jacques - posted 16:47, Monday 15 July 2024 (11705)
Solution to the 29mHz drifts of the squeezing ellipse: a floating number issue

We had an issue on the previous logbook post, where the demod_freq of the CLF-pump loop needed to be adjusted by 25 mHz from the CLF-LO loop. This is now explained as a rounding error by the Red Pitaya. One can show theoretically that this issue is independent of the frequency of the Moglabs.

The pdf document attached explains the issue and the solution.

I copy paste the solution here: To mitigate this issue in the future, we should ideally choose demodulation frequencies which are integer multiples of 125 MHz/232 = 29.103830456733704 mHz.