As described in the last entry, the RIN cannot be measured with the cymac without adding an amplifier (i.e. SR560).
In the meanwhile, we measured it with a SR785 signal analyzer, AC coupled and floating, with input gain range -32dBVpk.
The DC voltage read by the PD is 4.3V.
The intensity noise floor is 2.6uVrms at few kHz: RIN = 20*log10(2.5e-6/4.3) = -125dBc/Hz.
The dark noise floor (of the Thorlabs PDA10CS) is 600nVrms : dark noise = 20*log10(600e-9/4.3) = -137dBc/Hz.
From the datasheet we derived the detector noise and the shot noise, considering that the PDA10CS was set to gain = 30dB.
Detector noise = NEP * responsivity * Gain = 1.25e-12 W/rtHz * 0.8 A/W * 4.75e4 V/A = 4.75e-8 V/rtHz
Shot noise = sqrt(2 * I * e) * Gain = sqrt(2 * 4.3 V / 4.75e4 V/A * 1.6e-19 A/Hz) * 4.75e4 V/A = 2.55e-7 V/rtHz
The limiting noise in this measurement is the shot noise and it has a factor 2 discrepancy wrt the dark floor noise (600nV /rtHz = 6e-7 V/rtHz).
[Eleonora, Nikhil]
I tried to measure the RIN of the NPRO laser (19th Sept ET, 20th Sept UTC) and compare it with the dark noise, as shown in Fig. 1 for the following GPSs:
Fig. 1 shows the results for the RIN, i.e. the PSD normalized by the mean of the laser power data. We are limited by some electronics nosie.
Yesterday (21st September 2023), we decided to take other data to understand where the noise was coming from. First of all, we increased the PD gain from 20dB to 30dB, in order to read on the oscilloscope 4.6V instead of 1.6V, a further increase of the gain leads to PD saturation.
In the following I list the GPSs times for different measurements (always using OBS4 channel on the cymac):
Fig. 2 shows the FFT spectra of these measurements. The wire is introducing extra noise. As expected, the cymac has a noise floor of 4uV/rtHz.
We acquired again the laser intensity noise and dark noise measurements:
Fig. 3 shows the FFT spectra of dark noise (blue), laser intensity noise (orange) and cymac noise (yellow). It is clear that the floor of this measurement is limited by the cymac + wire noise.
We measured the RIN with the SR785 analyzer for the moment.
When Masaya and I tried to close the CLF loop this afternoon, the MOG labs RF synthesizer appeared to be misbehaving. Whenever we enabled modulation, the output would shut off, preventing us from closing the feedback loop. We resolved this by turning on and off the RF synthesizer to reset it.
Yesterday (21st September 2023) I acquired data of the MZI's error signal in different configurations with the only channel available on the cymac (X5:ISC-STATE_OBS4_IN1_DQ).
In Fig. 1, the error signals for different GPSs are shown: at 19:28 UTC the peak is at 894Hz, at 19:32 UTC the peak is at 2827Hz, at 19:36 UTC the peak is at 4940Hz. I cannot acquire a spectrum higher than 16kHz with the cymac in this configuration, so I didn't wait the frequency difference to get higher. For each of these spectra I take 20 seconds of data.
Afterwards, I tuned the RF generator's frequency to bring the error signal oscillations down to few hundreds Hz. Then I closed the loop.
10 minutes of data from 19:41:00 UTC to 19:51:00 UTC with PI corner frequency at 3kHz
15 minutes of data from 20:00:00 UTC to 20:15:00 UTC with PI corner frequency at 10kHz
Fig. 2 shows the two spectra (20 seconds of data each). On the spectrum analyzer, I checked the spectrum for higher frequencies. The DC is around -22dBm and then it goes down to -75dBm until stabilize arpund -100dBm after 200kHz. Which converting in V gives the same order of magnitude of what is shown in this plot.
Connecting the correction signal (the output of the PID) to the cymac was unlocking the loop. I left the PI corner at 10kHz.
Yesterday evening, Masaya, Wen, Vicky and I tuned up the alignment of the OPO to the homodyne and got 71% visibility. Mode mismatch, as opposed to misalignment, seems to be responsible for our inability to improve visibility further. We observed fairly large nonlinear gain (at least about 5), but were unable to see mean squeezing on the homodyne's output. We plan to troubleshoot this today.
(Hudson and Masaya) We put 4 rubbers under the corners of the cSQZ table to isolate the system from seismic noise and other environmental noises.
After adding these, the OPO lock is far more robust while we're working on the rest of the optical table. It now stays locked for up to a few hours, even while we place optics and accidentally drop the occasional screwdriver or Allan key.
With the Newport pico-motors and Basler camera installed, the next steps are configuring the RL agent and integrating it into the tested setup. As depicted in Figure 1, I have set up a model-based policy optimization coupled with hybrid real/simulation-based learning. The agent would primarily interact with the experiment via the pico-motors attached to the mirror in reflection (M1) & the final beamsplitter (BS2). Currently (figure 2), the state information is derived from the spatial Fourier transform of the interferograms. 2D spatial FFT has three prominent terms: DC and two spots whose radii correspond to the amount of misalignment, and angle determines the relative pitch/yaw contribution. (state velocities will be added later). The immediate reward for a particular set of actions is currently calculated from the above states. The reward is specially constructed (see the last fig) to penalize deviations and encourage states closer to the optimal circular fringe state. Initially, I was thinking of using fringe visibility, but this requires mechanically perturbing the first beamsplitter (BS1) from -pi to pi, which is noisier.
From the initial training, it seemed (from figure 3) like the agent was learning to collect higher rewards. But on closer inspection, the agent was merely pushing out one of the beams to have a single circular beam that mimicked the central maxima. I have tweaked the model to kill the training episodes whenever the misalignment get significantly worse. This prevents the above behavior (figure 4). But I haven't yet trained it for more than an hour. This will be done in the coming days.
I plan to augment the real experiences collected by the agent with those obtained from a Finesse simulation of the setup. This could potentially speed up the learning. Another idea is to fill in the experience buffer from data collected from human demonstrations (sub-optimal policies). Both these should, in principle, help us tackle the sample inefficiency from real-world learning.
We currently use acA720-290gm basler Ace cameras to analyze the Mach-Zehnder output. These are Power over Ethernet (PoE) cameras hence require an additional (netgear) network switch.
The connection is done as follows:
I used Pylon 6.3.0 software to do the initial configuration. The easiest way to set a static ip address for the camera is by using the ipconfigurator app found in /path-to-pylon/bin/ . I scanned the mit.edu network for unused ip address. Both the PCI express network card of the host machine and the camera should be on the same subnet. I initially noticied frame drops, this was resolved by modifying gige network adapter jumbo packet size to minimize such frame drops. Check screenshots for more instructions.
These cameras support both gigE & genTL standards. I set it to genTL was it provides finer control & better performace. PixelType enumeration is set to Mono12Packed. Technically we can go upto 300 frames per second (unnecessary). So I set it to 25 FPS with manual triggering and to the lowest possible exposure time of 20 milliseconds.
I found the following GigEVisionQuickStart.pdf quite helpful. For more details instructions, see Joe B's dcc doc: https://dcc.ligo.org/LIGO-T1300202
Yesterday I set up a photodiode at the unused port of the PBS of the second power controller of the set up in order to record the amplitude fluctuations of the laser. I installed a steering mirror, a lens (focal length = 50mm) to focus the beam on the photodiode (Thorlabs PDA10CS) and two ND filters in front of the PD (ND10A and NE20A). After aligning the PD with the mirror, the power level recorded on the oscilloscope is 1.44V. Fig.1 shows the set up.
Since only one channel of the cymac works properly, I disconnected the temperature sensor and I connected the PD to the cymac ADC (around 8pm ET). Nikhil changed the sampling frequency of the recorded data for the channel X5:ISC-STATE_OBS4_IN1_DQ, from 512Hz to 32768Hz.
GPS of data:
The temperature measured by the termistor in NW22 over the last weekend is reported in Fig. 1. The maximum temperature drift corresponds to 0.008%.
The MZI stayed locked for the entire weekend and the error signal drifted by few hundreds of Hz, which is less that what has been observed during last week. This can be due to external perturbations due to people working around the table during the week.
[Eleonora, Vicky]
Yesterday, I tried to measure the visibility of the unbalanced MZI. Since the output is coupled to a PD with two ports, one RF an one DC, it was not possible to measure it by just looking at the RF fringes (71MHz). This means that the DC component is filtered out from the RF signal and the RF fringes are centered around zero. In order to get a rough estimate of the visibility, I balanced the power in each arm and I measured the distinct power of each arm on the oscilloscope and the amplitude of the peak-to-peak of the RF fringes. Then we converted them into mA taking into account the different Transimpedance Gain for DC (10V/mA) and AC (40V/mA) according to the datasheet. Beforehand, I installed a polarization controller (paddles) l on the long arm of the MZI (see Fig. 1) in order to match the polarizations in the two arms by maximizing the fringes' amplitude. The peak-to-peak amplitude increased from 0.6V to 1V by adjusting the paddles' angles.
DC voltage and current:
V_DC1= V_DC2 = 0.150V -> V_max = 0.3V
current = 0.3 V * mA / 10 V = 0.03 mA
AC voltage and current:
V_pp = 1 V
current = 1 V *mA / 40 V = 0.025 mA
Considering that the visibility should be maximized when these two values are equal, we can conclude that an estimate of the visibility could be 0.025/0.03 * 100 = 83%.
Since, the fibers of the two arms should be very similar (customized from the same company) and then the beams are recombined in a fiber BS, if the powers are balanced, we expect the visibility to be good. Moreover, we shouldn't have mode matching / alignment issues as in free-space. Polarization changes can affect the visibility, but it can now be recovered by manually acting on the paddles.
Masaya and I increased the OPO's IR output power by picking off 50% of the main laser light to send to the OPO via the CLF port. The power level is now large enough to be easily visible on an IR viewer card, which should make it easier to get the homodyne roughly aligned to the point that we can use the homodyne electronics to optimize alignment and visibility.
I moved from green lab the temperature monitor board, shown in Fig. 1 and I installed it next to the box containing the 200-meter-long fiber, shown in Fig. 2. I fixed the sensor to the plastic spool (Fig. 3) but I will also check it fixed on the bench. I am giving the +15V and the -15V with the Keysight E3630A Laboratory DC power supply, triple-output that was used to power the Rio fiber laser on the bench. I connected the sensor BNC output on the bigger box to the THERM1 BNC input of the smaller box and the TOUT1 before to the multimeter and then to the cymac. I am recording temperature data with the same channel used for the error signal (X5:ISC-STATE_OBS4_IN1_DQ).
The conversion Volt to Celsius for the temperature is (Volts+22.7)/0.601 = X deg C.
Fig. 1 shows the temperature drift over last night, while the sensor was placed on the plastic spool inside the box.
The temperature changed by 0.065°C over more than 15 hours which corresponds to a 0.17% change in 15 hours and 0.01% change in 1 hour.
Yesterday I moved the thermistor to the bench next to the spool, as shown in Fig. 1. Data acquired with the cymac are shown i Fig. 2 for 15 hours (from 09/14 UTC 20:00:00). There are some oscillations, 2 per hour, i.e. 0.5mHz, as zoommed in in Fig. 3.
Nikhil and I connected one signal from the system to the cymac. We used the temporary board shown in Fig. 1. It is connected to the third channel (pin 2 and 7) but it is shown on the channel X5:ISC-STATE_OBS4_IN1_DQ.
It is possible to remotely access the cymac by ssh -YC controls@cymac.mit.edu. Nikhil wrote a code to import, save and plot the data on matlab in the home/controls/Documents/nikhil.mukund/frameReadUtils/example_read_frame_data.m.
To convert counts into Volts: [V] = ([counts]/2^16)* 40V.
I recorded the data overnight from 21:45h UTC.
In the past days I worked on the locking of the fiber length stabilization lock. The main updates with respect to the last logbook entry #11312 are listed in the following.
1. RF generator frequency and VCO frequency synchronized
By mixing them, I reduced the offset and closed the loop with the New Focus PID controller. Then I reconnected the original loop elements.
2. Optimization of the power coupling in fiber
The coupling efficiency in the two fibers reduced a lot over time. I optimized it back and with Vicky we replaced the mount of the short-fiber port's post since it was not stable (magnetic base one). We optimized the power reaching the RF PD by tuning the power controller before the two steering mirrors in front of the first MZ BS. We maximized the coupling efficiency by looking at the DC OUT and then we tuned the HWP in order to have the higher power that does not distort the RF OUT of the PD. We are then combining this signal with the LO RF generator set at 7dbm.
3. Filters between the VCO and the amplifier
As already mentioned, the VCO is set to 71MHz with the PID controller's internal generator. In order to filter the frequencies higher than 80MHz, we installed a filter DC-190MHz (BLP-200+). This filter is followed by two power attenuators 10dB and 1dB.
4. Reduce the drift between the VCO and RF generator
The error signal (mixer's output after LP at 1.9 MHz) oscillation frequency drifts over time. From hundreds of Hz till hundreds of kHz. To be able to engage the loop, we need to reduce this frequency by tuning the RF generator frequency down to hundreds of Hz.
5. PID controller settings to lock
The best configuration to engage the loop is PI corner of 300 Hz and LF Gain Limit of 80 dB. The knob of the gain is broken, so it is set by hand every time. I put the long fiber inside a metallic box to isolate it from the environment. In Fig 1 the error signal in blue and the correction signal in yellow are shown. The spikes correspond to my tapping on the metal box. The DC correction is around 7V, which is the DC value needed to set the VCO to its correct RF frequency.
The loop stayed locked over night for the past two nights. I checked the following day the situation in terms of frequency drift of the error signal and reduced it by adjusting the RF generator frequency and lock again.
Night between 13th and 14th September
Between the afternoon (around 6pm) of 13th September and the afternoon (around 3pm) of 14th September, the loop was still locked and responded to excitations to the box on top of the fiber spool. I verified that the error signal changed by stopping the light going to one of the two MZI arms and it did. Then I unlocked it and I verified the frequency of the error signal and it was around few hundreds of kHz. I reduced it to few hundreds of Hz and locked again.
Night between 14th and 15th September
Between 3pm of 14th September and 11am of 15th September the frequency drifted by 5kHz and I put it back to few hundreds of Hz (around 200Hz).
I have been dither locking the OPO when dithering the PZTs at 22kHz. Ideally, the dither frequency will be as large as possible since larger frequencies will allow the loop bandwidth to be increased and will decrease contamination from environmental noise. I tried dithering the OPO's PZT at higher frequencies, but the PZT's response seems to become nonlinear for frequencies above about 25kHz, so it seems unlikely we can increase the dithering frequency much farther.