 to 10 kHz.
Images attached to this report
Non-image files attached to this report
SQZ General
eoelker - posted 10:02, Monday 07 October 2024 - last comment - 15:08, Tuesday 08 October 2024(11794)
SHG Common mode servo mods

I made some modifications to the SHG Common mode board since the existing values made no sense to Wen and me.

Mods:

  1. Common offset stage: R27 -> Reduced from 20k to 2k to lower broadband gain by 20 dB
  2. Common Comp stage:  Gain reduced by 20 dB at high frequencies.  PZ pair lowered to 1 Hz/100 Hz.  R51, R53 -> 1.58k.  R52 -> 158k.  C102 -> 1uF
  3. Common Boost Stages:  All three changed to 2.5Hz/50Hz PZ pair.  R55, R57, R59 -> 45.3k,  R60, R61, R62 -> 2.49k,  C99, C100, C101 -> 1uF

 

Now we just need to change the PZT driver to have a 100 Hz output Low Pass and the servo should have the desired TF.

Non-image files attached to this report
Comments related to this report
eoelker - 15:08, Tuesday 08 October 2024 (11796)

Added an output low pass filter on the SHG PZT driver board output: R=3.1k, C=470nF.  100 Hz

GRAVITES Optics 1550nm
eoelker - posted 17:54, Sunday 06 October 2024 (11792)
1550.12 nm BASIK laser breadboard setup

Setting up our two new BASIK lasers.  Below is a list of connections and corresponding power levels for the 1550.12 nm laser.  The losses for the beamsplitters are a bit higher than in the other setup.  I suspect that is because they've been in use for a while and the connectors are a bit worn; The components on the 1545 setup are all brand new.  I did my best to clean the connectors.

Path I: Laser, AOM, Beamsplitter

  1. Laser to Faraday Isolator connection:  Measured 40 mW
  2. Faraday to 40MHZ AOM connection:  34.5 mW
  3. 40MHz AOM to 90/10 BS port 1: 22 mW with +24 dBm RF Drive (max from Marconi 2026)

Path II:  To Prestab Chamber

  1. 90/10 BS port 2 to ILP1: 1.87 mW
  2. ILP1 to EOM: 1.68 mW
  3. EOM to ILP2: 0.87 mW
  4. ILP2 to DWDM TRANS: 0.80 mW
  5. DWDM Common to Faraday Isolator:  0.7 mW
  6. Faraday Isolator to Chamber:  0.65 mW

Path III:  To Interferometer and test output

  1. 90/10 BS port 3 to 50/50 BS port 1: 16.0 mW
  2. 50/50 BS port 3: 6.7 mW
  3. 50/50 BS port 2: 6.5 mW
GRAVITES Optics 1550nm
eoelker - posted 13:58, Sunday 06 October 2024 (11791)
1545 BASIK breadboard setup

Setting up our two new BASIK lasers.  Below is a list of connections and corresponding power levels for the 1545 nm laser

Path I: Laser, AOM, Beamsplitter

  1. Laser to Faraday Isolator connection:  Measured 40 mW
  2. Faraday to 40MHZ AOM connection:  33 mW
  3. 40MHz AOM to 90/10 BS port 1: 22 mW with +24 dBm RF Drive (max from Marconi 2026)

Path II:  To Prestab Chamber

  1. 90/10 BS port 2 to ILP1: 2.0 mW
  2. ILP1 to EOM: 1.8 mW
  3. EOM to ILP2: 1.0 mW
  4. ILP2 to DWDM REFL: 0.9 mW
  5. DWDM Common to Faraday Isolator:  0.85 mW

Path II:  To Interferometer and test output

  1. 90/10 BS port 3 to 50/50 BS port 1: 18.9 mW
  2. 50/50 BS port 3: 8 mW
  3. 50/50 BS port 2: 8 mW
Heisenberg IFO General
hudsonl - posted 12:41, Thursday 03 October 2024 - last comment - 12:42, Thursday 03 October 2024(11789)
Breadboard OPO Fine Temperature Control
[Hudson, Melissa]

We added a fine temperature control circuit to the breadboard OPO's thermal controls. As with the compact squeezer, this setup allows the temperature to be controlled in "coarse" or "fine" modes where the coarse mode allows us to servo the temperature to near 34 degrees and the "fine" mode has better temperature resolution near 34 degrees but will saturate far from 34 degrees. The circuit diagram is shown below.

The fine temperature control loop, which we expect will be used in normal operation from now on has a UGF of 50 mHz, 37 degrees of phase margin, and a gain margin of about 2, as shown in the transfer function below.
Images attached to this report
Comments related to this report
hudsonl - 12:42, Thursday 03 October 2024 (11790)
The fine control's integrator value should be 0.015 and proportional value should be 2.0
Heisenberg IFO General
jacques - posted 21:08, Wednesday 02 October 2024 (11788)
New scripts for BSQZ to produce model transfer functions and calibrated phase noise plots

I updated the scripts for the BSQZ to give calibrated transfer functions and noise spectra. This concerns lockBreadboardOpo.py, clf2_AOM.py for the three loops OPO PDH, CLF 2f, CLF-LO.

For all three loops:

Details of the OPO PDH loop:

  1. To calibrate the TF model H_OL, I need the PDH slope as seen by the measureErrorSignal function (k_PDH in Volt/Volt), and because the PZT is put in series with a 30 kOhm resistor, it acts as an integrator. I manually tuned this integrator frequency to optimally match the measured data and left it at 25 in the code of "H_OL". Additionally, k_PDH is defined by default in the script to be 20. It depends on the GR power so you need to report the value printed when the lock() function is executed, into the parameter "k_PDH = ..." of the "opoNA(...)" function.
  2. To calibrate the cumulated phase noise, I need to convert the spectrum from voltage units to phase units. To do this I need to know the k_PDH as well as the voltage required to move the mirror PZT by an FSR. I measured this once by looking at the plotted scan on the measureErrorSignal function, to be equal to 0.04V. This is the parameter Delta_V_FSR and it is assumed fixed. Note therefore that the phase noise that is output by this method corresponds to the phase noise on the pump field, not any of the IR fields.

Details of the CLF 2f and CLF-LO loops:

  1. To calibrate the TF model H_OL, I need the Moglabs's FM gain (fixed at 2 kHz/V on the code for both loops) "G_FM_Hz" & "G_FM_Hz" (there is a factor of 2 on the latter because a shift by 1 Hz on the CLF changes the CLF 2f beatnote by 2 Hz), the beatnote amplitude "P_avg" (computed automatically) and the Moglabs's channels' reponse times "tau_moglabs_CLF_pump", and "tau_moglabs_CLF_LO", which I calibrated manually to best fit the phase responses' drops.
  2. To calibrate the amplitude of the beatnote "P_avg", I use iq_clf2 and demodulate the error signal at the same frequency as the iq module doing the loop, but at a demodulation angle 90° away from it, such that I look at the amplitude quadrature. I then take the average of a scope trace of that demodulated quadrature and output the result, which should be the amplitude of the beatnote when the loop is locked. This is done in the functions "measure_CLF_LO_beatnote" and "measure_CLF_2f_beatnote_amplitude".
  3. To calibrate the cumulated phase noise, I need to conver the spectrum from voltage units to phase units. To do this I need to know the conversion from the error signal's voltage unit into phase units. This is just given by the amplitude of the beatnote "P_avg", as it's a sine wave betanote(t) = P_avg * sin(w t + phi(t))  which once demodulated properly and phi(t) taken small, approximated to P_avg * phi(t). The measurement process for "P_avg" has been described in the point above.

Results: 

See the plots attached for examples of calibrated TFs and spectra. With the current tuning of the loops, I manage to have 1.5 kHz of UGF on the OPO PDH, 5 kHz of UGD on both the CLF 2f and the CLF LO. The phase noise is negligible on the OPO PDH (<1 mrad), while it is around 2 mrad on both the CLF 2f and the CLF LO loops.

Conclusion:

The BSQZ now has calibrated plots which we can use to quantify the efficiency of our loops.

 

Non-image files attached to this report
Heisenberg IFO General
hudsonl - posted 19:46, Wednesday 02 October 2024 (11786)
Mach Zehnder Phase Noise
I locked the Mach-Zehnder with the compact squeezer in alignment mode (30 uW of power into the interferometer's input port) with a proportional gain of 10 and an integrator corner frequency of 600 Hz. This resulted in a loop with a UGF of about 3 kHz and about 50 degrees of phase margin (see below). Converting volts on the homodyne detector to phase units using phi = pi/delta_V where delta_V is the peak-to-trough voltage on the interferometer's homodyne when the interferometer is scanned, I find that the RMS phase noise is about 13 mrad. There is a clear structural resonance at about 5 kHz, as can be seen on the spectrum below, but this is not the dominant contribution to the phase noise spectrum. 

The dominant source of phase noise in the loop is the red pitaya's DAC/ADC noise. As 13 mrad represents a best-case scenario phase noise for the interferometer, it is likely that we may need to switch the MZI controls from a red pitaya to an analog circuit to avoid the red pitaya's poor low-frequency noise performance.
Images attached to this report
Heisenberg IFO General
jacques - posted 16:04, Wednesday 02 October 2024 - last comment - 20:03, Wednesday 02 October 2024(11785)
Added Dither lock on BOPO

Jacques, Melissa, Hudson

Motivations:

  1. The CLF power at the output of the BOPO is unstable over seconds, whether the BOPO is in parametric amplification (34°C) or not (23°C). The suspected issue is that we are locking on GR-IR coresonance, therefore any temperature fluctuation induces an intensity fluctuation of the CLF. Furthermore, when at the setpoint at 23°C, we stil see ~20% of parametric amplification on the CLF power over time (when it's at an effective 0 detuning), meaning that this temperature setpoint still sees a little bit of parametric amplification.
  2.  In order to properly do the alignment and visibility assessments on the MZI, we need the BSQZ's CLF power to be stable over time.

We therefore decided to implement a dither lock loop on the BOPO, similar to the one on the CSQZ, in order to decouple the thermal fluctuaions form the intensity fluctuations of the BSQZ CLF.

Experimental setup: The loop is implemented by using the RP CSQZ1.mit.edu (the same one used for the BOPO's usual PDH lock), whose input 2 is now connected to the CLF REFL PD + DC BLOCK. with maximum CLF power (90% of the fiber BS going to the CLF path), we can lock the loop. Furthermore on the PZT drive we use a 510 Ohm resistor instead of the 30 kOhm one. The code for the dither lock is in the file opoDitherLock2.py.

Results: The loop closes and is stable with the default parameters (quadrature factor = 1, dither amplitude = 0.01, dither frequency = 17 kHz, autogain = 1. It is a soft loop for now as can be seen from its TF here because increasing the gain seems to make the transmitted power oscillate, and we are quite close to the SNR limit on the "in2" of the RP (see error signal shape here) which sees the 17 kHz dither of the CLF REFL PD. If needs be we can always add an amplifier on this path to improve the SNR (SR560-style as the minicircuit ones don't go as low as 17 kHz). 

Conclusion: the dither loop should be well-tuned enough to allow us to proceed towards sending the BOPO into the MZI and do alignments.

Images attached to this report
Comments related to this report
jacques - 20:03, Wednesday 02 October 2024 (11787)

The dither lock only acquires lock when the CLF beam is well aligned into the cavity. This means that in alignment mode, we should keep the CLF at 15MHz detuning, but detune the LO by that same amount in order to see visibility fringes.

Heisenberg IFO BOPO
hudsonl - posted 15:30, Wednesday 02 October 2024 (11784)
Breadboard OPO Squeezing and Alignment Configurations
To switch from squeezing to alignment:

(1) Swap 90 and 10% output fibers so 90% of light goes to OPO CLF path and 10% of light goes through AOMs to the homodyne
(2) Remove the 30k resistor in series with the 500 ohm resistor and the OPO's piezo
(3) Adjust ND filter in front of RF reflection PD so signal is in 5-10V range but PD is not saturated.
(4) Connect output of IR reflection RFPD with a DC block to the CSQZ1 IN2 port on the BOPO's cable patch board.

To switch from alignment to squeezing:

(1) Swap 90 and 10% output fibers so 10% of light goes to OPO CLF path and 90% of light goes through AOMs to the homodyne
(2) Add back the 30k resistor in series with the 500 ohm resistor in series with the OPO's piezo
(3) Adjust ND filter in front of RF reflection PD so signal is in 5-10V range but PD is not saturated.
(4) Connect cable labeled "532 trans" to IN 2 of the red pitaya CSQZ1 (used for breadboard OPO PDH lock)
Displaying reports 441-460 of 1025.Go to page Start 19 20 21 22 23 24 25 26 27 End