M. Richardson, M. Todd
This morning I did a little bit of mode matching work to squash our even mode peaks, which was met with some success. The next step was to try and start getting some of the elctronics set up for looking at an RF error signal. With Eric's help Mitchell and I were able to setup the ISC PD chassis on the racks by the PSL and power the RFPD we found (18MHz but should work for our 20MHz EOM). Along with this came the benefit that the LIGO power strip now is connected to the Sorenson PS's for +/-18V.
We were not really able to see much on the DC channel of the RFPD in terms of REFL dips. After awhile, I think we realized we still have some alignment work to do so that we are sure we aren't clipping anywhere. Additionally we want to be sure that the promptly reflected beam is will overlapped with the cavity eigenaxis.
I set up a "new" cds laptop for the coupled cavity experiment. It should be set up to work with all the normal CDS tools provided that it is connected to the LASTI CDS wifi (LIGOHIGHBAY5 network).
One may have to remount the network drives after connecting to the wi-fi (sudo mount -a)
It should be set up with a DHCP reservation on the LASTI router for 192.168.0.24
I tested all the normal CDS tools and everything seems to work. Unfortunately, the camera client seems to be having issues running over Wi-Fi. I probably need to hack the camera server more to make it work.
I attach a plot of our threshold power (in TEM00 532 nm power incident on M1 of the OPO) over the last 4 months. Unfortunately, despite a strong start it appears that the SPPKTP crystal is only aging modestly slower than the crystals used at the site to date.
I'm trying to clear out the computer graveyard in the LASTI control room so we have sufficient workstation desks when the coupled cavity experiment ramps up.
I plan to schedule an E-recycle pick up with MIT for the week of Sept 21 to give folks time to identify any hardware in the NW17 hallway they would like us to keep.
Here's what I moved to in front of the freight elevator for pickup:
Item Estimated Purchase date
SunBlade 1500: 2002
SunFire X220 (2x): 2006
SunBlade 100: 2001
Thinkmate U1 Server: Unknown
4x Slow control Servers from PDE Expt: Unknown (likely earlier than 2007)
Dell Inspiron 530 Desktop (4x): 2007
old Non-widescreen monitors (4x)
1st Generation PDE Front End machine: Unknown (this was not the front end at the end of the expt's lifecycle, i am saving the newer front end machine)
Old D-space DAQ: Unknown
Below are the Items I decided to keep. Still old, but we're running low on computers to use as CDS workstations so we need to keep something
Item Estimated Purchase Date
Dell Optiplex 3010: 2012
Lenovo ThinkServer TS140: 2013
Lenovo ThinkStation E30: 2011
(old CDS front ends) Supermicro U2 Rackmount Server (2x): 2010 Note: There are 2x more of these in the racks in the highbay
6x Widescreen monitors
M. Richardson, M. Todd
Mitchell spent some time re-doing some of the output path by replacing OM2 with a 1" optic and putting it further away and pointing to come back to the newly added OM3 which seemed to remedy the problem of clipping on the previous OM2 we were having. We then re-installed the OC and got the cavity roughly flashing, and with some alignment tweaking got it so that we were seeing clear FSR + TMS mode structure. We could really reduce the mis-alignment peaks (odds) but as expected we cannot reduce the mode-mismatch peaks (evens). Mitchell estimated the TMS be about 4MHz and the FSR to be 15MHz which seems to line up with the mode spacing seen in the picture, as we estimate the mode scan to be about 20MHz. We will try a little bit of mode matching next time and fine-tuning the alignment, and then we will try to generate a PDH error signal.
M. Richardson, M. Todd We managed to get the test cavity flashing today. We used the following strategy which seemed successful: 1. Starting without the OC, the output steering mirrors were used to align beam to TRANS PD and camera. 2. Adjusted IC alignment to get the input beam retroreflected and observed on REFL. 3. Placed OC in the beam path, and adjusted pitch and yaw of the output steering mirror (approx. 1/4 turn up in pitch and then yaw to right as needed). 4. Adjusted OC alignment to get retroreflection. We could see the cavity flashing on the TRANS and REFL cameras (video included). A function generator was used to ramp the "fast" actuation on the laser, and we observed the REFL dip and TRANS peak (image also included).
M. Richardson, M. Todd
We spend some time putting a 2" lens in on the in chamber table, to ensure we were not clipping on one of the steering mirrors. Then we recovered the alignment to the camera and PD. Overall, beam is now slightly larger on the camera, but not concerningly so. Next steps are to align the IC and get the REFL beam aligned.
M. Todd
This morning I removed the IR cut filter from the CCTRANS camera. I had thought the part I removed was the IR filter but there was an additional thin window in front of the sensor. I had to disassemble the camera to safely remove it without damaging it, but was successful in doing this. I installed it back in the TRANS setup and reinstalled the OC, where I was quickly able to see the beam on the camera after some alignment. This should make the next alignment steps much "easier".
Vermeer took some power measurements of the new 1-8 splitter sent from Birmingham. Seems to work well enough. Attached are the measurements.
Very nice, thank you, Bruno and Vermeer. Would you please set this splitter in the tank for the sensors?
REMINDER: When comparing to the values at the sites, recall that this OPO has the O3 mirrors
Note: I've been busy for the last couple of months. We probably don't need to log much more often than this, the changes seem to be slowing down a bit.
This week
532 Power at Fiber Launch: 46.9 mW
REFL 532 Power (Unlocked): 31.5mW
REFL 532 Power (Locked): 11.6 mW
Trans 532 Signal (Locked): 6.00 (i think this is in uW but seems low, need to check calibration)
532 Mode matching = 0.71
Seed Incident: 35 uW
Seed Trans (no gain): 0.150 V
Seed Trans (max parametric gain): 1.42V
NLG: 9.46
Optimal OPO Crystal Temp: 34.740 C
M. Richardson, M. Todd
We spent the morning trying to realign the TRANS path with OM1 (the mirror right after transmitting through the output coupler [OC]) so that we could see some signal on the TRANS PD. We were able to in the end, with the help of a foil wrapped power meter and all the lights off in LASTI. Mitchell found that relative to the alignment WITHOUT the OC, OM1 needed to be pointed up and to the right to bring the beam back onto the TRANS PD. We could not see anything with the TRANS camera however, even with all the lights off.
We then tried to walk the input alignment around to try and get the REFL beam back on the REFL PD and camera, but in that effort we lost the TRANS PD power, so we had to start over. Fortunately we were able to recover the alignment to the TRANS PD without the OC, and hopefully repeating the "up and to the right" offset with OM1 will repeat success on recovering the TRANS PD with the OC installed.
I think the better approach for getting the REFL beam back is adjusting the IC alignment. This will most likely change the deflection but can be recovered hopefully with the OM mirrors.
M. Richardson, M. Todd
This morning we suspected that the input coupler in out setup was wedged so we rotated (rolled the mirror in the optical axis) to see if the transmitted beam deflection angle changed, and indeed it did. We reasoned that the only reason the deflection angle of the transmitted beam should change was if there was a wedge. We did not calibrate this in any way so we have no good estimate of the wedge value (but it's ballpark probably 0.5 degree), but we are convinced it is wedged in some manner.
This afternoon we tried walking the beam around with the PSL periscope motorized mounts without any success. We actually ended up losing the beam, so we decided to start over by removing the output coupler and aligning the beam to the TRANS port optics. But we could not recover the alignment to REFL by walking the beam around.
Tomorrow we will wrap a power meter in foil and see if we can measure any transmitted power through the 60ppm output coupler to hopefully get some small signal on the TRANS PD before aligning the cavity. We will also have to get the REFL beam back, so Mitchell will once again be traversing the beam tube in that effort.
Mitchell R, Matthew T Spent the afternoon today continuing to attempt to align the test cavity between the Y HAMs. We first removed the input coupler from the beam path (with the output coupler already having been removed), and aligned the beam onto the TRANS PD and camera. The output coupler was then placed back, and we were able to retroreflect the beam back onto REFL. The input coupler was placed back into the path, however we were not able to see any reflections between the cavity mirrors. Nonetheless, we aligned the input coupler with the promptly reflected beam, which was retroreflected and observed at REFL. Retracing the beam path at this point, we found the input coupler appears to have displaced the beam, as it is now missing the output coupler. We were unable to restore alignment by walking the beam. Based on this, we are beginning to suspect that the input coupler may be wedged, which we will confirm tomorrow. Note: In the process of adjusting the input coupler, I bumped a clean Allen key off the Mid Y HAM table (at the end facing towards End Y). I think it has fallen to the bottom of the HAM, and will need to retrieve it before pumping down.
COBRI splitter (1-4 1550 PM) was removed last week AUG 20 2026. Upon opening the stainless steel case splitter housing we noticed some black rubber along with a couple of epoxies bonding the fiber to the case. The current plan is to use a razor blade to carefully remove as much rubber as possible, then to use a small amount of epoxy to entomb the rest. We have received Loctite Ablestik 2115 Epoxy Adhesive (Formerly known as TraBond 2115.) This will be used to seal any non vac materials in the housing before it goes through the cleaning procedure. Splitter info: TYPE: 1550nm PM 1-4, 250 µm bare fiber P/N: PM-PLC-B-1x4 S/N: 10260717060001 CONNECTOR TYPE: FC/APC FIBER LENGTH: 1+-0.05M
In order to construct a new pump beam path with support for squeezed-light injection into the LWE-120, I have been digging around to find the cavity geometry associated with this laser.
Thankfully, between Peter's paper and a patent document I dug up from Lightwave Electronics (1989 - attached), we can work out the most likely cavity geometry. In the assembly photographed here, the beam parameters can be solved for assuming a 160-mm ROC on in the input/output coupler and no other curved optics. The total cavity length in the material is 11mm and a refractive index of 1.82 is assumed for Nd:YAG.
| Parameter | Value |
| Waist location (inside cystal) | 5.5mm |
| Lasing mode waist @ 1064nm (inside cavity) | 74um |
| Pump waist @ 808nm (inside cavity) | 64um |
| Waist location (outide cavity - image inside cavity) |
9.2mm |
| Lasing mode waist @ 1064nm (outside cavity) | 73um |
| Pump waist @ 808nm (outside cavity) | 64um |
These calculations assume that the input coupler is spherical. Hopefully this is a close-enough start to get something started in term of a beam path design
M. Richardson, M. Todd
We removed the output coupler of the test cavity and mounted the 2" HR mirrors in the cleaned mounts. We put these in and got the beam aligned to the periscope, and then aligned the periscope mirrors. We installed a few steering mirrors and beamsplitter and lens on that same table as the output periscope and got beams on a TRANS PD and TRANS camera. We should be able to get the output coupler back in and move onto aligning the cavity with the combined REFL and TRANS photodiodes combined with cameras at both
M. Todd
I replaced the CCTRANS that was at REFL with the CCREFL camera and confirmed that it was functioning as expected. Both the CCTRANS and CCREFL IR filters were removed; I wrapped them in foil and put them by the iMac next to the PSL. I maxed our output power with the HWP in order to give us the best chance at seeing a transmitted beam so that we could align the TRANS path without removing the output coupler. I was not able to see any hint of a beam with the IR card so I think we will have to remove the output coupler in order to align the TRANS path for the first go.
Over the past two weeks, I have been setting up and characterizing a delayed self-heterodyne measurement system for the sub-STL laser experiment. My goal in this endeavor was to model and confirm that the frequency noise sensitivity of this system could be low enough to feasibly measure the Schawlow-Townes frequency noise that Peter and co. measured back in 1989 (https://opg.optica.org/ol/fulltext.cfm?uri=ol-14-18-993). This sets a solid target sensitivity of better than 0.25 Hz/rtHz @ a Fourier frequency of 80 kHz to go after.
I started off with the simplest possible system using a Mephisto 500mW NPRO laser (the one we took from Vivishek's lab) as the source. It is coupled into PM fiber and split with a 90/10 fiber beam splitter. The 90% tap feeds a fiber-coupled AOM driven at 110 MHz. The other path is coupled into a 200-meter-long SM fiber as the delay line. After this, the delayed path and upshifted paths are recombined with a 50/50 beam splitter and one of the output ports is connected to our custom RF PD (it has much lower dark noise at 100 MHz than a Newport 1811... and we are fresh out of fiber-coupled 1811's anyway).
The beat tone is fed directly to the Agilent PXA and its phase-noise spectra is taken using the same feature we used to characterize the OEO. The phase noise in this measurement is a combination of the frequency noise spectrum of the laser and thermodynamic fiber noises. After reading this really cool paper (https://doi.org/10.1364/OPTICA.470430 ;) ), I was able to put together a best-effort model of the fiber noises including thermomechanical, thermorefractive, and GAWBS phase noise. In combination with a measurement of the PXA + RF generator noise floor, we can get an idea of our frequency noise sensitivity.
Our sensitivity noise floor is (hopefully) about 13 dB below the target frequency noise we expect from the low-power NPRO we are repairing. With this simple setup, the RF generator phase noise (driving the AOM) is actually quite dominant, but I have some ideas for how we could get around that noise. With this fiber length, we have a clean response all the way up to a few hundred kHz before the null in the discriminator response peaks up at 500 kHz or so.
Finally, I went ahead and did the experiment with the Coherent Mephisto at 250 mW of output power. Comparing the total frequency noise measurement including the setup noise and a ballpark model of the Mephisto's frequency noise in this nice paper from Henning and co. (https://arxiv.org/abs/2508.10477v1) reveals a fairly close agreement.
Between 1 and 10 kHz, we are almost certainly limited by fiber vibration noises as it is not isolated from acoustic noise whatsoever. As far as I could tell, no published measurements of this laser's frequency noise above a Fourier frequency of 10 kHz exist. Fudging of the model can be done to show an extremely good agreement between 10-100 kHz, but that would only be speculation. In any case, it seems we have a good start at being able to measure frequency noise at or possibly below the STL for out test laser.
M. Richardson, M. Todd
We dug up a function generator (non-trivial to find as very few seem to be unused) so that we could start scanning the laser PZT. Once we plugged it in we started trying to walk the beam with a combination of the periscope top mirror and the steering mirror before the periscope. This was met with limited success so we got the camera setup on REFL and aligned it. We didn't try much serious beam walking with this setup but I think the next task is to setup the TRANS path and get a camera on it. I think using the TRANS camera and TRANS_PD will give us our best "error signal" for walking the beam into alignment.
Note: The TRANS camera is actually in REFL at the moment because the ethernet cable does not want to come out of the socket. Additionally, we had to start up the pylon server again to get the camera streaming. I'm not sure how often that needs to be restarted for streaming, but we will eventually make a guide for it adding to what Eric started.
The previous fiber setup for the LPS sensors was Qty:2x, 2-1 fiber splitters. Which gave LPS 1,2,3 -> 290 µW , 400 µW, 1000µW The power measurements from the 1-8 1550 SM vacuum compatible fiber seem to be reasonable for use with the LPS SENSIT test. One of the fibers was broken upon arrival. This broken fiber will be cleaved at 20˚ to reduce backscattering. The 1-8 SQS splitter info can be found here: LIGO Document C2600003-v1 Attached is a document of the power measurements, as well as the current LPS fiber connections.