Displaying reports 121-140 of 1025.Go to page Start 3 4 5 6 7 8 9 10 11 End
Reports until 17:33, Thursday 14 May 2026
SQZ General
eoelker - posted 17:33, Thursday 14 May 2026 - last comment - 18:55, Saturday 16 May 2026(12183)
NLG Log: Week 3

REMINDER:  When comparing to the values at the sites, recall that this OPO has the O3 mirrors

 

This week

532 Power at Fiber Launch: 29.85 mW

REFL 532 Power (Unlocked): 18.7 mW

REFL 532 Power (Locked): 6.43mW

Trans 532 Signal (Locked): 8.17 (i think this is in uW but seems low, need to check calibration)

532 Mode matching = 0.78

 

Seed Incident:  35 uW

Seed Trans (no gain):  0.163 V

Seed Trans (max parametric gain): 2.57V

NLG:  15.8

Optimal OPO Crystal Temp:  35.029 C

Threshold power (in TEM00 mode) ~26 mW incident
 
Notes:
We're seeing our first evidence that the crystal is slowly degrading.  Higher pump power now required.
Fiber efficiency is a bit lower.  Haven't tried optimising alignment yet.
Comments related to this report
eoelker - 18:55, Saturday 16 May 2026 (12184)

I was looking through some old aLog posts trying to compare the threshold level we've seen so far to the old PPKTP crystals.  Looks like its reasonably comparable to what Maggie had shortly after a crystal move during O3 comissioning:

https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=41060

23 mW threshold.  Which is about where we started before the currently observed aging

 

I'm starting to think that the aging in this test might be a bit hard to compare to what we've seen at the sites.  I'm using the O3 mirrors (which require higher circulating 532 nm power for a given NLG), but I'm using the O4 nonlinear gain level.  Given that I don't plan to upgrade the mirrors on this OPO in the near future, perhaps I should reduce the NLG to the level used for O3 so its a bit easier to compare to our old data.  I'm going to chat with folks at the SQZ meeting next week.  

LASTI General
Bruno - posted 11:45, Wednesday 13 May 2026 (12181)
PVD chamber
Upgraded the power feedthrough electrodes for the PVD thermal evaporation chamber. A Sorenson DC power supply is used at around 18 amps to evaporate uniform layers of Aluminum onto glass PEEK and Macor with a predictable electrical resistance (provided the surface is polished to 8 micro-inch Ra or better). Chromium and gold were successfully evaporated, but there is some trouble with substrate adhesion on non metals. 
Images attached to this report
General
Bruno - posted 11:30, Wednesday 13 May 2026 (12180)
Vacuum Bake Oven 05_06_26 RGA scans
Took RGA on new chamber after 150 C bake for 16 hours. RGA+Oven (no calibrated Argon) UHV angle valve must be closed. Green Neupro valve is insufficient. 

Strong smell during bakeout - Foil tape adhesive on the heater trace? 
Will have to redo the insulation / take off yellow Neoprene Coolskin for high temp bakeouts. 

Prior to bakeout Helium leak checked all cf flanges using the RGA in leak test mode. Absolutely no leaks detected though there was a small upward drift when I bagged up the second flange on the RGA tree. This might be from the electrical feedthrough. 
Images attached to this report
SQZ General
eoelker - posted 08:42, Monday 11 May 2026 (12179)
NLG Log: Week 2.5

REMINDER:  When comparing the the values at the sites, recall that this OPO has the O3 mirrors

 

This week

532 Power at Fiber Launch: 25.25 mW

REFL 532 Power (Unlocked): 17.65 mW

REFL 532 Power (Locked): 6.17mW

Trans 532 Signal (Locked): 8.21 (i think this is in uW but seems low, need to check calibration)

532 Mode matching = 0.78

 

Seed Incident:  35 uW

Seed Trans (no gain):  0.165 V

Seed Trans (max parametric gain): 2.73V

NLG:  16.5

Optimal OPO Crystal Temp:  35.071 C

Threshold power (in TEM00 mode) ~24 mW incident
 
 
SQZ General
eoelker - posted 09:00, Thursday 07 May 2026 (12178)
NLG Log: Week 2

First in a series of posts monitoring the NLG and power levels of the LASTI Squeezer from week-to-week

REMINDER:  When comparing the the values at the sites, recall that this OPO has the O3 mirrors

 

This week

532 Power at Fiber Launch: 25.42 mW

REFL 532 Power (Unlocked): 16.5 mW

REFL 532 Power (Locked): 6.00 mW

Trans 532 Signal (Locked): 8.2 (i think this is in uW but seems low, need to check calibration)

532 Mode matching = 0.78

 

Seed Incident:  35 uW

Seed Trans (no gain):  0.16 V

Seed Trans (max parametric gain): 2.39 V

NLG:  14.9

Optimal OPO Crystal Temp:  35.143 C

Threshold power (in TEM00 Mode) ~ 24 mW

SQZ General
eoelker - posted 17:23, Wednesday 29 April 2026 (12177)
CLF RFPD replaced, LO Servo work-around

Did some electronics work today:

1.  Replaced CLF RFPD:  The old PD was oscillating.  This can sometimes happen with these old iLIGO LSC PDs if you tune the Q filter too aggressively.  I replaced the PD with another board using a 2 mm photodiode.  This one doesn't oscillate, but the dark noise isn't quite as good because the Q is lower.  Right now, with only 50 uW of seed incident on the OPO, we are limited by dark noise rather than shot noise.  Within the CLF loop bandwidth, this gives us about 5 mRad of phase noise.  Turns out, this number actually wasn't too different from the old PD because we didn't have the beam focused down well enough on the old 1 mm photodiode. 

In principle, we could get lower phase noise if we replaced this with a (working) 1 mm photodetector to boost the Q and focused the beam down.  However, I already expect better SNR when we: A) Increase the 1064 finesse by switching to the O4 mirror design and B) lower the CLF frequency to 3.1 MHz.  I'll just wait to reoptimize this when we're fine tuning the squeezer for the coupled cavity expt.

NOTE: I didn't add the 1-omega notch to the feedback path by setting L5 = 10 uH.  Not an issue right now, but will need to be fixed before we do ADF stuff.  I do see issues if I enable the CLF and forget to block the seed beamsplitter.

 

2.  Modification for the LO servo:  The LO Servo had terrible phase margin before.  I tracked it down to an extraneous 2nd order low pass filter on the slow path.  Rather than modifying the board I implemented the following hack:

This gives us the same servo TF as before WITHOUT the extra low pass.  Now I can lock the LO loop with a 30 kHz UGF and 50 deg phase margin.

Settings Summary:

3.  Tested PDE AI Chassis:  I want to add digital ISS loops for the LASTI squeezer.  They're important for keeping the squeezing level stable and we'll need things very stable for the new expt so we can see the degredations coming from internal mode mismatch.  Unfortunately, m1sus is all out of DAC channels and AI chassis.  I am going to move over one of the old PDE DAC cards and set it up on m1sus.  I pulled out one of the old PDE AI chassis to test today.  Channels 1-8 are heavily modified and need some fixing.  Channels 9-16 seem useable, however.  The TFs are a bit different from what is currently in use at the sites, but it should be good enough for my purposes.

SQZ General
eoelker - posted 18:08, Monday 27 April 2026 (12176)
Overnight Test started

I'm leaving things locked overnight to see how it goes with the new guardians.  Eventually, once I finish patching up the laser safety enclosure, I'll leave it on 24/7

 

Right now, I've left it with about an NLG 12 (incident power on the opo is about 15 mW).   This corresponds to threshold being around 24 mW incident in TEM00, assuming 80% mode matching.  I think this is still about the same as what Daniel was measuring in the Fall.  We will want to track the NLG over time and see how robust this is over the months.

 

I believe that the sites are currently operating at a bit higher NLG typically (15-18 iirc). I'll turn it up a bit at some point.

 

SQZ General
eoelker - posted 16:48, Monday 27 April 2026 (12175)
OPO Guardian Working

I got a rudimentary Guardian script working for the OPO.  We should now be ready to begin the long-term testing of the OPO crystals. 

 

I based my guardian script off of the one from LLO.  I ended up trimming theirs down quite a bit as the site scripts seem to have some redundant error and resonance checking (checks that are included as guardian decorators were also hard-coded into the guardian states).  I also switched from using a dither lock for the seed to our PDH lock (still need to test this functionality more).

 

Right now some of the automated features i tried to add(LLO's prescan sweeps and LHO's OPO temp sweep) aren't quite working properly.  We seem to be having some NDS issues with grabbing framebuilder data through python.  Might need some help from the CDS folks to track down that issue.

 

Note:  I swapped the two inputs on the OPO_CMB

In1 = Green PDH lock

In2 = Seed PDH lock

SQZ General
dmdesant - posted 17:42, Friday 24 April 2026 (12174)
LASTI OPO Tune-up Before Guardian Automation

[Eric, Daniel]

Today, we tuned up the co-resonance on the LASTI VOPO. For our measurements of rough NLG, we used the following seed power and pump power:

Baseline Seed Input Power: 60 uW

Pump Power (measured from OPO REFL): 9mW

 

The crystal stage was re-referenced and we found all the spot locations roughly as follows:

Crystal Bottom Edge: -1.9mm on pico stage readout after negative reference (DO NOT POSITIVE REFERENCE!)

Crystal Top Edge: 2.86 mm

Spot Position (mm) Temp (C) Nonlinear Gain
1 -1.215 33.75 2.6
2 -0.773 33.75 2.4
3 -0.331 33.75 2.5
4 0.115 33.75 2.0
5 0.555 33.75 2.9
6 0.997 33.75 2.9
7 1.435 33.75 3.1
8 1.874 33.75 3.0
9 2.319 33.75 3.1
10 2.744 33.75 3

After optimizing around spot #9, the target co-resonance parameters while locked were:

Temp = 35.372 C

Stage Position = 2.488 mm

Pump Power = 9 mW

Nonlinear Gain = ~5

After this, we disabled the stage and unplugged the stage controller from the chamber to prevent additional heating of the oven parts.

Eric also added an RF preamplifier to the CLF-2F beat signal from the CLF PD before the demodulator. This improved the beat-tone amplitude enough to resolve it on the logarithmic power detector built into the demodulator (needed for the guardian to observe co-resonance)

 

 

GRAVITES Electronics
dorot3a - posted 22:19, Tuesday 21 April 2026 (12173)
Status update on GRAVITES electronics

HD 7 and servo 2 arrived in Vienna as of 2026/04/13. Dark noise measurements for HD7 as well as IRN measurements and board transfer functions for servo 2 are attached. Board TFs were taken from the HD input --> output of common board and PZT monitor for the common and split boards respectively.

Last week I spent some time working on both servos 1 and 3 (the new one built by Eric a few weeks ago). Changes:

Both now seem to be working ok, I was able to simultaneously lock two arms to a third common arm on Friday. Still need to check on the transimpedance resistors/op amps on HDs 3, 4 to get rid of excess noise they're showing. 

Images attached to this report
SQZ General
eoelker - posted 17:07, Tuesday 21 April 2026 (12172)
Guardian Working. SHG, PMC Locking automated

Fred finished with installation of the Guardian last week.  After some initial debugging, I managed to get some of the Guardians going again. 

 

I didn't have much luck restoring the old LASTI guardians, so I switched to trying to implement the newer guardians currently in use at the sites.  This afternoon I got SQZ_SHG and SQZ_PMC working.  Both loops acquire lock without issue.

 

I just need to automate the OPO loop then we'll be ready to start the long-term test of the sPPKTP crystal.  Bruno is helping me to patch up the box around the VOPO chamber.  Hopefully we'll be able to set it up so no one needs to wear laser goggles when the enclosures are closed.

General
Bruno - posted 18:52, Friday 17 April 2026 (12171)
Lasti Ham Y vacuum diagrams and operating procedure
HAM Y vacuum system startup procedure. 

Rich and I are putting together the pieces to start up the roughing and turbo system for the Y arm. Attached are some papers we found on the pump controllers. 

Some parts:
2 Thermocouple (Pirani) Gauges - Granville-Phillips
Ion Gauge - Granville-Phillips Stabil-Ion Gauge
Pneumatic Valve 
Pneumatic Valve Controller 
Gauge Controller - Granville Philips, 6 relay, RS232 out
KF40 Angle Valves x5
2 3/4 Conflat Angle Valve
Ts, Crosses, etc
B. Process Control

There are two main things that are controlled in the setup, the scroll pump and the pneumatic valve on the foreline which both protects the turbo and acts as a pseudo gate valve. These are controlled separately, each has a dedicated box. The wiring diagram is shown in figure IID.
There are two switches and a circuit breaker that can trip the scroll pump. The breaker is a 10 A breaker as specified by the manual. One switch is set to a turbo failure, the scroll pump will switch off in the event of a turbo failure. The other relay is on the Gauge Controller box and is energized when the pressure is below 5 10−3 torr. This protects against a major leak in the system.


The foreline valve is connected to a relay in the Gauge Controller set at 5 torr on the foreline pressure. This is to protect the turbo in the event of the scroll pump failure or someone opening the gate valve too fast. Note: If you are just starting the turbo at around 0.05 torr and you open the GV all the way too fast then this valve will trip. Read the Operating Manual.


II. STARTUP AND OPERATION PROCEDURE
The steps are as follows:
1.) Close the vent valve on top of HMY, USE A TORQUE WRENCH, the nominal value is 12 ft-lbs.
2.) Rough the main volume with the QDP 80’s to 5 10−2 torr
3.) Close the rough line, open the foreline valve, spin up the turbo, open GV.
4.) Pump with turbo, backed by the QDP to Psys ≈ 2 10−5 torr and Pfore to about 3 10−2 torr.
5.) Switch to backing with the scroll pump.

A. Roughing the Main Volume

To rough we use both QDP 80’s.
Make sure that the vent valve on the top of HMY is closed. It should be torqued to 12 ft-lbs. If it becomes a problem, torque it a few more ft-lbs.
Make sure that the gate valve is closed. This is 6 1/8 turns from the open position.
Check that the air line from the wall to the QDP 80’s is open, if not open it.

Close all valves on RF side.
Images attached to this report
LASTI General
Bruno - posted 18:46, Friday 17 April 2026 (12170)
Vented Ham Y chamber
Vented Y chamber 4/17. slightly cracked it open till I heard a hiss. 

Digital torque wrench registered 153 In-Lbs (12 Ft-Lbs) on loosening.

A Paper next to the valve had 17 ft-lbs for closing/tightening dated to 2008. This seems high.

Found some notes that mention the torque for closing is indeed 12 ft-lbs.
Images attached to this report
Frosti-Lite General
Evan Hall, Bruno Becher, Nelushi Vithanachchi - posted 19:58, Monday 06 April 2026 (12169)
(High resolution) frosti-lite scans

We did another scan with smaller scan step size (3mm*3mm). This was done with the thermopile 10cm away from the front surface of frosti-lite. The total supplied ohmic power was 49.91W. The power captured by the thermopile was calculated as 33.15W. All the quadrants reached around 100 deg C. (The ZnSe aperture was removed).  

Images attached to this report
LASTI General
arnaud - posted 20:17, Monday 30 March 2026 (12168)
HAMX vent and CRS diagnostics
Rich, Bruno, Arnaud [remote]

CRS1 
Rich added .98g of washers (as per https://dcc.ligo.org/LIGO-T2600096) to the bottom 8-32 screw of CRS1 to get the COM below the flexure point (to address the issue described here: https://alog.ligo-la.caltech.edu/SEI/index.php?callRep=2564). We measured a new resonant frequency of 22.8mHz.

CRS2
The adjustment mass was stuck on one side of the mount. It was recentered with the proof mass on its lock. Rich mentioned the it was slipping otherwise. Bruno checked the TEC controller, and the 'open' red led was on, we will need to investigate.
 
For both CRS, the light levels on the pds went down on March 1, and had not recovered since then (-400cts instead of a few thousands). Since the preamp is shared between the two, Bruno power cycled it (D2300154-v4), and the signals came back. 

Balancing will continue tomorrow. 
Frosti-Lite General
Evan Hall, Bruno Becher, Nelushi Vithanachchi - posted 16:16, Sunday 29 March 2026 (12167)
FROSTI-lite scan results at different distances
We did a series of scans at different distances of the thermophile from frosti.

Test 1- March 12th 
With the  ZnSe lens 
Power supply 
Hylec (Drever and weiss)
20V ,1.448 A and 28.9W
Agilent (Barish and Thorne)
19.98V, 1.463 A
Drever and Weiss get warmer than Barish and Thorne. Though there is no apparent asymmetry in the thermophile scans.
Total Ohmic power= 20*1.448+19.98*1.463= 58.19W
The total power captured by the thermophile is calculated as follows.
P(mW)= The power recorded by the thermophile
A=10*10 mm^2 (Area of thermophile)
The scan step size= 6mm
The total power =sum( P*10^(-3)/(A*d*d))

Test 2- March 13th
Without the ZnSe lens
The scans look asymmetric (The thermophile was likely angled- Will retake the data)
In order to reduce the disparity among top and bottom half, the power supplies were set to different values
Power supply 
Hylec (Drever and weiss)
17.00 V ,1.232 A
Agilent (Barish and Thorne)
19.98V, 1.465A
Total Ohmic power= 50.2147 W

The results are attached. 
Images attached to this report
Frosti-Lite General
Evan Hall, Bruno Becher, Nelushi Vithanachchi - posted 16:08, Sunday 29 March 2026 (12166)
General updates on frosti-lite
A new design for the FROSTI segments were made by bruno.
Here we have a TaN coating on a macor piece where current is run through
We asked for the resistivity coating variation to be less than 2%. The company doing this coating informed us that for this tolerance the surface roughness needs to be less than 2 micro inch. Bruno is currently looking into how much surface roughness we can get by polishing in lab

We are designing a new constant current power supply. We aim for about 0.8A through each segment. 
We attempted to make power supplies using LM 317’s. But failed few times.
Then we tried to use the power supply thomas sent. I put too much current through that and one quarter burnt out.
So tentatively, we are using bench top power supplies at 20V

Evan proposed the idea to use pcb tiles with copper traces in a meandering pattern for the heating element.
The code for the scanner gui kept crashing. This was debugged using CHAT-GPT.
Frosti-Lite General
Evan Hall, Bruno Becher, Nelushi Vithanachchi - posted 16:05, Sunday 29 March 2026 (12165)
In air and in vaccum results for a single segment
The results of the in air and in vaccum results are attached.
The segment drever was mounted on to a bread board and inserted in a vaccum chamber. The segment was powered using a DC power supply. Images are attached.
Images attached to this report
CDS General
eoelker - posted 17:43, Friday 27 March 2026 (12163)
Instructions on how to get EPICS channels onto the framebuilder

This week Erik von Reis from Hanford helped set up an Electronic data capture (EDC) service on our CDS network which allows us to log our slow controls EPICS channels on the Framebuilder.  This will help us log the EPICS channels from the Guardian, our TwinCAT Beckoff slow controls system, and our EPICS iocs which control our signal generators, labjacks and picomotors.

Once these channels are on the framebuilder, one can use all the standard LIGO tools to analyze and trend back the channel values.  All one needs to do is provide the EDC service with a list of EPICS channels to monitor.  Here are some instructions on how to use it:

  1. All the EPICS channels which are logged on the framebuilder need to be listed in one of the .ini files in:   /opt/rtcds/mit/m1/chans/daq/   This folder mostly consists of the autogenerated .ini files for the various frontend models running on LASTI CDS.   To log new channels, add a new .ini file with the desired EPICS channels
  2. The EDC looks at the channels corresponding to the .ini files listed in the following file:  /opt/rtcds/mit/m1/chans/daq/edcumaster.txt.   Add the new .ini file name to this text file.
  3. Now we have to restart the EDC:  ssh to m1hamx and run 'sudo restart rts-edc_m1edc'.  This will auto load the new channels.
  4. Then restart the DAQ process on the framebuilder, just as you need to do when adding any sort of channel.  SSH to m1fb0 and run 'sudo systemctl restart rts-daqd'

 

Now things should be working.  To test, open ndscope and see if you can find the channels you added in the list of channels.

 