Displaying reports 941-960 of 1025.Go to page Start 44 45 46 47 48 49 50 51 End
Reports until 15:42, Wednesday 09 August 2023
General
evanhall - posted 15:42, Wednesday 09 August 2023 (11279)
LaTeX reference management suggestions
  1. Most physics papers and books are catalogued either in Inspire or ADS, which provide prefabricated .bib entries that you can copy and paste into your own .bib file. Do not write your own .bib entries unless you have to. Do not edit the entries or keys that come from Inspire/ADS.
  2. Instead of assembling your .bib file manually, you can use a tool like filltex to autogenerate a .bib file from a .tex file, so long as the citations in your .tex file use the bibkeys provided by Inspire/ADS (hence why you should not edit the keys). Filltex also has parameters to set the maximum number of authors included in each .bib entry, so you can avoid thousand-person author lists.
  3. If you are dissatisfied with how BibTeX prints your bibliography (e.g., lack of hyperlinks, wrong number of authors), pick a different .bst file (bibliography style file). RevTeX provides several .bst files to choose from. Do not edit your .bib file to work around an undesirable bibliography style.
  4. BibTeX has been succeeded by a more modern and flexible program called BibLaTeX, although certain widely used classes like RevTeX do not yet support it. If you have the option, you should consider using BibLaTeX instead of BibTeX — it is not too hard to switch between the two as they both work off the same .bib file format.
cSQZ General
hudsonl - posted 10:34, Wednesday 09 August 2023 (11278)
Cavity Lock PDs
The Opo's red power drifts around a lot when it's locked on green. I'm investigating dithering the laser's PZT instead of the PZTs with mirrors, since it should be able to be dithered up to 100kHz based on the manual for the Lightwave Electronics 125/126, compared to about 8kHz for the current dither locks which dither the mirrors. The Transmission PDs for the SHG and OPO are designed to have a bandwidth of 3kHz with 50k transimpedance gain -- they have a 1nF feedback resistor, creating a low-pass corner frequency of 3kHz. I replaced the 1nF feedback capacitor on PD11 with a 33pF capacitor, which should increase its bandwidth to 100kHz, the same as the laser's PZT bandwidth. I'm planning on replacing the current, low bandwidth PD on SHG transmission with this higher bandwidth PD11 and investigating the resulting loop bandwidth. By increasing the dither frequency from 8kHz to about 70kHz, I expect I should be able to increase my cavity lock bandwidth by about a factor of 10. 

I'm going to try this for the SHG first, since that cavity is the easiest to lock. If all goes well there, I plan on locking both the SHG and OPO by dithering the laser.
GRAVITES General
alossius - posted 16:40, Tuesday 08 August 2023 (11277)
Beam Profiling for AOM in GRAVITES Prototype

With reference to the last GRAVITES logbook entry (#11270), we are currently setting up a long-arm fiber stabilization system. The input beam coming into this system is roughly 2.1mm in diameter and fairly collimated. The original plan was going to be to focus this beam down and through an AOM along the beam path, however, it was decided that installing a telescope prior to any of the interferometer related optics to collimate the beam at a smaller diameter is more appropriate. The aperature of the free-space AOM that we have is either 1,2, or 3mm wide, however, we are unable to confirm which due the label missing. Regardless, collimating the beam at 0.5mm will satisify the aperature requirements and also be at a conveinient size for fiber coupling later on. 

In order to design this telescope, the beam was profiled using a beam profiler and a python curve fitting script. The first image is of the curve fit that was applied to the data collected. It indicated (approxiametly) the beam waist and the position of the waist. The second image is of the JamMT (mode-matching software) interface for the proposed telescope design. It features f=100mm and f=50mm convex lenses placed at roughly 3 and 18 centimeters away from the second alignment mirror (M4 in optical layout). The third image includes all of the JamMT parameters and the specific locations of the two lenses with reference to M4 in the optical layout. 

Next steps are to locate f=100mm and f=50mm lenses and install / test them. Then to install the 50/50 BS and AOM. 

Images attached to this report
testbedAI General
nikhil - posted 16:35, Friday 04 August 2023 (11276)
testbedAI laser interlocked

I rerouted one of the spare wires from the main door interlock system through the overhead cable tray and connected it to the JDSU NPRO laser (M126N-1064-500, serial number: 8013) . I added a snap action 2-to-6 wiring block connector in between, so we can interlock two more future lasers on that table.

RetroSense General
msredden - posted 18:21, Thursday 03 August 2023 (11275)
SR560 to AC couple signal prior to demod board

With the QPD board connected directly to the demod board, was seeing a noise floor around a couple mV/rt-Hz below 300 Hz. Seemed to be higher than expected, determined that the AD630 likely requires an AC coupled input. Applied a high pass filter with an SR560 at 30 Hz and x1 gain between the qpd output and the demod input and got the noise floor down to around 200 nV/rt-Hz which is also the noise observed when the LED is turned off and only electronic noise is left. One remaining issue seems to be loss of optical power in the LED tube. Need either a more collimated beam or more powerful LED. 

Configuration used for these measurements included the tiny 751-VSMY2890GX01CT-ND LED, 6 cm tube, 1/2" f = 25 mm lens, tiny K857PE QPD, and 1/2" retroreflector. The LED tube and the 1/2" QPD configuration is unlikely to work with a 1/2" retroreflector because the incident light is too quickly lost when the retroreflector is moved along the line between the LED and QPD. Also tried to get the 4-pd surrounding the tiny LED configuration but could not get a signal, possibly due to a bad soldering job. 

Images attached to this report
testbedAI General
nikhil - posted 03:57, Wednesday 02 August 2023 (11274)
Mach-Zehnder fringes

I set up the Mach-Zehnder arms, looked at the fringes, and compared them with simulated ones. I used the beam profiler to coarse align each beam to the output beam splitter. Since the beam alignment is coarse, the overlap is imperfect, leading to parallel fringes. As for the model, I approximated the collimated beams as Gaussian beams (2mm dia) with a large Rayleigh range.  Interference intensity,  I = |E1+E2|^2 where

E1(x, y, z) = A * exp(-((x - Delta_x)^2 + (y - Delta_y)^2) / w^2) 
    * exp(-i * (k*z + k*(x - Delta_x)^2 + (y - Delta_y)^2)/(2R) - psi 
    + k*x*sin(alpha1) + k*y*sin(beta1))
 

The first exponential term represents the Gaussian profile of the beam in the transverse (x, y) plane, taking into account the displacement of the beam. The second exponential term accounts for the phase variations due to propagation, wavefront curvature, the Gouy phase shift, and the angular misalignment of the beam.

The next steps include setting up the pico-motors, configuring the gigE camera, and pre-training an RL agent with the simulated model.

 

Images attached to this report
DarkMatter General
swadha - posted 09:31, Tuesday 01 August 2023 - last comment - 12:02, Saturday 02 December 2023(11273)
Crossover loop to slow input of controller

Problem 1: Error signal drifts over time. Turned up the LB1005 gain and turned on the integrator to stabilize.

Problem 2: Control signal slowly drifts (possibly due to slow laser temperature drifts). For this we put in an integrator to the 'slow' input of the laser controller, with a low frequency crossover between the slow and fast actuators.

Slow actuator: 5GHz/V, pole(s) at ~1 Hz => We want crossover below 0.1 Hz to prevent phase loss

Circuit diagram attached. OpAmp used: LT 1792 (low input current noise)

UGF of integrator = 1/6000 => Crossover frequency = 0.016Hz, well below 1Hz. Put circuit into loop, laser stays locked and control signal no longer drifts.

Images attached to this report
Comments related to this report
swadha - 12:02, Saturday 02 December 2023 (11414)

New NPRO seems to have opposite acutation signs for the slow and fast controllers, so we put an inverter before this circuit.

cSQZ General
Hudson Loughlin - posted 22:21, Thursday 27 July 2023 - last comment - 14:47, Saturday 08 June 2024(11272)
Installing Pyrpl
I installed the pyrpl package on a laptop at Fermilab along with the correct versions of other packages it needs. Since this is always much more of a pain than it seems like it should be, I figured I'd document my approach here to make life a bit easier the next time around. This time around, I ran the command "from pyrpl import Pyrpl", which will throw an error unless the packages are downloaded correctly. Following the steps below should streamline the process.

Here are some notes about how to go about this process:
1. Make a new anaconda environment running on python version 3.7 and install some package such as matplotlib. I'll assume this environment is called "RedPitaya"
     a. Note: The version needs to be python 3.7, pyrpl will not work with the latest version of python without some serious debugging
2. Navigate to the folder anaconda3/envs/RedPitaya/lib/python3.7/site-packages/ 
     a. Note: on a PC, the file path is anaconda3/envs/RedPitaya/lib/site-packages/
     b. Note: You may need to force your computer to show hidden folders to find these file paths
3. Download the pyrpl package from https://github.com/lneuhaus/pyrpl/tree/master
4. Paste the folder "pyrpl" from the github repo in step (3) into the folder from step (2)
5. Install the following packages into the conda environment RedPitaya: pyqtgraph, pandas, quamash, the current version of PyYAML, scipy, paramiko, scp
6. Open a jupyter notebook and run "from pyrpl import Pyrpl" If this works, or only throws an error message, the computer should be ready to interface with a Red Pitaya using pyrpl. If there's an error message, some package likely needs to be downloaded or needs a different version. Fix that and try again.
Comments related to this report
malo_lg - 14:47, Saturday 08 June 2024 (11671)
I tried this method and succeeded to connect to the RedPitaya and execute a few commands (shg.stop(), shg.scan()) but I could not lock the SHG: I obtained an error message related to the call of the function curve_async of classe Scope. Looking at the pyrpl files in more details, I found some comments about curve_async in file scope.py. Yet neither in class Scope, nor in the classes from which Scope inherited, was the function curve_async defined. 

So it seems that the current version of pyrpl (June 2024) is not perfectly suited to our use of the RedPitayas.

Another method worked instead: instead of step (3), Jacques sent me a copy of the pyrpl file from his computer. I could then go to step (4) and past this folder into the folder from step (2). Then I had to download a few more packages (pyqt, qtpy, jupyterlab, matplotlib) in my RedPitaya environment and it worked.
DarkMatter General
swadha - posted 17:18, Tuesday 25 July 2023 (11271)
Simultaneous p-s resonance via EOM scan

Measured p-s splitting of cavity via simultaneous resonance in p and s polarizations through sidebands on EOM. This was done by setting the cavity input to be close to 45deg linearly polarized between p and s (38deg towards p). Cavity was locked in p and then scanned using network analyser around where we expect the p-s splitting to be (measured roughly by scanning the PDH signal at 45deg linearly polarized input).

s-resonance was found at a separation of around 12.2MHz, along with some higher order modes, measured at the transmission of mirror B of cavity.

Non-image files attached to this report
GRAVITES General
alossius - posted 18:32, Saturday 22 July 2023 (11270)
AOM installation update for GRAVITES 1064 prototype

[Anders, Eleonora]

We removed the fiber-port coupler/colllimator that was previously installed (logbook entry #11248 and #11244) as we are going to install a free-space acoustic optical modulator (AOM). 

Before the AOM, we installed a 50/50 beam splitter after the two tip/tilt mirrors previously insalled. The AOM was then mounted along the path of the through beam of the 50/50, while a mirror was placed for the reflected beam. The reflected beam will act as the local oscillator and will be recombined with the 1st order diffraction created by the AOM. Once the AOM electronics are configured (see logbook entry #11269), a mirror will be installed to reflect the 1st order diffracted beam towards the second 50/50 bs. 

As of this logbook, the first 50/50 (BS1), the AOM, the reflected-beam mirror (M1), and the second 50/50 (BS2) have been installed. The next steps are to install the electronics, then install the diffracted-beam mirror (M2) and align it with the second 50/50 (BS2). Refer to this rough sketch for context. 

The goal is to eventually have the AOM diffracted beam coupled to a long (~200m) fiber, however, while we wait for it to arrive we are going to setup a simple free-space version to make sure we can get the electronics to work. 

Images attached to this report
GRAVITES General
alossius - posted 16:03, Saturday 22 July 2023 (11265)
2 x 7.5 meter fiber connectorization for GRAVITES small-scale 1064nm prototype

[Anders, Dorotea]

Two weeks ago, Dorotea and I measured-out and cut 2 roughly 7.5 meter jacket-free fiber cables to use as arms for preliminary testing of the linear vertical actuator for the GRAVITES 1064nm ifo prototype. 

This week and last, I succesfully connectorized the 2 fibers.

For future reference, I used Jonard Tools JIC-375 fiber strippers and methanol to strip-free and clean the fiber core from the cladding. I then attached 4 Thorlabs connectors using EPO-TEK 302-3M epoxy with a Thorlabs 3 cc syringe and needle. I then let the epoxy to cure over the weekend. This epoxy is recommned to cure for 3h at 65ºC for curing, but also cures "sub-optiminally" in 24h at 23ºC. Since I applied the epoxy Friday, I assumed that leaving it over the weekend would definetly allow it fully cure, and that an "optimal" cure was not neccesary. I then used a Thorlabs scribe, and a 30um Thorlabs lapping sheet to cut off the tip of the fiber and delicately shave off the excess epoxy. For the fiber polishing process, I used M.4423.1 5um, M.4432.1 1um and M.4450.1 Ultrafilm B ULTRA TEC polishing films with a ULTRA TEC polisher. I also used a Thorlabs fiber inspection scope during the polishing process to verify that the glass wasn't broken and that the polishing was working. 

For reference, I followed the general procedure outlined in the 3M_Connectorizing_Tutorial. 

I also measured the power losses of the cables using the RIO laser, finding that one of the arms had a ~9% power loss and the other ~20%. The RIO laser output was measured to be 1.045 mW, and the outputs of the arms were 0.951mW and 0.833 mW respectively. Using the fiber inspection scope, I identified one of the fiber tips that appeared imperfectly polishied. My assumption at this point is that this is the cause of the larger coupling loss. 

The plan is to repolish the identified tip and then leave it for Dorotea's return. 

Non-image files attached to this report
GRAVITES General
epolini - posted 18:47, Friday 21 July 2023 (11268)
Shelves rearranged in NW22

I rearranged the shelves next to the GRAVITES prototype in NW22 (see Fig. 1). The fibres are on the bottom shelf (it should be verified that they are all working properly). With Ben we moved the power supply to power the VCO from NW17 to the second level shelf here, on the left. On the third level shelf, I added a plastic box (see Fig. 2) where inside there are two light pens to check the fibres, the necessary to clean the fibres and the electronics components needed to implement the longitudinal control loop by acting on AOM (see entry #11264). The power supplies that were scattered on the bench were placed on the top shelf of the rack below the bench, as shown in the bottom right-hand corner of Fig. 1.

Images attached to this report
epolini - posted 18:34, Friday 21 July 2023 (11267)
Broken fibers stored in a box at the entrance of NW22 lab

I put some broken fibres that were lying around in a plastic box placed on a rack at the entrance to the NW22 laboratory. In the attached pictures you can see where it is right now.

Images attached to this report
GRAVITES General
epolini - posted 19:16, Wednesday 19 July 2023 - last comment - 17:44, Friday 18 August 2023(11264)
Electronic components moved from highbay to NW22

[Vicky, Eleonora, Eric]

We moved some electronics from the drawer in highbay to NW22 in order to be able to implement a feedback loop to control a long fiber length with an AOM. We took a free space AOM from the PSL table (see Fig. 1).

The electronic components are shown in Fig. 2.

 

Images attached to this report
Comments related to this report
epolini - 18:54, Friday 21 July 2023 (11269)

[Vicky, Eleonora]

In the attached picture, the fiber length control schematic including the electronic components as they are going to be implemented in the next days.

Images attached to this comment
epolini - 17:44, Friday 18 August 2023 (11294)
RetroSense General
msredden - posted 18:15, Tuesday 18 July 2023 - last comment - 18:30, Thursday 20 July 2023(11262)
De-mod board noise tested

Tried the x-channel of the new de-modulation board (have not stuffed rest of board yet). Observed 6 nV/rt-Hz @ 30 kHz with the de-mod board and the parameters below, seemingly much lower than expected with an estimated shot noise limit of aprox. 100 nV/rt-Hz. Unsure if such a low noise floor is expected, will follow up with tests of the sum channel (through the x channel of the de-mod board) to try to replicate then will stuff the rest of the board. Set up included the VSMY2890GX01CT LED, the K857PE QPD and a .5" lens. 

Attached picture shows the spectrum plots of the modulated signal (with de-mod boarD) and the non-modulated signal which had a noise of 250 nV/rt-Hz @ 30kHz. 

Other details

 

Images attached to this report
Comments related to this report
msredden - 18:30, Thursday 20 July 2023 (11266)

repeat of previous comment but in 0-100Hz frequency range

Also made sensitivity measurements:

  • 9500 V/m (de-modulated signal)
  • 11300 V/m (non-modulated signal)

performance seems worse than the BOSEM noise data when both converted to m/rt-Hz.

Images attached to this comment
msredden - 17:09, Wednesday 19 July 2023 (11263)

Tested sum and x through the x channel of the demod board. The sum showed a similarly low noise around 30 kHz of 7 nV/rt-Hz, while the non-modulated signal was clearly shot noise limited (see plots). The attached plots show the non-modulated signal and the modulated signal with the de-mod board for X and Sum. 

 

Images attached to this comment
DarkMatter General
swadha - posted 09:48, Monday 17 July 2023 (11261)
Cavity locked in p and s polarizations

Control loop for locking: gain knob on LB1005 = 3.5 (s), 4 (p)

Open loop transfer function measurement: 

Finesse measurement in p:

​​​​​​​Finesse measurement in s:

Images attached to this report
Non-image files attached to this report
DarkMatter General
evanhall - posted 18:11, Wednesday 21 June 2023 - last comment - 09:35, Monday 17 July 2023(11233)
ADBC laser swap

Swadha, Evan

Previous laser: NP Photonics Rock (see MIT:11213)

Current laser: Lighwave/JDSU/Lumentum NPRO

The laser worked fine for the first week but starting a few days ago would only run for about an hour before going into a cycle of repeatedly shutting itself off every 30 seconds or so. There is no indication of thermal overload on the diagnostic fault pin, but nonetheless I suspect more heat sinking is needed. We clamped the head to a ~2" thick aluminum block that sits directly on the table. So far it has been running for 2 hours without issue, putting out around 800 mW.

Comments related to this report
evanhall - 14:45, Sunday 09 July 2023 (11254)

Myron fabricated a new mount, but the behavior eventually recurred when the laser was left on for a few hours. We tried another aluminum mount, but the behavior recurred with that too.

To test whether this is a problem with the controller or the head, Swadha swapped the controller to JDSU FQN4113040 (manufactured May 2013).

swadha - 09:35, Monday 17 July 2023 (11260)

Ran for ~2 days with the swapped controller (JDSU FQN4113040) without shutting off. It would seem the problem was with the controller.

Displaying reports 941-960 of 1025.Go to page Start 44 45 46 47 48 49 50 51 End