LASTI General
Me - posted 12:00, Tuesday 18 August 2026 (12227)
Updated HAMX-ISI CPS Dewhitening Filters

 ​ I've installed a new set of filters in the HAMX-ISI CPSINF banks  to invert the de-whitening filters (CAL3 in button #3). This filters are based on measurements of the de-whitening chassis. The attached .mat has the fits. More info at SEI #2590

Non-image files attached to this report
LASTI General
mrtodd - posted 17:43, Monday 17 August 2026 (12224)
Installing output coupler in test cavity

M. Richardson, M. Todd

We installed the output coupler of the HAM Mid-Y and HAM-Y test cavity we are setting up. After having Mitchell crawl down the beam tube to look at the bounces, we were able to get the output coupler well enough aligned that I believe we were seeing flashes. The first observation that supports this was blocking the beam going to the output coupler and comparing the power at REFL to the unblocked state. There was a clear (~10mW) difference in this power: additionally the increased variance in the power in the unblocked state seemed to suggest that the cavity may have been flashing. Using the ThorLabs power meter is a crude setup but we will follow-up with a proper photodiode in place. The optic case that was housing the output coupler is currently holding the (seemingly) broadband mirror that we replaced.

I did not take a picture but we also put a lens in the REFL beam to blow it up a bit, and we could visibly see flashes on the beam card.

Once we have the second steering mirror mount cleaned we can try to get the transmitted beam down the output periscope and onto a PD and camera.

Images attached to this report
CoupledCavity Computers
eoelker - posted 17:25, Friday 14 August 2026 (12222)
Camera server and workstations for Coupled Cavity Expt

I've been setting up some new CDS computers for the new coupled cavity expt:

 

quadrature:  192.168.0.21

This will be our primary slow controls computer for the coupled cavity experiment.  its a newish dell desktop.  Currently, it is sitting in the control room, but I will eventually move it to the coupled cavity CDS rack in the highbay.  This computer will host the following:

 

 

qnd:  192.168.0.22      variational: 192.168.0.23

Two CDS workstations.  These machines have all the normal CDS software installed and will be used to control the experiment.  One will live in the highbay near the PSL, the other will be an additional workstation for the control room. 

Details of the setup is here:  https://git.ligo.org/kevin.kuns/mit-coupled-cavity/-/wikis/wikis/CDSWorkstation

 

Instructions for the Camera server:

 

LASTI General
mrtodd - posted 17:17, Friday 14 August 2026 (12221)
MID-Y HAM and Y HAM optic shuffle
Mitchell R, Matthew T, Eric O

We spent the morning realigning the input beam going into the MID-Y HAM to recover the REFL alignment that was previously achieved. This was because somehow one of the mirrors was moved without anyone's knowledge. At 300mW input power we were able to get around 90mW at REFL. The input coupler is quoted for 90% reflectivity at 45deg, which could explain the lower power at REFL, given the input coupler is at normal incidence.

The afternoon was spent fetching optics and mounts from the MID-Y HAM to have for the output coupler and output steering optics. The plan is to put the high reflector into one of the mounts and use that for the output coupler, and try to see if we can align the cavity axis to see some flashes.
LASTI General
eoelker - posted 17:06, Friday 14 August 2026 (12220)
Viewport shuffle

[Bruno, Eric]

We needed a decent viewport for HAM-Y to use at the transmission port for the coupled cavity expt.  I decided to move an AR coated 10" viewport from the BSC to HAM-Y.  Rich asked me to replace it with an uncoated viewport since he likes having a viewport there for tours.


We swapped the following three flanges.

 

On the BSC next to beam tube:

Removed 10" AR coated viewport.  Installed 10" uncoated viewport.

 

On HAM Mid-Y front door

Removed 10" uncoated viewport.  Installed 10" blank flange

 

On HAM Y front door:

Removed 10" blank flange.  Installed 10" AR coated viewport.

LASTI General
JD Heyns - posted 15:25, Friday 14 August 2026 - last comment - 10:02, Tuesday 18 August 2026(12219)
HAMX Optical Table Layout

HAMX Optical Table Layout as of 08-14-2026

Images attached to this report
Comments related to this report
Richard Mittleman - 10:02, Tuesday 18 August 2026 (12226)

The table is fairly full at this point, any area not labeled probably has trim mass or cable/fiber connections

Images attached to this comment
LASTI General
eoelker - posted 17:25, Thursday 13 August 2026 (12218)
HAM Y Open

[Rich, Bruno, Mitchell, Eric]

 

We opened the small door on HAM-Y today.  The door initially wouldn't come off.  Took us a while to figure out that the annulus was still under vacuum.  No idea why given that no one has used that chamber in decades. 

 

When we looked inside, Rich was surprised to discover that this chamber actually does have a stack afterall!  Unlike the Mid-Y HAM, whihc has an old copper spring stack, this chamber has the later Viton cork build.  Its quite a bit more stiff than the other style of stack, We should still be able to clamber up on top of the table without issue, I believe.

 

Now the question is, what do we do with the Mid-Y stack?  when we thought that HAM-Y had no stack, we were planning on shorting out the Mid-Y stack to fix both tables.  Now the optimal configuration is less obvious.  Do we short out both stacks?  Do we upgrade the Mid-Y to corks?  Do we try to work with two mismatched stacks?  Much to consider.

 

Images attached to this report
LASTI General
richard - posted 22:20, Tuesday 04 August 2026 (12216)
COBRI 1550 Laser running in HAMX

Right now, the laser supplying the COBRI sensor used in the SensIT experiment, is running next to HAMX. Here is some information about its power output.

 

The nominal laser power is 51 mW. In its current use, it is connected to an optical attenuator, which reduces the optical power. The laser is attenuated to 9.7 mW, measured inside the chamber after the octopus.

Inside the chamber, it is connected to a 1x4 fiber splitter each of the ends is connected to one COBRI. The only free-space part of the laser setup is the sensor output going to the target mirror. The free-space laser power coming from a COBRI is 1 mW.
If, for some unknown reason, the attenuation breaks down, then the free-space output of each COBRI would increase to approximately 3.5 mW.

 

To shut down the laser, just pull the plug marked with kapton tape next to the electronics rack. It can also be seen in the attached image. If you shut down the laser, please notify Jan-Niklas about it.

 

This post was written by Jan-Niklas from the University of Hamburg. If you have any questions, just send me an email: jan-niklas.feldhusen@uni-hamburg.de.

Images attached to this report
LASTI General
Bruno - posted 17:28, Monday 03 August 2026 - last comment - 00:16, Tuesday 18 August 2026(12215)
LPS power
LPS optical power output is getting divided unevenly by the fiber splitter. 

As measured at the Fiber splitter end connectors Aug 3 2026-

LPS 1: 402 µW

LPS 2: 278.5 µW

LPS 3: 1045 µW

Images attached to this report
Comments related to this report
dennis.martynov - 00:31, Friday 07 August 2026 (12217)

Thank you, Bruno. Could you please add power levels at other 5 ports of the 1x8 beam splitter?

Also, the second figure seems to show tight fibre loops (radius of a few cm) of the fibre beam splitter which is attached to the ISI via tape. The loop diameter should be, ideally, larger than 20 cm to reduce the fibre stress. Also, tapes are not ideal because they lead to crackling noise. It would be best to avoid utilising tapes with fibres.

Bruno - 13:53, Monday 17 August 2026 (12223)
Attached is a a diagram of the power distribution to the 3 LPS sensors. 

The incoming power is measured at 2.1mW which leads to a stainless steel 1 ->2 splitter (2.1mW -> 1mW+1mW.) One leg of this splitter goes to LPS #3 while the second leg goes into a second splitter ( 1mW -> 292µW + 400µW). These go into LPS #1 and#2. 

It is possible the tight radii of the fiber spools are causing this uneven splitting from the second splitter, but Vermeer and I unraveled some of these and saw no difference in the output power. 

Seems more likely to be a problem with the glass splitter. 

The spools are lightly held by UHV foil, not tape. Surely this fiber management can and should be done differently. We will work on this. 
Images attached to this comment
dennis.martynov - 00:16, Tuesday 18 August 2026 (12225)

Very nice, thank you, Bruno. As Yulin mentioned in the email, we do not require the 1x2 splitter. Instead, all LPS should be connected to the output of the 1x8 splitter. The input of the 1x8 splitter should be connected to the feedthrough:

feedthrough -> 1x8 -> LPS 1,2,3

Regarding the fibre loops, yes, they do not signifincantly change the output power. The loops cause a separate problem with back reflections and crackling noise. We would like to avoid loops with a diameter less than 20 cm.

GRAVITES General
dorot3a - posted 09:30, Wednesday 29 July 2026 - last comment - 12:08, Friday 31 July 2026(12213)
GRAVITES 2fl setup loss tabulations

I re-measured loss on indidivual components in the 2fl interferometer on Monday. We're seeing a lot of extra loss right now within the isolation box in the red lab-- hopefully this is just due to a kink in the fiber or a loose connector and not a break inside the insulation. When I respliced this spool in May the loss was measured around 5dB (6dB including the up and down link). Losses measured in dB. We still haven't spliced the majority of components so a lot of this will be connector loss. If we can deal with the large amounts of extra loss from the spool and delay line in the upstairs loop we're on track to have around half the loss compared to the 40km setup.

  common 1 2
Spool 5 4.4 12.6
PZT -- 0.5 0.2
AOM (at 24dBm drive) 2.6 3.2 2.6
Delay line -- 1.6 6
Total from bs1 out to bs2 in 7.6 9.7 21

 

Comments related to this report
dorot3a - 12:08, Friday 31 July 2026 (12214)

We found a kink in the fiber lead from spool 2 at the feedthrough from the second isolation box which was the cause of the excess loss. The loss of spool 2 incliding the up- and downlink fibers is now down to 6.3dB, for a total loss of 14.7dB on arm 2. Also got mostly length matched across all 3 arms (to within 80cm) today-- the patch cables we added for length are currently at -1.2dB (arm 1) and -1dB (common). We should be able to get the loss lower, but the splicer here seems to really struggle with ULL fiber.

CDS General
Rich - posted 16:08, Wednesday 22 July 2026 - last comment - 14:40, Tuesday 06 October 2026(12211)
random linux/cds bits that i tend to forget

 

from the window:

Simulink files /opt/rtcds/userapps/trunck/SYSTEM/m1/models  where SYSTEM can be isi, sus ............

Overview medm screens  /opt/rtcds/userapps/trunk/SYTEM/m1/medm

Other medm screens /opt/rtcds/mit/m1/medm

CDS Parameters : /home/controls/shared/src/advligorts/src/epics/simLink/lib

 CDS Parts  /home/Controls/lib

 

To run a newly build model:

rtcds build

rtcds install

ssh m1boot

on m1boot: add model name to /diskless/root/etc/rtsystab

back on the other machine: rtcds start

sudo systemctl restart rts-local_dc

Then restart the framebuilder: ssh m1fb0

sudo reboot

 

To get the model into the DAQ/ ndscope/ diaggui:

1. Log into m1boot, change root user to su and navigate to puppert config file (should be /root/puppet/modules/ligo_cds_frontend)
2. grep for the FE name you want to deploy the model onto. For C6D and CRS models they were both on m1hamx, then it would be grep -rn "m1hamx"
3. This will return the location of the .yaml config file that puppet uses to populate the /etc/advligorts/systemd_env file you're looking for. Add the new user model to the models list in the .yaml file
4. Restart the puppet /opt/puppetlabs/bin/puppet apply --modulepath ~/puppet/modules ~/puppet/modules/ligo_cds_frontend/nodes/bootserver.pp

Warning: No server should need restarting to make the changes work. However, both times IGeorge added a new model, the boot server unmounted the controls user directory from all workstations at MIT. George strongly recomends to  that we make sure, either Fred is around, or at least you coordinate with hjim in advance when you restart the puppet, so he can remount all the user folders if needed. Otherwise you risk havin no access to a workstation until this issue is resolved (and we also won't be able to remote access MIT unti workstations have been fixed).

 

To restart DAQ (from m1fb0)

sudo systemctl restart rts-daqd

sudo systemctl restart rts-nds

 

 

For when the workstations lose control sub-directories

Either reboot; do a as root umount -f /home/controls/Desktop,

then a mount -a

Comments related to this report
arnaud - 11:15, Thursday 23 July 2026 (12212)

MIT CDS notes from various users (including this one) have been collected to this dcc page : T2500407

Regina - 14:40, Tuesday 06 October 2026 (12269)

Fred and Erik recently fixed some things on the CDS side to make it more robust. Previously the OS on m1boot was wiped. Fred is still fixing some keys but in the meantime if you ssh into any CDS machines and it gives you the error: "WARNING: REMOTE HOST IDENTIFICATION HAS CHANGED!" use

| ssh-keygen -R m1sus

replace m1sus with the machine you want to log into. Then ssh into the machine again.

Fred has temporarily changed the password to m1boot. Contact him if you need to access it.

GRAVITES General
dorot3a - posted 09:59, Monday 20 July 2026 (12210)
Update on GRAVITES 2fl setup

Note-- the basement lab is referred to as the black lab; the 3rd floor lab as the red lab.

Attached diagrams and images show the state of the current 2fl setup in Vienna. 

I was able to finish assembling the 1542 components for the 2-floor interferometer before I left in June and confirm that we can lock both interferometers simultaneously with one arm including both an up- and downlink from the black to the red lab. We already knew in principle that it was possible to lock with the link in-loop as I had in the previous few weeks been able to lock just the interferometer with one arm in the black lab and the other in the red lab, but because we couldn't disassemble the old 50km setup in the red lab until after taking the filter measurements, I hadn't been able to assemble anything resembling the full 3-arm setup or take measurements with the upstairs arm thermalized.

Tom and I disassembled the old 50km ifo in the red lab and put the third 27km spool in the upstairs isolation box, but we found that the box had accumulated enough damage in the past year or so that it wasn't isolating as effectively anymore. While I was gone, Tom assembled a second, smaller shielding box that fits just the spool which now lives inside the larger chamber in the red lab. which helps with the ambient noise somewhat. Since the common arm is no longer in the same place, this passive environmental shielding will be even more important as we lose a lot of our common noise rejection.

With the 50km ifo disassembled, I moved all components of the interferometer except for the spool in the red lab down to the basement. This configuration means that we will have two lengths of the fiber link in the wall as part of one arm, so we won't get any common noise rejection there either, but it does allow us to have all of the control and readout electronics in the same place. There's a lot more space in the black lab, it’s a lot quieter, and not having to go upstairs to lock the second ifo makes things a lot easier so until this format proves itself to be an issue it seems preferable. I reconfigured the optics in the shielded room of the black lab to the 3-arm setup; a diagram is attached. We're still using my minimal 1-PD-2-actuator control scheme from 2 years ago to stabilize input polarization after the link, it's working pretty well to keep the input polarization to the IFO constant after the link to the basement. We have 2 of these loops running in parallel, which are not shown on the diagram, but do a good job stabilizing the polarization of all input fields. Pol control components aren't shown in this diagram for simplicity, but we also actually have a pbs on each photon output; we use a total of 8 snspds, adding the counts from each pbs output to make the photon counting measurements polarization insensitive. Components of each arm are color-coded for visual clarity as shown in the attached photos.

I was able to get fringes on both interferometers simultaneously to lock both at the same time on the day before I left my last visit, but performance seems to have degraded since, which I'm working on now. Right now I'm using the AOMs to balance the power coming out of each arm (necessary largely because of a particularly lossy delay line); we won't be able to do that later as we want to keep as many photons as possible. Each of the 3 arms is already within about 1dB of the others in terms of loss. We're waiting on the new delay line but we're now pretty well length matched and just waiting on the new delay line to arrive.

Images attached to this report
GRAVITES Electronics
dorot3a - posted 09:41, Wednesday 15 July 2026 (12185)
Loop transfer functions-- 2fl setup

These measurements of the servo loops were taken in mid-June immediately before I left Vienna. Since then the performance has degraded a lot, it's unclear why-- maybe something to do with a power outage that happened a few weeks ago. Posting these still for reference. 

Servo 1 (blue/downstairs ifo): predictably, this loop is much cleaner as it's contained entirely in the downstairs lab isolation room. UGF a little below 20kHz, feature from pzt resonance around 5kHz, decent amount of phase margin. Crossover just below 300Hz, but quite a lot of excess noise above 200Hz, and more phase noise than I'd like to see below 1kHz. 

Servo 2 (yellow/2fl ifo): Also predictably, much noisier. UGF around 10kHz and also decent phase margin but with additional noise below 5kHz. Crossover around 300kHz, generally noisy at low frequencies (also predictably) with a lot of noise below 100 Hz, probably coming from the fiber link-- this was also visible in a power spectrum of the error signal taken around the same time, especially between 30-50Hz. 

Note that on servo 2 I changed R7 3.3k -> 887 Ohm in order to get the crossover below 300Hz when initially installed in May. 

These were good enough to lock at the time at least long enough for Tom to perform checks with the photons while I was away so they were left as is.

Images attached to this report
LASTI General
Yulin Xia - posted 08:08, Tuesday 14 July 2026 - last comment - 13:43, Thursday 16 July 2026(12208)
LPS primary setup and in-air results
Yulin, Denis, Rich, Bruno

I visited MIT last week to test the laser position sensors (LPSs) on the ISI table inside the HAM-X chamber. The LPS is an interferometric position sensor that will later be integrated with HoQI and COBRI on the SenIT suspension table for combined readout and noise-performance testing. Since the suspension table was not ready before my final day at MIT on July 10, three LPSs were instead installed on the HAM-X ISI table with three separate fixed mirrors, as shown in Figure 1. Each sensor and mirror is mounted on a holder secured to the platform using screws or dog clamps. The distance between the front surface of the titanium sensing head and the mirror surface is set to 48 mm, which is the nominal operating distance and gives close to maximum interferometric contrast. All three sensors can reach at least 85% contrast after alignment, and some have previously reached around 90%. For future integration with the suspension table, the simplest and lowest-risk procedure is to release the clamps, move the existing LPS with its holders to the required positions, preserve the 48 mm separation, and perform a final alignment. The correct sensor height has already been included in the holder design based on the CAD model of the suspension table.

The in-vacuum system also includes the DB-25 cable, which connects the photodiodes inside the LPSs to the vacuum electrical feedthrough and then to the transimpedance amplifier outside the chamber. The in-air electronics are shown in Figure 2 and consist of the laser temperature and current driver in the upper 19-inch chassis, the transimpedance amplifier in the lower chassis, and the laser box mounted near the 1550 nm fiber feedthrough. As shown in Figures 3 and 4, the laser box is bolted to a flange adapter immediately next to the feedthrough, giving essentially zero exposed in-air fiber between the laser box and the chamber. This arrangement is beneficial for LPS displacement-noise performance and should also be compatible with a future LIGO observatory installation. 

The AA and AI filters are connected to the m1sus CDS system using channels 1–4 of ADC2 and DAC3, with DAC channel 1 connected to temperature control and channel 2 connected to current control. The LPS CDS model has been built and is running on m1sus as M1LPS and the LPS_MAIN medm screen is linked to the LASTI_OVERVIEW medm screen.

Before I left MIT, the SQS 1550 nm 1×8 splitter had been shipped from Caltech but had not yet arrived. For the initial checks of the sensors, cabling, and CDS model, I therefore used the 1550 nm 1×2 splitter previously used for Arnaud’s CRS setup and connected LPS1 (H1) and LPS3 (H3). Once the 1×8 splitter arrives, it can replace the temporary splitter so that all three LPSs can be operated simultaneously. The attached PDF shows a preliminary measurement with H1 and H3 while the chamber was still at atmospheric pressure and the ISI was locked to ground. The two sensor spectra show good agreement, and the differential signal reaches below approximately 1 pm/sqrt{Hz} from a few hertz to several tens of hertz. The remaining low-frequency noise is likely influenced by incoherent air-current fluctuations, while the higher-frequency noise is likely dominated by residual motion of the ground-locked ISI. Both contributions are expected to decrease once the chamber is pumped down and the ISI is floated.
Images attached to this report
Non-image files attached to this report
Comments related to this report
dennis.martynov - 13:43, Thursday 16 July 2026 (12209)

This log is related to the ongoing discussion about in-air fibres between Yulin and Rich/Alex: 

In summary, I think we should avoid any sensitive component exposed to air in a precision measurement system, if possible at all. The sensors have sub-pm precision down to 20 mHz, while the optical path inside ~meter-scale in-air optical fibres fluctuates by ~1 rad on a time scale of a few sec (depending on the air currents, insulation, fibre length, etc.). This is 6-7 orders of magnitude above the level we like to measure. Even though the coupling is small and common mode, it is still visible in noise spectra as discussed below.

We spent a significant amount of time studying this problem in Birmingham. The first attached figure shows the LPS performance achieved while sensing a suspension with 3 sensors. The noise level 0.3 pm/sqHz at 0.1 Hz, a hair above the LPS sensitivity with stationary mirrors (0.2 pm/sqHz at 0.1 Hz). The laser is installed near the feedthrough in this measurement, and no fibre is exposed to air.

We then moved the laser away from the flange and installed an in-air fibre in between. As a start, we used Thorlabs SM patch cords, inspected 1 m and 5 m long options. In both cases, we see glitches straight after the installation. The glitches are caused by the stress relaxations in the fibre jacket and decay over time, but still appear from time to time, likely due to T-induced stress relaxations in the jacket and indices of expansion mismatches. The glitches and their count are shown in the second and third attached figures.

We have then tried a different set of fibres as shown in the attached figures 4-6. We got the best results with UHV SQS fibres, likely because there is no soft jacket; the fibres are insulated in a stainless steel tube. Still, none of the curves match the 0.3 pm/sqHz performance at 0.1 Hz. We tried further insulating the fibres with pipe foam. This works fine in reducing the noise of Thorlabs patch cords, but also leads to glitches because the insulation relaxes in air, similar to the jacket. 

Therefore, I think we should not compromise the performance and mount the laser on the flange as Yulin has done, if possible at all.

Non-image files attached to this comment