The old VOPO/PSAMs tank that used to live in the green lab sustained some mild water damage along the top sealing surface during last year's flood. A few months ago, I removed the corrosion with citranox and cleaned the oring while we were removing the PSAM components from the chamber. This morning, I removed the remaining PSAM cabling, wiped down the inside of the chamber, and resealed the lid.
I hooked up the micromirror pumping station to the chamber and am now pumping down to see if the lid is still able to hold a decent vacuum. Right now we're at 9e-4 and dropping. Its been a long time since I've used this chamber, so I don't recall what base pressure I was able to reach in the past, but if we get into the 10^-5's it is still servicible.
The actual turbo for the chamber should have a higher pumping speed than this pump station given its long narrow bellows connection. We need a computer connection to run that turbo again as well as a roughing pump. Looks like someone walked off with the old scroll pump for that chamber.
If I had a computer set up in our cleanroom, I'd make a pumpdown curve, but alas...
Malo had previously noticed that the PLL, when locked, corresponded to the "wrong side" of the lockpoint (beatnote of 2*51MHz = 102MHz between the two lasers instead of locking them at exactly the same frequency). I made a fiber setup to directly probe what the beatnote with the two lasers is on a 150MHz Thorlabs PD sent to the Agilent. I solved the issue of the lock setpoint by changing the sign of the slow loop. As of this evening, the command that locks the PLL on the correct side is:
PID_response_full(offset_slow=0.112, prop_fast_final = 0.018, integral_slow = 0.001, integral_fast_final = 35, swap_gain_signs=True, ramp_up_gains=True)
I successfully clocked an externally clocked Red Pitaya using a LTC6957-2 logic converter (in the form of a DC1765B evaluation board). Unlike with previous logic converters, this method appears to be stable; my past logs using different logic converters should be ignored in favor of this one. In this case I used a click shield to make it easy to use this RP as a master device and sync it to other devices as Hudson describes here, however, the click shield is not strictly necessary. The clock signal is a sine wave at 5dBm, 122.88MHz (125MHz also works) from a SG384. The jumpers should be positioned according to the LTC6957 datasheet (a functional configuration is shown in an attached image). FILTA/B should be repositioned according to the input frequency and amplitude; SD1/SD2 enable/disable OUT1/2 respectively (L = enabled, H = disabled).
The output is connected to the clk + and clk - pins on the click shield using SMA to UFL cables; the eval board is powered off one of the 3.3v pins on the click shield (also visible in attached images). In the absence of click shields it would be possible to clock two RPs off of the same demo board as there are two outputs on each demo board.
The number of the pins on the connector interfacing the vacuum chamber of the pre-stabilization setup are:
I spliced together the interferometer for the GRAVITES laser frequency prestabilization chamber. I'm getting around 97% visibility in the Michelson after balancing powers with the VOAs. Should be sufficient based on the reference we're aiming for. I also wired up the temperature sensors for both shields and the heater for the outer shield baseplate. Just a few tasks left before we can close up and pump down:
To confirm the suspicion of a vacuum chamber leak, I verified that the pressure no longer decreases when the pump is activated but rises progressively over time.
At the beginning of last week we measured 1.9 torr while at the end of last week 2.95 torr and today 3.95 torr.
Made beam profile of CLF beam from the breadboard squeezer. The beam radius is 267 um for x-axis and 263 um for y-axis.
Once CLF and LO are locked, 6.1 dB squeezing and 13.8 dB Anti-Squeezing are observed by the breadboard squeezer as shown in attached photos. Homodyne Visibility is 97.9 % when the room temperature is 20.5 ℃ but This squeezing measurement were done with 25.8 ℃, Therefore the homodyne visibility should be worse than 97.9 %. The main parameters are as follows. Input pump power: 60 mW Non-linear gain: 11.65 The temperature of PPKTP crystal in OPO: 34.12 ℃ CLF transmission power: About 200 nW
[Adam, Nikhil, Kevin]
We are working on an alignment controller for the ZM4 & ZM6 mirrors of the LLO squeezer. These mirrors are located between the squeezer filter cavity and OMC. The existing AS42-based control loop is currently not engaged as it suffers from drift-related issues. Our idea is to simulate the system using Finesse3, look at DARM as the final metric, and see if a controller can optimize the mirror alignments by maximizing the IFO sensitivity. For that, we needed to simulate the full LLO interferometer with the squeezer component.
We used the IFO configuration files from the IFOSim/LLO_Commissioning_Modeling GitLab repository for the simulation. We also cross-checked the parameters with Begum (LLO) and Aaron (Caltech).
The current model by default uses only plane wave approximation (modes="off"), and hence we need to include higher order TEM modes to fully capture the effects of misalignment and mode-mismatch. However, we noticed some issues. To debug, we examined the Quantum Noise Budget and Sensing Functions for the various scenarios.
Quantum Noise Budget
Plot 1 (Name: Quantum_Noise.png ):
We examined Quantum Noise plots with and without adding the Squeezer (factory.options.SQZ.add = True). After adding SQZ, we set SQZ to 0 dB (fa.Change({"SQZ.db": 0})) and generated plots for different scenarios - modes: "off", model.modes("even", maxtem=2), model.modes(maxtem=2), and model.modes(maxtem=1). We also examined the same plots for the scenario where SQZ was not added.
With and Without the Squeezer - The plots matched in the cases of modes = "off" but didn’t match in other cases. For model.modes("even", maxtem=2) and model.modes(maxtem=2), the plots were slightly different from the plot for modes = "off" in the case without the SQZ. This could be because of potential mode-mismatch between the IFO and filter cavity. We are working with Begum & Aaron to get the accurate values for the various parameters (radius of curvature, filter cavity length, etc.). However, in the case when we include a simplified Squeezer component but set the squeezing level to Zero dB, model.modes("even", maxtem=2) and model.modes(maxtem=2), the plots were very different from modes = "off".
Sensing Functions (Plots for all the different scenarios are added)
In the case of Plot 3 (Name:DARM_Sensing_Maxtem_1_With_SQZ_set_to_0_dB.png):
We will be investigating more about the issue this week.
[Masaya, Hudson] We installed the external clock red pitayas in the breadboard OPO's electronics box (see attached images). We also ensured that the external clocking is functioning properly and that they're connected to the wifi by connecting to these devices remotely with my laptop. We were able to successfully connect to all three devices. They should now be ready for use in feedback control of the interferometer.
I have recovered the PLL after several months. There was no issue at all in the recovery process, meaning that it only took me ~30 minutes to close the PLL from scratch. The procedure is written here.
I first had to optimize the DC voltage on the PLL PD from the light power on the Diabolo side by changing the polarization paddles and the attenuator. I then blocked the Diabolo light using the attenuator and optimized the power on the Lightwave's side. To do this I had to slightly realign the input fiber coupler after the AOM setup.
Now the Ligtwave path has input 3mW to the PLL, and 0.5mW after the PBS, before the PLL PD. The Diabolo path is stable at 0.25mW after the PBS, before the PLL PD.
I had to search for the common laser temperature setpoint by tuning the lightwave's temperature to >35°C, while the temperature of the DIABOLO showed 34.81°C. The loop is then closed and the monitored error signal was centered on 0 with a 200-500mV thickness. The TF of the loop is attached and is very similar to the one taken months ago.
Note that the PLL should only be necessary for obtaining a beatnote between the two CLF beams of the two SQZ setups, or making the actual measurement. Alignment or mode matching to the MZI should not require the PLL.
[Eric, Eleonora, Jaime] Today, we continued working on the Michelson interferometer for the pre-stabilization setup. First, we viewed the fringes on the oscilloscope and adjusted the VOAs in each arm to maximize visibility, which is currently at 79%. We then reduced the AOM drive from 24 dBm to 5 dBm to avoid saturating the signal mixer. Additionally, we incorporated the temperature controller for the EOM to stabilize the phase modulation. Next, we added an inline polarizer after the EOM, which allowed us to properly measure the residual amplitude modulation. While monitoring the demodulated error signal(image attached), Eric noticed an oscillation with a frequency of about 1 Hz, corresponding to a frequency drift in the laser of 200 kHz/s. This drift lies outside the VCO’s range of 100 kHz. Finally, I conducted a power budget for the setup while driving the AOM at 5 dBm: After first Faraday isolator-67.6mW After 90/10 beam splitter to AOM-4.43mW After AOM-79.0μW After 50/50 beam splitter to second Faraday isolator-26.90μW After second Faraday isolator-24.84μW After EOM-13.10μW After Polarizer-11.44μW At photodiode-≈2.3μW Tomorrow, we will tune the integrators on the servo board I made and act on the PZT of the laser to correct the drift.
We had an issue on the previous logbook post, where the demod_freq of the CLF-pump loop needed to be adjusted by 25 mHz from the CLF-LO loop. This is now explained as a rounding error by the Red Pitaya. One can show theoretically that this issue is independent of the frequency of the Moglabs.
The pdf document attached explains the issue and the solution.
I copy paste the solution here: To mitigate this issue in the future, we should ideally choose demodulation frequencies which are integer multiples of 125 MHz/232 = 29.103830456733704 mHz.
Malo, Jacques
The goal of today (Saturday July 13th) was to finish the cSQZ recovery and measure SQZ. We started from yesterday by putting the moglabs' RF outputs at 105MHz sharp and 95MHz sharp.
The first task was to debug the CLF and LO loops. Indeed, with the new fiber disposition and HD board, the error signal amplification/ attenuation had to be rethought for these two loops. I added a function plotErrorSignal() in the clf.py script. This allows one to get a plot of any input demodulated. Doing so on the CLF-pump error signal ("in2" on redpitaya27 with demod_freq = 20e6 Hz (see below for this small offset)) and the CLF-LO error signal ("in1" with demod_freq = 10e6), I realized that both were saturating because they were above 1V in amplitude. We therefore had to remove an amplifier on the CLF-pump cable path, and add a -20dB attenuation on the CLF-LO cable path (out of output "RF2" of the new HD). Then, we can see that the demodulated error signals are spanning +- 0.6V, which means that they are correctly calibrated.
The interaction between the OPO's IR coresonance plot and the CLF REFL PD goes as follows:
1/ reduce the CLF power using the paddles so as to see a nonsaturating IR resonance when the OPO is scanned (use opo.measureIrResonance() to get the IR plot only)
2/ tune the tempearture of the OPO while scanning to have the transmitted CLF almost overlap with the green resonance (today it was at 32°C).
3/ lock the OPO
4/ Increase the CLF power again to max, or such that it is visible on the transmission PD, simultaneously, optimize the CLF parametric amplification using tec.opoSetpoint(31.95). This is sensitive to the 0.01°C level.
5/ Close the CLF-pump loop.
6/ Then, if there is too much CLF preventing one from measuring a correct SQZ level, reduce the CLF power by using the VOA (do not use the paddles; they should always be in the optimal polarization position in order to reduce the polarization fluctuations).
7/ Reclose the CLF-pump loop if necessary.
In the meantime, Malo optimized the visibility on the PD by putting the CLF at zero detuning when the OPO was locked on coresonance and out of parametric amplification, reaching about 96% visibility on the HD. See the three scope pics here, here and here for the measured max/min voltages and the bias voltage of the HD output. We then tried to close the CLF and LO loops with similar PI gains than before (demod frequencies respectlively 20MHz and 10MHz) and look on the spectrum of the DC port of the HD to see if there was any squeezing. While we indeed saw that the spectrum dipped below shot noise, it was clear that the noise level was slowly periodically oscillating between SQZ and aSQZ, on the scale of several tens of seconds. This was strange since we thought that all the loops were closed properly: I could plot the demodulated error signals of the CLF-pump and CLF-LO using "plotErrorSignal(...)" and I indeed saw that they were around 0 when the loops were closed.
We then decided to quantify this periodicity by plugging the HD DC on the scope and measuring any periodic signal over the course of several minutes, with all the loops closed. In a perfect world, since there is always the beatnote between the LO and the 10MHz CLF, we would expect a constant amplitude, 10MHz oscillation. This was not what we observed, as seen on the picture of the scope attached here. Rather, we saw a very periodic oscillation of the CLF-LO beatnote, with frequency ~25mHz.
I looked at the LO PZT voltage shown on the thorlabs driver and saw that it was stable over this oscillation. This lead us to believe that this slow oscillation comes from the CLF-pump loop, which effectively was making the SQZ/aSQZ quadratures rotate at this slow frequency.
We tried to investigate this effect further, by changing the CLF-pump loop's demodulation frequency by 25mHz, i.e going from "demod_freq = 20e6" to "demod_freq = 20e6+0.025". This is further motivated by the facts that
1/ the CLF-pump loop's modulation and demodulation devices are separate and not clocked together: the modulation is made by the moglabs, while the demodulation is made by the RP.
2/ we know that the moglab's displayed output RF frequency is not reliable, as it had been noticed several times before that the moglab could produce a signal that is offset from the displayed frequency for no apparent reason.
Doing so, and locking the CLF-LO loop without any offset from 10MHz, allowed us to stabilize the SQZ spectra. By lowering the CLF power (we did not try to reduce it as much as possible), we were able to resolve between 6.5 and 7 dB of SQZ, versus up to 13.5 dB of aSQZ. In absolute values, we had -118dBVrms/rt(Hz) of shot noise, <-150dBVrms/rt(Hz) of electronic noise, -104.5 dBVrms/rt(Hz) of aSQZ and -124.5 dBVrms/rt(Hz) of SQZ. See attached plots here and here. While the aSQZ level is comparable to the max which was previously measured on the setup (makes sense since the GR power is more or less the same), the SQZ level is significantly better than before, which implies that the HD mode-matching was the limiting loss contribution for SQZ observation.
I will push the code I used today on the git.
TBD1: change the opo.lockGRonly function for the user to choose their resonance. In the future, only use this function to lock the OPO in order to bypass the annoying CLF power management to lock the OPO on coresonance.
TBD2: push the CLF power even lower (possible since with max CLF power we have no problem detecting the CLF-pump and CLF-LO error signals) to see if it further lowers the observable SQZ floor.
TBD3: optimize the loops params, reduce the PDHs' EOM amplitude modulations to reduce the overall phase noise contamination.
TBD4: pump power scan to obtain a full loss model of the cSQZ.
On the matter of the REFL CLF PD and the coresonance plot: In the future we should use the TRANS OPO IR PD for the IR coresonance plot, instead of the REFL CLF PD. This is because
1/ We already use TRANS OPO IR PD to optimize the OPO temperature to maximize the parametric amlification when locked
2/ The CLF is entering through the undercoupled port of the OPO so resolving the resonance on REFL means distinguishing a ~5mV peak among a ~1V signal, which either makes the RP saturate if the off-resonance part is too strong, or prevents it from seeing any resonance feature because it's too weak. Both of these issues are solved by the TRANS PD because:
a) it is in transmission so the off-resonance voltage is ~0V (i.e. no risk of saturating the RP)
b) it has an internal tunable gain so the on-resonance voltage can be adjusted, usually we can see a peak of ~50mV (i.e. no risk of not seing anything on the RP)
Malo, Jacques & Hudson
We continued the recovery of the cSQZ which started yesterday. We managed to go up to the CLF-Pump and LO-CLF locks, effectively seeing averaged antisqueezing on the HD.
I changed the code of the opo.lockGRonly in order for it to work. It now can lock on GR error function only without needing a coresonance of the IR. I noticed that the opo.measureIr and opo.measureErrorSignal functions did not stop the scan at the end of their excecution, which made stand-alone error signal visualization inconsistent between two consecutive executions of the functions.
It was suspected that the issues related to the CLF REFL PD not consistently outputing an IR resonance on the opo.lock() is due to filtering of the IR resonance scope signal, through the clean_data function. I added parameters which allows one to adjust the lowpass and highpass frequencies in order not to filter the resonance peak. Furthremore, I filtered the first 5% of the data in order not for the lowpass to make artifact peaks appear at the begining of the plot.
Because the CLF REFL PD is looking at the undercoupled port, we have that this resonance signal will not go above ~6mV, out of a ~60mV out of resonance signal (on the scope it's 60mV but there is a x10 amplification before the RP input). Furthermore one needs to be careful that the DC power on this PD never exceeds 100mV on the scope, so that the RP input does not saturate.
To conclude on te IR coresonance signal, it seems that there is no straightforeward way to increase it for free at the moment. We can nevertheless proceed with the current setup.
On the matter of the OPO, the demod phase of the opo.lock seems to be crucial for the stability. However, the opo stability was overall fragile today; I could not find a setpoint such that I could tap on the OPO without breaking the lock, unlike the previous times. Because the error signal seems to sensitive to the demod phase, I suspect that the main green peak that we see when the opo is scanned might not actually only correspond to the 00 mode. Another possibility is that the SHG's 50MHz sideband is also present on the GR. This should be easily alleviated by reducing the modulation amplitude on the SHG's EOM.
I put the CLF at 10MHz detuned from the carrier. This means that there is more loss from the AOMs, such that about 0.5uW of CLF is transmitted out of the OPO on coresonance. Nevertheless, we are able to see it on the RF2 port of the HD.
At some point the new HD board that we were using seemed to have broken, since the optimally balanced situation had a DC out fluctuate by several 100mV. We did not inverstigate this HD further, we simply swapped the electronics board with the other new HD that we had built; we kept the same PDs. Now, with this new HD board, the signals are consistent again: the DC can go to 0, we have <-150dBVrms/rt(Hz) of electronics noise vs -118dbVrms/rt(Hz) of shot noise with 2mW of incident LO power.
Since the BS had to be tuned after this swap, the CLF path is misaligned with the LO. This should be tuned further by unlocking the CLF and maximizing the RF2 beatnote at 10MHz, or look at another signal at DC and put the CLF's detuning close to DC.
To get the CLF-pump phase 20MHz error signal, we had to add a minicircuits amplifier after a bias tee (to get the RF output only).
To get the CLF-LO 10MHz RF2 error signal, it seems that we do not need any amplification, provided that LO and CLF are already well-aligned.
We then tried to close the CLF-pump and CLF-LO loops. Transfer functions could be taken and they made sense, but we could clearly see on the RF2 signal that the amplitude of the (supposedly stabilized) signal is changing over the course of several seconds. This means that these loops are not actually closed in a satisfying manner.
We left the system with the CLF at 0 detuning.
TBD: add a timeout on the clf.lockCLF() in order not to wait for the input acquisition if it's too low in power (we had -60dbm of 20MHz beatnote without amplification)
TBD: add a script on the CLF 20MHz loop to plot an error signal scope trace when the loop is open vs when it is closed.
We just turned on the dehumidifier in the lab at 11:30 am on Friday, July 12th. Currently the temperature is 25.3 C and the humidity is 61%.
By 6pm on Friday (the 12th) the dehumidifier's reservoir had filled up and I emptied it outside. Despite this, the humidity in the lab was still about 65%.
Malo & Jacques
The goal of today was to swap the cSQZ in SQZ mode.
We started by swapping the fiber order to send 90% to the main cSQZ, and swapped the corresponding electronics.
We then measured a power budget with reduced laser power:
- 59mW measured before the laser fiber coupler
- 32mW measured at the input of the EOM UBench on the main path
- 7.2 mW at the entrance of the main path on the cSQZ (the UBench coupling has not been optimized)
- 105uW at the entrance of the CLF on the cSQZ (with 105MHz and -95MHz sent to the AOMs)
- 0.7 mW at LO input
At this stage, the measured powers are consistent with the intended wiring of the fibers.
With the laser power at full blast (450mW), we have 200mW at the entrance of the Ubench, and 50mW at the entrance of the cSQZ.
We then locked on the SHG. We again had issues with the error signal having a constant-like beahvior around zero, like what was encountered here. This was solved by adding another line filter on the SHG REFL PD (so it now has two line filters at 1064nm). We thus manage to obtain up to 26mW of green at the output of the SHG, into the PDH extension board. The green power is stable thanks to the fiber faraday isolator.
We then tried to lock on the OPO but faced 2 problems which will have to be addressed tomorrow:
1/ The lock is not stable again, like what was encountered until several weeks ago when I changed the SHG and the OPO's PDHs modulation frequencies. Now, the OPO lock is still unstable with these different MDH frequencies (50MHz & 53MHz). This needs to be investigated by changing the lockGRonly code to actually work. We should also play on the OPO lock params & the modulation depth.
2/ IR acquisitions by the OPO RP to find coresonance are inconsistent with what is measured on the same PD on a scope when the OPO is scanned. The code for these scan acquisitions needs to be checked.
Note for the future: the CLF is at 10MHz so the CLF-pump loop should demodulate at that frequency. Change the code accordingly.
[Eric, Eleonora, Jaime]
We moved the breadboard thorlabs that was in the hall of the NW22 lab and we used the support table that was in lasti. We moved the measurement setup from the wood table to this new one (putting back the old table in Myron's office). We removed the plastic other 1km spool to have an UMZI.
We were able to move the table radially (HOR: N/S and E/W) but with some cross talks between the two horizontal dofs. The coherence between the correction signal and the guralp signals was very low as well, except for some frequencies. We tried both with the spool inside the box and directly clamped on the table (see Fig. 1). We got good phase signal of the TF at 20Hz and we took this measurment also considering that the two horizontal directions were well decoupled. Fig. 2 shows the signals from the guralp while driving the shaker: in blue the E/W signal parallel to the driving direction, in yellow the N/S perpendicular direction and in purple the vertical one. This behavior corresponds to a resonance. We did not understand which resonance was it but it is unlikely to be the table itself since we noticed it also with the other table.
The TF at 20Hz was -105dB (see Fig. 3) which calibrated gives us:
mag_cal = (mag_lin) * (vco * guralp * rad_cal) * 9.81 / (2 * np.pi * freq**2 ) = 3.6e-11 / g which is in agreement with the radial acceleration on the paper.
We tried to drive the shaker vertically but it was coupling with the horizontal directions. This is due to the fact that the table is too stiff in the vertical direction. We could not do better with our setup and we have no ways of improving it with what we have available around.
We conclude this measurement campain saying that the spool is responding most likely as expected.
This is now at 9e-6. Given the modest pumping speed with the current setup, I think that this pressure level is consistant with there being no catastrophic new leaks in the lid. I'll vent this shortly so we can install the breadboard and the green fiber feedthrough Rich and I removed from HAM X today.