dennis.martynov - posted 20:09, Sunday 02 March 2025 (11906)
ISI feedforward with C-6D in loop
Rich, Den

We moved the bullets and recovered the C-6D balance. Looking back into data, we think the balance was lost due to the large excitation of the vertical C-6D mode by the ISI when it was stabilised with GS-13. The lesson learned that we should keep the C-6D damping loops all the time when C-6D is not in loop.

I have then tested Rich's feedforward filters with the C-6D in loop. The ISI was stabilised with 25 mHz angular blends, 35 mHz X/Y blends, and 100 mHz GS-13 V blend. The results for X/Y are attached below.

The benefit of X/Y feedforward is that we can suppress the ISI motion by an additional order of magnitude around microseism and achieve a total suppression of ~100. The disadvantage is that the ISI's tilt noise suppressed by the RX/RY loops is injected back from the STS-2 ground seismometer. The ground tilt noise enhanced the platform motion by a factor of ~10 below 100 mHz.
Images attached to this report
Heisenberg IFO Data Acquisition
hudsonl - posted 14:39, Saturday 01 March 2025 - last comment - 18:05, Sunday 09 March 2025(11905)
Excess Picoscope ADC Noise
Yesterday, the picoscope channel reading the breadboard OPO's DC differential channel contained a lot of excess ADC noise, and the recorder spectral shape of shot noise was not flat (see attached plot for Feb 28). This was resolved by closing the connection to the picoscope with the python command myPico_inst.close_scope(), unplugging the picoscope from power (a hard reboot), reconnecting the picoscope's power cable, and reconnecting to the picoscope with python. The same procedure should be followed in the future if the data recorded by the picoscope looks odd.

We also note that between the data taken on Feb 28th and March 1st, the BOPO homodyne's LO power level was increased from about 200 uW to 2 mW by swapping the outputs of a 90/10 beam splitter that were previously plugged into the wrong ports.
Images attached to this report
Comments related to this report
hudsonl - 18:05, Sunday 09 March 2025 (11909)
This can also be fixed by closing and re-opening the connection to the picoscope in python instead of unplugging it.
General
sasha - posted 19:32, Friday 28 February 2025 (11904)
Teraxion Noise Continued
Sasha, Evan

Two more Teraxion 1550 nm laser measurements: 

1. Figure: Previous frequency noise measurement converted to displacement noise assuming an interferometer with the arm length difference of 10 cm

2. AM-PM conversion: 0.04 RIN/GHz (0.02 V/GHz frequency response, 0.5 V on the PD)
Images attached to this report
Heisenberg IFO Relative Squeeze Angle Control
hudsonl - posted 14:51, Friday 28 February 2025 (11903)
Squeeze Angle Control Fiber Alignment
I tuned up the coupling from the 1% pickoff to the fiber for the squeeze angle control loop. Earlier this afternoon, the coupling was quite low (a few percent), so one of the optics on this path must have accidentally been moved. The coupling is currently greater than 90%, calculated as follows:

We have 34 uW of IR power out of the CSQZ's OPO, so we should have 34 * 0.5 * 10^-2 uW = 0.17 uW of power in the 1% pickoff port (after the 50/50 BS and the 99/1 BS). The PD used to measure this power is a Thorlabs PDA20CS switchable gain InGaAs PD with a responsivity of 0.55 A/W and a transimpedance gain of 4.75 V/uW, so we expect a total response of 2.6 V/uW.

The expected signal is then 0.17 uW * 2.6 V/uW = 0.44 V. We measure a signal of 0.40 V, indicating that we have 91% coupling efficiency.
TIR General
evanhall - posted 22:25, Thursday 27 February 2025 (11902)
Beam profile for mode-matching into TIR cavity, razor blade method

I attached the fiber output of the 1550 nm RIO planex to a F220APC-1064 collimator. This is V-coated for 1064 nm but seems to work okay at 1550 nm.

5.1 cm after the collimator output I placed an uncoated f = 150 mm lens LB1374 to produce a waist. Then I used a razor blade on a translation stage with a micrometer head to characterize the beam. The waist is 95 µm located 23.4 cm after the collimator.

Using formulas from Kogelnik and Li, the collimator by itself produces an 800 µm waist that is 1.2 m behind the collimator output. The sign of the waist location can be deduced because the 150 mm lens produces a waist after about 180 mm of propagation, so there must be a real, not virtual, image on the other side of the lens.

Non-image files attached to this report
Heisenberg IFO PLL
hudsonl - posted 13:30, Wednesday 26 February 2025 - last comment - 14:26, Wednesday 26 February 2025(11898)
Fixed High Voltage Amp for PLL
The PLL stopped working the other day and we traced the problem back to the high voltage amplifier circuit railing positive, no matter the input control signal. We initially suspected that the problem was with the PA85 high voltage op amp, but it was actually with the AD829 op amp in the U5 slot (see attached circuit schematic). I replaced this op amp and the circuit is now working again. We anticipate that this will revive the PLL, but I have not tested this yet. The circuit it fairly straightforward to debug using its test points and outputs.

In the future, the circuit could be modified to jumper over the differential receiver stage and the stage that uses an optional potentiometer to provide a constant offset, since the circuit does not currently have a potentiometer soldered to it. This would reduce the number of failure modes. However, it seems most expedient to continue working with the circuit as-is until it breaks again.
Non-image files attached to this report
Comments related to this report
hudsonl - 14:26, Wednesday 26 February 2025 (11899)
After fixing the high voltage amplifier, the PLL locks reliably. It has now stayed locked for an hour or so.

My takeaway is that going forward it is likely faster to fix anything that breaks on the PLL rather than attempting to swap components entirely.
LASTI General
Richard - posted 10:58, Tuesday 25 February 2025 (11897)
Y end Clean room over heating

  Last month-ish there was a burning smell coming from the Y-end cleanroom, at the time it was unplugged and locked out. Yesterday I was able to access the junction box at the top of the clean room. 

This wiring maybe was inherited from NE-80 (pre-2000), I don’t know. It eventually over heated, again I don’t know why, once (if) it gets resurrected we need to test the motors to see if any are drawing too much current. There were three separate power lines, powering two blower box circuits and one light box circuit. All three circuits switched off of the same on/off switch which sounds like it shouldn’t have worked so I might have that wrong. There is some doubt as to whether what was installed was up to code, again I don’t know.

  the cableing will all be piled ontop of the cleanroom until we deicde that we actaully need to use it

 

GRAVITES General
dorotea - posted 05:00, Tuesday 25 February 2025 (11896)
Optical path length matching with temperature control

Over the past week we've been working on using temperature control to length match the spools. We measured the optical path length difference as a function of temperature difference between the two spools over a full degree, letting the spools thermalize for about 2 hours after every increase of .1K (fig.1) and found a very linear relationship between the temperature difference and optical path length difference between the two spools. I used these measurements to roughly calculate what the temperature difference should be to match the path lengths. We did this this way instead of just walking the spool temperatures because (1) it required less active work once the remote interfaces with all the instruments were cooperating, and (2) because the peaks on the correlation plots have significant width, so we need to do some amount of interpolation to get as close as possible to matched lengths-- the side peaks caused by the mismatch (visible on fig. 2, for example) will not always be visible as they could disappear inside the width of the main peak. After allowing the system to thermalize overnight, the correlation measurement shows a large improvement-- the side peaks appear to have disappeared (fig. 3). Note that the temperatures referenced in the plot titles refer to the temperature of spool 1 when the correlation measurement began.

The temperature of spool 2 (which was kept at the same target temperature during these measurements) doesn't seem to be perfectly stable, but changes a few hundredths of a degree over the course of hours. We could make this length matching more robust by: (1) consistently tracking the temperature difference and adjusting the set temperatures, (2) using regressions or a transfer function (rather than hand calculations) to determine the expected steady state temperatures of the spools themselves with relation to the set temperatures on the controllers, and (3) using regressions (rather than a hand calculation) to determine the ideal temperature difference between spools. I'll probaby implement at least (2) and (3) in the near future as both should be fairly simple with the amount of data I've already collected.

Images attached to this report
Heisenberg IFO BOPO
hudsonl - posted 18:20, Monday 24 February 2025 (11895)
3D printed plastic cover for Breadboard OPO
[Hudson, JD]

JD and I designed an enclosure for the breadboard OPO to isolate it from air currents. The enclosure is a 5 inch tall cylinder with a 5mm wall thickness (a 8.89" outer diameter). It has a 0.5" wide, 2.5" tall cable window, and a pair of 1.5" wide, 1" high windows, offset from the center by 0.5" for the pump, CLF, and squeezed beams.

We believe that this cover offers several advantages over the previous solution, a cut-up Newport lab snacks box covered in UHV foil:
- Improved shielding from air currents, which should improve the device's thermal stability
- Improved mechanical stability: the new cover sits snugly around the breadboard OPO, making it less susceptible to being displaced by a small distance in a manner that blocks one of the beams in or out of the OPO
- Hopefully this will emit fewer particulates than the Newport cardboard box, which had some exposed cardboard despite being mostly covered in UHV foil.
Images attached to this report
General
evanhall - posted 09:15, Friday 21 February 2025 (11894)
TIR cavities from ShalomEO

Specification document: LIGO-E2500028

Metrology filecard: LIGO-S2500179

Heisenberg IFO Data Acquisition
hudsonl - posted 14:29, Thursday 20 February 2025 (11893)
Heisenberg IFO Data Taking Procedure
We outline the data-taking procedure for the Heisenberg interferometer experiment. This post will be updated as the procedure is refined

(1) Align the setup with both squeezers in alignment mode. This is most easily done by running the 90% pickoff of the Lightwave through a 50/50 fiber beam splitter and sending one 50% path to the CLF port of each OPO.
     (a) Ensure that the voltages throughout the setup are set to the proper nominal values. The BOPO's OPO should be locked to a resonance with about 30 V applied to its PZT, the CSQZ's OPO should be locked to a resonance with about 125 V applied to its PZT, the squeeze angle control PZT should have an offset voltage of 75 V, and the MZI PZT should have an offset voltage of 125 V.
     (b) Align the beams out of the two OPOs to each other on the MZI's input 50/50 beam splitter
     (c) Align the MZI
     (d) Align beams to the CSQZ homodyne
     (e) Align beams to the BOPO homodyne
(2) Switch back to squeezing mode on both OPOs
(3) Close the PLL loop
(4) Take dark and shot noise references for each homodyne using the picoscope.
(5) Turn on each squeezer, set the OPO temperature to maximize NLG for a given pump power. Adjust pump power levels so the two squeezers have similar levels of NLG
(6) Close the CLF loop on each squeezer and the relative squeeze angle control loop.
(7) Lock the MZI by closing the MZI loop with the LB1005
(8) Lock the CSQZ homodyne to the CSQZ's CLF tone.
(9) Run an automated script to jointly optimize the values of the CSQZ homodyne demod phase angle and the relative squeeze angle control demod phase angle.
(10) Set the BOPO HD demod phase angle.
(11) Take data (with or without a modulation tone applied to the homodyne)
Heisenberg IFO General
hudsonl - posted 19:38, Wednesday 19 February 2025 (11892)
Heisenberg Interferometer Alignment
The alignment of the Heisenberg interferometer seems to drift on a timescale of a day or two. As a result, we will likely want to re-align the setup fairly frequently while taking data. Fortunately, doing so is relatively straightforward. The attached imaged show the mirrors that should be adjusted to align the beams out of the compact squeezer (CSQZ) and breadboard OPO (BOPO) to each other on the input 50/50 beam splitter of the Mach-Zehnder interferometer (MZI), the interferometer itself, and the beams out of the interferometer to the CSQZ and BOPO homodyne detectors (HDs). In all images, the red lines show the beam paths and the circled mirrors are the ones that should be adjusted for alignment. As far as I can tell, these mirrors are the pairs that are the most out of phase with each other on a given path.
Non-image files attached to this report
GRAVITES General
eoelker - posted 11:10, Monday 17 February 2025 (11890)
Reduction in Losses and Improved temp stabilization [Vienna]

[Tom, Dorotea, Eric]

Last week we made some extensive improvements to the optical and thermal control setups to reduce loss and improve thermal stability.  We hope that this will improve our stability in the 1-50 mHz band and enable us to start making low loss single photon and NOON state measurements with the setup.  We did the following:

Now the total throughput at 1542 nm is above 5% when measured after the output DWDMs.  Previously, we were getting only 2% throughput, so this is a significant improvement.  Next, Dorotea and Tom plan to begin setting things up for more serious single photon and NOON state measurements.  Peter has optimised the type-2 source and we can begin this week.  

Images attached to this report
RetroSense General
sasha - posted 18:47, Thursday 13 February 2025 (11888)
RetroSense v3 Noise
Sasha, Evan

Over the last few months, we have been measuring and working on reducing noise from RetroSense v3 retroreflection sensor. The plot shows the most recent measurement for two variations of the system, which have the same sensor part (with LED and quad-PD placed on the same board), but different PCBs. One includes a demodulation board from v2 and ADA4610-4 op amps on the pre-amp, and the other has no demodulation and ADA4077-4, along with some minor differences in passive components. 

The setup with demodulation has lower noise, especially at lower frequencies. However, it is still higher than noise from v2 (which could reach just below the eBOSEM line at some frequencies). This might be due to environmental factors as well as issues in cabling and connections, so further tests and improvements are needed. The sensor is currently set up on a translation stage inside a metal box, and the signal is read out through a handmade cable, as shown in the second image. 

More measurement details: 
Sensitivity dV/dx = 23 V/mm
Total photocurrent = 263 uA
Sum voltage = 6.7 V
Shot noise = 12 pm/rtHz
Images attached to this report
General
sasha - posted 16:25, Monday 10 February 2025 (11887)
Frequency Noise Measurement from the Interference of Teraxion and Koheras Lasers
Sasha, Evan

Figure: Comparison between measured Teraxion and Koheras laser frequency noise and their expected noise performance from documentation. 

Teraxion (with 20 dB attenuator) and 1550 nm Koheras (offset of 163.6 pm relative to 1550.12 nm) went into a PM 50/50 beam splitter (AFW PFC-15-2-50-FB), focused on NF1811, and fed back to the Teraxion modulation port by mixing the beat note (~38 MHz) with Marconi 2030 output using a ZRPD-1+ phase detector, 5 MHz low-pass filter, LB1005 (gain -23 dB, PI corner of 1 kHz), and a series of attenuators (-34 dB total).

With PLL locked, we measured the spectra of the control and error signals with both a spectrum analyzer and cymac. While analyzing the data, we had to take into account that cymac analog input had a whitening filter. From these measurements, we calculated the frequency noise displayed in the attached figure. 
Images attached to this report
TIR General
evanhall - posted 19:55, Wednesday 05 February 2025 - last comment - 14:42, Wednesday 26 February 2025(11884)
Continued prism coupling experiments with copper leaf

Swadha, Evan

We continued coupling experiments between two prisms with copper leaf and achieved transmission as high as 3%.

We are still not happy with our procedure, but it is as follows (with critique):

  1. Blow the prism surfaces clean with compressed air. Then drag wipe with isopropanol. This removes copper specks large enough to be seen with the eye, but it is unclear to what extent copper remains pressed onto the surface from previous coupling attempts.
  2. The drag wiping seems to remove surface charge from the glass, which is actually disadvantageous because we like the leaf to stick to the glass when placed there. We found that cellophane tape applied to (and then removed from) the surface restored the charge. We might like to find a similar material that does not involve adhesive.
  3. We cut two strips of copper leaf about 5 mm × 25 mm. We use a PTFE-coated razor blade to press into the leaf, which is placed on top of UHV foil. We also tried placing the leaf on nylon to try to preserve the blade a bit longer, but this may charge the copper so we have put it aside for now.
  4. Using tweezers, we transfer each strip to either side of the clear aperture of one of the prism faces. Throughout the entire process with the leaf, the HVAC in the flow bench and clean room is off because air currents are too powerful.
  5. Each prism is on a separate mount. We press the two mounts together so the prism faces contact. This is currently a bit of a messy process and it may be the case that we are causing the leaf to wrinkle, although it looks reasonably flat after pressing.
  6. One of the mounts is kinematic and we can see optical fringes under bright illumination at the interface. Twisting the kinematic screws to increase the interface compression will increase transmission to a point, but continuing to twist eventually decreases coupling for some reason I do not yet understand.
Comments related to this report
evanhall - 14:36, Friday 14 February 2025 (11889)

We improved this procedure through the following:

  • On Sławek's advice, we used an alpha wipe (100% polyester) to charge the outward portions of the prism faces, rather than cellophane tape. This seems to have worked well. We may still need cellophane tape to remove bits of shredded copper between tests.
  • We found that strips of copper were too easily ripped or shredded due to shear at the interface as we were tightening down the contact between the faces and the copper. We switched to using three small (~3 mm diameter) pieces of copper leaf. This gave a better transmissivity result (see below) and also enabled us to keep the blowers on during the whole procedure.

Our procedure to prepare the faces between tests is:

  • Cellophane tape is applied to remove shredded pieces of leaf (we are worried that drag wiping at this stage may scratch the glass).
  • The prism faces are drag wiped with acetone (to dissolve the acrylic of the cellophane adhesive). The acetone is not allowed to dry; the wipe is finished with DI water to avoid precipitation of anything in the acetone.
  • The outward portions of the prism faces are gently brushed with an alpha wipe to charge the faces.
  • The copper leaf is kept under a weighted piece of UHV foil so that it does not blow around. A piece of copper is ripped off from the square leaf with tweezers and then stuck to one of the two prism faces. This is repeated twice to get three bits of copper on one of the faces.

After this procedure, we were able to get coupling in excess of 30% in the p polarization. We mounted the two prism stages on a rotating optical breadboard and took transmission readings as a function of angle of incidence. An MCMC analysis of the data suggests the gap size is 1.5 µm, which is still larger than the 600 nm of the leaf itself (measured with a micrometer). The MCMC determines the index of refraction to be 1.43, which is lower than the 1.445 expected for Corning 7980, but the constraint is not too tight and is also susceptible to any difference in power efficiency of the reflection and transmission photodiodes, which we did not set up too carefully. In contrast, the gap size is determined by the falloff in transmission with angle of incidence, which is well-calibrated.

Non-image files attached to this comment
evanhall - 10:30, Tuesday 18 February 2025 (11891)

There is a question of why, if the copper leaf is supposedly 600 nm as measured by micrometer, the gap size here appears to be about 1.5 µm.

I hypothesized that it might be due to insufficient pressure applied from way the prisms were clamped (each on a platform with a clamping arm, as you might do for a PBS). The clamping arm provides a restoring shear via its nylon-tipped setscrew.

I replaced this clamping geometry with three angle brackets for each prism, with 8-32 tapped through-holes that can accommodate setscrews. I repeated the contacting procedure described above and was not able to significantly raise the transmission higher than the values previously reported (0.3 to 0.4 in power at best). I did not take detailed data as a function of angle, but it seems this altered clamping geometry did not attain an appreciably smaller gap size.

It is also worth remarking that both clamping geometries don't really provide proper kinematic contact; the point of this two-platform geometry was to bring the prisms nearly into contact in some controlled (perhaps interferometric) fashion, rather than relying on actual contact via a spacer material (leaf in this case).

evanhall - 14:42, Wednesday 26 February 2025 (11900)

Swadha, Adam, Evan

We turned the entire coupling setup vertical so that we could let gravity maintain an approximately kinematic contact.

Simplify placing the upper prism on the spots of leaf results in a coupling of a few ppm or less, so presumably many microns of gap size. We suspect the leaf is wrinkled in some way when cut and/or placed, although we have taken some care to avoid obvious folds or scrunches when we place it.

Applying pressure at the interface seems to bring the gap size down to what we saw previously, probably 1–2 µm as inferred from the 30% or so transmission in p. (We have some transmission vs. angle data that we have not analyzed yet.)

This setup has the nice feature that when the flow bench lights are on, they produce obvious fringing at the interface, so it is possible to see the parallelism of the faces down to the level of a few fringes.

Heisenberg IFO General
hudsonl - posted 18:38, Friday 01 November 2024 - last comment - 17:03, Wednesday 26 February 2025(11822)
Adapter Plate between Aerodiode AOMs and Newport EOM Four-Axis Mount
Attached is a sketch of the adapter plates I machined to place a free-space Aerodiode AOM on a four-axis Newport 9071 EOM mount. The plate should be 1/4 inches thick to place the center of the AOM 1.75 inches above the bottom of the mount. The counter-bore for the #8-32 through holes can likely be done with a counter-bore found in the machine shop. The counter-bore for the M2 through holes will likely need to be done with an end mill.

The only dimensions that need to be machined precisely are the relative distances between the four #8-32 holes and the distance between the two M2 holes.
Images attached to this report
Comments related to this report
hudsonl - 17:03, Wednesday 26 February 2025 (11901)
The clearance holes for the screw heads that attach the AOM to the adapter plate should be drilled 0.2" deep instead of 0.13" deep to allow more of the screws' threads to catch. With only 0.13" deep clearance holes, the AOM becomes loose on the mount over time, causing alignment drifts.
Displaying reports 341-360 of 1025.Go to page Start 14 15 16 17 18 19 20 21 22 End