The Mog Labs quad RF synthesizer is now hooked up to the lab desktop. Instructions for connecting the RF synthesizer to a new computer are here: https://www.moglabs.com/support/software/connection the manual for the device is here: https://www.moglabs.com/products/rf-electronics/quad-rf-synth/MOGLabs_QRF_manual.pdf and firmware updates are here: https://www.moglabs.com/support/software/rf
# Instructions for setting up a CDS user model on NW22 CyMAC [RCG/RTS version 5.1.4]
Steps used to create the x5iscagi model used for the testbedAI experiment. The same procedure can be followed for any new user model.
# Make sure the right version of OS is running. Else, restart the CyMAC & Select Debian GNU/Linux as OS from the GRUB [the first option]. The ADC/DAC chassis must be turned on before the restart.
#Open MATLAB R2020b
# Go to CDS Simulink Model Folder
cd /opt/rtcds/userapps/cds_user_apps/trunk/sqz/m1/x5-cymac/models
# Create a model (duplicate an existing model like x5iscqpd)
# Model name must start with the IFO name (x5) followed by three letter subsystem name (ex: isc), then the rest as per the user. File extension: .mdl. For example: x5iscagi.mdl
# Make sure to edit the cdsParameters file and add a new unique integer for dcuid & specific_cpu. Also set the model rate. In case, you don't high sampling rates, it is better to reduce the model rate. For example:
ifo=X5
rate=2K
dcuid=113
host=cymac
specific_cpu=6
# add the channels that you want to save to frame files should be specified within the # DQ Channels block. In case, you don't need the channel to be sampled at a high rate, it is recommended to reduce the DQ channel sampling rate. It can be different for different channels. For example:
#DAQ Channels
STATE_OBS1_IN1 512
STATE_OBS2_IN1 512
STATE_OBS3_IN1 512
STATE_OBS4_IN1 512
ACTION_ACT1_IN1 512
ACTION_ACT2_IN1 512
# here STATE & ACTIO are top level blocks. OBS1, ACT1 etc are cdsFilter blocks. IN1 specifies the filter block input. 512 is the sampling rate for the specific channel.
# GoTo GDS PARAM Folder & add the new model to testpoint.par file
# Make sure Each Model has only 1 DCUID assigned
cd /opt/rtcds/tst/x5/target/gds/param/
# For example:
[X-node-113]
hostname=cymac
system=x5iscagi
#Usage: INFO about /usr/bin/local_dc [options]
The local_dc process concentrates or combines the shared memory buffers from LIGO FE models into one buffer formated for injestion into the daqd or transmission over the network.The local_dc needs to get some information from the model .par files.
# then build & install models
rtcds build x5iscqpd
rtcds install x5iscqpd
# Sometimes removing older versions of the model from the Cache location helps in the build & install process
/var/cache/advligorts/rcg-5.1.4/models/
# then sudo edit the master file in /etc/advligorts/master and add the path to the generated parameter files MODELNAME.ini and tpchn_MODELNAME.par. These files are auto-generated from the rtcds-build command and the files located in the respective target MODEL build folder, for example
sudo vim /etc/advligorts/master
# add the filepaths to the file, ex:
/opt/rtcds/tst/x5/target/x5iscagi/param/X5ISCAGI.ini
/opt/rtcds/tst/x5/target/x5iscagi/param/tpchn_x5iscagi.par
# try to stop all the user models, then stop the frontend IOP model. If you forgot to stop a user model before stopping the frontend IOP model, sometimes the code will be unresponsive to the rtcds stop command. One way to fix is to reboot the machine ($ sudo reboot). There could be other/better ways.
# After stopping all the models, one should build & install the user models, then build & install the frontend iop model. Then start the front end model and then the usermodels. User model rebuilt is only necesasry of you modifed the simulink model.
# For example one can check/run the updated ~/rebuild_install_start_models.sh.
# stop user models
rtcds stop x5iscagi &&
rtcds stop x5iscqpd &&
# stop frontend IOP model
rtcds stop x5iopmhz &&
# build & install frontend IOP model
rtcds build x5iopmhz &&
rtcds install x5iopmhz &&
# build and install user models
rtcds build x5iscqpd &&
rtcds install x5iscqpd &&
rtcds build x5iscagi &&
rtcds install x5iscagi &&
# start the frontend model
rtcds start x5iopmhz &&
# start th user models
rtcds start x5iscqpd
rtcds start x5iscagi
# Check User-model GDS-TP MEDM screens for any red lights
cd /opt/rtcds/tst/x5/medm/x5iscagi
medm -x X5ISCAGI_GDS_TP.adl &
# if you see DAQ & FE as red, then it is resolved by restarting the data concentrator. If you see DK as red, it *could be* related to some of the modesl that use DAC not currently active/started. This should not be a major issue atleast for the above topic. Or you could start those models or modify them.
# Now you should add the new model name to the local_ data concentrator argument in the /etc/advligorts/systemd_env file. This file is readonly, hence use sudo vim.
# For example:
sudo vim etc/advligorts/systemd_env
# modify
local_dc_args="-d /opt/rtcds/tst/x5/target/gds/param/ -m 100 -b local_dc -s 'x5iopmhz x5iscqpd x5iscagi' -w 0"
# Restart Advanced LIGO RTS local data concentrator
sudo systemctl restart rts-local_dc
# check status
sudo systemctl status rts-local_dc
# Restart Advanced LIGO RTS data acquisition daemon
sudo systemctl restart rts-daqd
# check status
sudo systemctl status rts-daqd
# Restart Advanced LIGO RTS Network Data Service
sudo systemctl restart rts-nds
# check status
sudo systemctl status rts-nds
# Check front end GDS IOP status [check for red flags]
cd /opt/rtcds/tst/x5/medm/x5iopmhz
medm -x X5IOPMHZ_GDS_TP.adl &
# open NDSCOPE & fetch/plot data
ndscope &
# the model dcuid must be listed under Tree->X5->FEC
# select and plot the required channels. It can also be done from command line or from a saved yaml file. Ex, from commandline
ndscope X5:ISC-STATE_OBS1_IN1_DQ &
# sometimes when I direclty close the ndscope, it crashes the frontend model. Not sure why (?), to fix it, stop & restart the front end & the user models (no need to rebuild). Check ~/restart_models.sh. I think, if you first click stop online and then close the scope then things should be alright.
The RF power output of the RF Photodetector for the PLL to lock the CLF phase to the OPO cavity length is about -75 dBm on a spectrum analyzer. This agrees with the expected power levels given the OPO mirror reflectivities, the measured nonlinear gain (NLG) of about 10, the incident CLF power, and the RFPD's transimpedance gain for RF signals. The expected behavior is given in the attached plot. The RFPD's output will be fed to a 14-bit Red Pitaya with 120 uV voltage resolution, so the RF signal should be amplified to at least the few mV level, about -40 dBm. In the short term, I plan to do this with a pair of low noise Mini-Circuits RF amplifiers (ZFL-1000LN+) and if this works, I'll modify the custom RFPD design to include another 40dB or so of amplification on the RF path.
Myron plumbed the ADBC table to a nitrogen tank rather than the building air supply. This is a size 300 cylinder. Valve open at 10 am. The tank pressure started around 2500 psi. Now at 5 pm it is still a little above 2400 psi. The table work today was minimal. The regulator on the tank reads 45 psi. The gauges on the table legs read more like 15–25 psi. These are S-2000 series Newport legs.
At 5 pm May 25, the tank pressure was just over 2300 psi. The regulator pressure was 44 psi and the table legs were again at 15–20 psi. The table floats but I suspect not as much as it ultimately should — it seems a bit more sluggish than when we were drawing from the building air at 60 psi. The table is Newport RS-4000-48-12, weight 1110 pounds. The two vacuum tanks, pipe, and inner optical platforms all told are probably north of 700 lbs. The S-2000 manual gives the recommended leg pressure as (Load / (4 × 25.9 sq. in.)) + 10 psi, which for us comes out to 22 psi at least. It means we may want to repeat this cylinder test with a higher leg pressure. That may require a tank regulator with higher range.
At 6 am May 30, the tank pressure is about 1990 psi and the regulator pressure is 44 psi. The average tank depletion rate is therefore about 110 psi per day.
On June 18, the regulator pressure is 44 psi and the tank pressure is about 1020 psi.
We have been using super-polished lenses from Photon Laseroptik for all squeezing applications and aLIGO ISC for the last 10 years.
However, the vendor is not in buisness anymore, and we need to figure out if we need to find another affordable vendor.
Antonios and his team have measured scatter loss of three different types of lenses in the past:
Results from these measurements are here: https://dcc.ligo.org/LIGO-T2300075, with money plot attached. Surprisingly, the Laseroptik lens was the best one.
However, it turned out that the Photon Laseropptik lens was later discovered to come from a very bad batch (https://dcc.ligo.org/LIGO-E2000077) which had contamination issues.
I am now sending to Antonios three other types of lenses:
to perform the same BRDF measurement done as before.
The final goal is to establish if we need to find another vendor for super-polished lenses, or if high quality non super-polished lenses are acceptable.
Chris, Eleonora, Lisa
Today we moved the CyMAC that was used in the LASTI filter cavity to NW22, to be used as data acquisition system for Nikhil's experiment (called testbedAI for now), and the fiber interferometer while it is in NW22. We moved (smoothly, very very smoothly) the whole cart with the CyMAC and its computer from NW17 to the control room of NW22 (to be moved near Nikhil/Eleonora's table).
This is a modified version of the CyMAC with added fast ADCs, old MIT ilog.
RCG was upgraded to 5.14 (probably by Chris and Eleonora) on May 12.
Spent the last couple weeks looking at noise in the X difference output of the QPD circuit. QPD sensitivity around the center (around V_x = 0): OD-110L: 5 V/mm at V_sum = 7.9 V OP232: 2.6 V/mm at V_sum = 3.9 V (assuming proportional relationship, 5.3 V/mm at V_sum = 7.9 V) (Note: after switching out OD-110L with OP232, switched back and re-measured sensitivity, came out smaller than expected, around 4.6 V/mm and V_sum doesn’t appear to peak at V_x = 0 anymore, assuming alignment issues) Spectral density at 50 kHz was the same for both LEDs, observed that the spectral density goes like the square root of the input V as expected: | V_sum at V_x = 0 in V | Spectral Density in V_rms / rt-Hz | | ---------------------- | --------------------------------- | | 7.9 | 211 | | 6.1 | 180 | | 4.1 | 117 | | 0 | 47 | Follows that the noise is approx. the same with either LED: ~ 40 pm/rt-Hz An improvement on the BOSEM noise: ~ 100 pm/rt-Hz
I finished connectorizing the fibers for the compact squeezer to allow us to install an active polarization controller on the CLF path. The connectorization was fairly successful with losses of about 0.7dB on the connector from the fiber box and 2.5dB on the connector to the free-space coupler, with total connector losses of about 3.2dB (0.92mW --> 0.45mW). The second connector is fairly lossy, but the remaining fiber is too short to connectorize this again for now. In the future, if CLF power is a big problem, we may want to consider replacing the fiber to free-space coupler with another thorlabs coupler with similar colimation specifications.
Nick, Slawek, Nikhil, Lisa
We have been testing a number of laser heads today in the NW22 lab.
Lightwave M126-1064-700, SN 422 -- only 190 mW with full current, up to 120 mW with nominal setting
⇒ These two laser heads are going to be sent back to be refurbished
Unrelated to the flooding, we also tested two laser heads which have been sitting in the NW22 control room for a while.
For interlocking Lightwave/JDSU/Lumentum laser controllers, suitable connectors and contacts are as follows:
Today we tried to use the power meter that has been in green lab during the flooding, on Slawek's bench. It turned out to be damaged since it cannot read the sensor anymore, see attached pic.
Today, with Xinghui and Dorotea, we connected the RIO fiber laser on the bench on NW22. We connected the temperature and current stabilization drivers to the laser, using the movable rack in fig. 1. Everything is working properly. We need to be careful to set an output power lower than 10mW. We engaged the temperature stabilization with the settings shown in fig. 2. NB. the internal interlock light on the laser is working only if the temperature stabilization is activated BUT IT IS EMITTING EVEN IF THE LIGHT IS OFF (see fig. 3). Since this laser is not connected to the lab interlock, WE MUST TURN OFF THE LASER WHEN WE LEAVE THE LAB.
Here's some documentation on how to connectorize fibers. This is useful if a spliced fiber needs to be cut and connectorized to integrate another, connectorized, optical element, or for making custom optical fibers. Hopefully this saves the next person some time. Steps to connectorize a fiber: (1) Consult chapters 1-3 of this document: https://www.thorlabs.com/drawings/34227e39adbd50e8-DAE5152D-A8CA-DD97-E8F94A6A89A50F07/FN96A-Manual.pdf which explains how to connectorize fibers. This manual is specific to connectorizing fibers with furcation tubing, but gives a good idea as to how the process goes. The rest of these steps will assume we're connectorizing a fiber without furcation tubing. (2) Take the fiber to be connectorized and place a strain relief boot on each end (3) Use a fiber striping tool to remove the jacket from the fiber and reveal the bare fiber. These tools can be found here: https://www.thorlabs.com/newgrouppage9.cfm?objectgroup_id=1388 It's important to use the right size. Remove the jacket in 10mm increments until there is 30-50mm of bare fiber. If this process is difficult, double check that the striping tool is the correct size for the fiber being connectorized. (4) Insert the bare fiber through a fiber connector. The bare fiber should protrude at few centimeters from the connector. (5) Before mixing any eopxy, prepare the syringe, fiber and connector, and table for the epoxy. The epoxy dries very fast, so it is essential top have everything ready to go before applying the epoxy. (6) Mix the epoxy and apply a small amount of epoxy to each end of the bare fiber being connectorized (at this point the bare fiber has already been inserted into the connector in step 4). Carefully run the bare fiber back and forth through the connector so the fiber inside the connector has epoxy on it. (7) Press the bare fiber as far as it will go into the connector so the maximal amount of bare fiber is protruding from the connector. (8) Press the strain relief boot onto the connector and apply a small amount of epoxy to the base of the boot to secure it. (9) Wait for the epoxy to set. (10) Score the fiber using a thorlabs fiber scoring tool. The fiber should be scored just above the epoxy bead on the outside of the fiber connector. (11) Pull (tension) the fiber from the unjacketed end and the jacketed end. The fiber should break at the location it was scored. Steps to polish a connectorized fiber using the Ultra Tec Minipol 1 (1) Consult the operating manual found here: https://manualzz.com/doc/9946585/ut-minipol-1-operator-manual (2) The manual assumes the epoxy protruding from the connector has been sanded down. If there is a large amount of epoxy, it can be sanded down using the coarsest available Ultra Tec fiber polishing sand paper. It is not desirable to sand down a lot of epoxy as it will prevent the sand paper from being reused and is time consuming, but this does allow the fiber connector to be saved. (3) Once the epoxy bead is sanded down, follow the instructions in the Minipol manual. Results: Using the procedure outlined above, I connectorized a fiber and measured the loss between this fiber and a pair of patch cables connectorized by ThorLabs. The setup was: ThorLabs patch cable --> my home made fiber --> ThorLabs patch cable. I measured the power after the first ThorLabs cable, after my fiber, and after the second ThorLabs cable. All measurements gave 2.45V on a photodiode (I checked that the photodiode was not saturated by increasing its gain, resulting in an output of 7.5V). The connectorization seems to have been successful with negligible loss.
One more fine point that Fabrice taught me, related to Hudson's step 10: if you score the fiber too far away from the epoxy bead on the ferrule, you will end up with an excess of fiber that will probably break off when you attempt to polish it, rather than being smoothly sanded away. When that happens, the core and cladding shatter and the connector is ruined. Once you think you're done making your connector, you should inspect it for defects with a fiber microscope (we have at least one somewhere, possibly two).
I moved the optics of the 1064 nm - prototype fiber ifo from green lab to the optical table in NW22 previously used by Evan and Slawek (see Fig. 1). The ifo is inside the metallic box. The electronics used for the control of the ifo are still on the bench in green lab.
Maya has been testing a new suspension motion sensing scheme in which a retroreflector is to be mounted on a suspension mass, while an LED and QPD are to be mounted next to each other on the suspension cage, so that transverse suspension motion is then translated into beam spot motion on the QPD. The retroreflector we are testing is a 0.5″ corner cube reflector from Edmund Optics (41624). For LEDs, so far we have been using OD-110L, an 850 nm LED with a claimed FWHM beam angle of 7° and a maximum forward current of 500 mA. We also have some OP232, which is what is used in the current BOSEMs. The current rating is lower and the FWHM angle is larger, but they are also a smaller diameter and so may have a smaller spot size at close distances. In any case we may need to stop down the LED with an aperture to get a smaller beam size on the QPD. The LED is driven with a MOSFET circuit (schematic attached) that should enable fast on/off switching so that we can turn this into a chopped measurement, perhaps at tens of kilohertz. The idea of this circuit is that it can be driven with a TTL waveform (0–5 V) while the supply to the LED can be a standard LIGO distribution voltage, here assumed to be +15 V. The resistor R3 sets the current delivered from the supply to the LED (right now the stuffed value is a bit higher... more like 650 Ω). For quadrant photodiodes, we are using OSI QD50-0, which has a diameter of about 7 mm. Instead of OSI's readout board, we are using Eric Oelker's QPD circuit (LIGO–D2000388).
This two-mosfet circuit suffers from the problem that the FET capacitances, about 200 pF, work with the pull-up resistor R2 (shown as 10 kΩ, but actually stuffed as 20 kΩ) to set a time constant on the switching. This circuit could not be cycled significantly faster than 1 kHz. Maya stuffed R2 with a 1.8 kΩ resistor instead, which enabled us to cycle the circuit at 20 kHz, although the effect of the finite discharge time is still obvious and leads to an altered duty cycle for the LED current compared to the TTL drive. It also leads to a noticeable effect in the QPD's X channel readout (before demodulation), seen as a kink in the signal when the TTL drive goes low while the photocurrent persists due to the discharge. Maya is wiring up a single n-channel mosfet circuit (still with IRLZ14) that places the LED and the current-setting resistor R3 between the drain and the positive supply rail.
Today I replaced the 3 fibers with a new one ordered on thorlabs (SM980-5.8-125-CUSTOM) 15 meters long. I measured power losses before and after. The power on the powermeter was fluctuating, so I considered the highest detected power. BEFORE the replacement: Power on the bench before the first fiber (after the polarization tuning) : 38 mW Power after the 1st fiber : around 38 mW Power at the entrance of the ifo : 28 mW AFTER the replacement I decided to connect the fiber before the polarization tuning Power on the bench before coupling in the new fiber : 50 mW Power at the end of the fiber, before the ifo : 45 mW I left two x 1 meter fibers next to PDs, in order to replace the PM fibers with SM fibers. On the bench in green lab there is also a 10 meters fiber without jacket to replace the arm of the ifo. Next steps: replace the fibers and place the ifo on two small stages at different heights to start thinking about the vertical switches and isolation stages.
Asking to get the tag changed to GRAVITES