Displaying reports 561-580 of 1025.Go to page Start 25 26 27 28 29 30 31 32 33 End
Reports until 11:10, Friday 14 June 2024
cSQZ General
hudsonl - posted 11:10, Friday 14 June 2024 (11674)
Mode Matching CSQZ Seed Laser and PDH Locking OPO in IR
[Hudson, Malo]

In normal operation, when producing squeezed light, we send most of the light to the input of the SHG and a small amount of light through the back of the OPO's high reflector for the CLF beam. However, it is useful to send a large amount of power through the CLF port of the OPO for alignment. Previously, we had kept the OPO locked during alignment by locking the SHG with a small amount of IR light, locking the OPO with an even smaller amount of green light, and then keeping the OPO dual-resonant by adjusting the phase-matching temperature. Instead of this scheme, we would like to lock the OPO in IR directly, which should considerably improve the lock stability and the power level out of the OPO.

To do this, we added a free space EOM phase modulator in the path of the main laser, which will be used for the IR PDH lock to the OPO. We also added a free-space Faraday Isolator, which will allow us to remove a fiber Faraday, and re-tuned the mode matching. Previously, we had about 50% mode matching from the main laser into the first fiber. After adding the new optics, we have improved this to about 70%. Now, with 2.9 mW out of the main laser (after an attenuator formed by a half waveplate and a polarizing beam splitter) we have about 2.4 mW sent to the fiber (after some losses from the Faraday, EOM, waveplates, lenses, and mirrors) and about 1.45 mW out of the 90% pickoff from the 90/10 beam splitter the laser is fiber-coupled to. Accounting for the 12% loss of the 90/10 from the perspective of the 90% port (10% from the pickoff, 2% additional loss), the fiber coupling is 1.45/(0.88*2.4) = 70%.

Currently, about 50% of the light from the main laser is coupled out of the 90% port of the 90/10 beam splitter, so when the laser power is turned up to 500 mW, we expect 250 mW out of this port. After the fiber bench, we then expect 125 mW of light. Currently, we have a Thorlabs Faraday circulator with about 3dB loss after the fiber bench, so we expect about 60 mW pumping the SHG. After replacing this with a higher quality AFW circulator, we expect about 100 mW of light pumping the SHG. The AFW Faraday is specc'ed at 0.8 dB expected loss and we expect about another 0.2 dB from the fiber connector (this could be eliminated by splicing).

We expect the OPO to reach threshold at about 80 mW of incident IR pump power (see https://emvogil-3.mit.edu/lasti/index.php?callRep=11660 ), so we should be able to laze the OPO with the new configuration once the new Faraday from AFW arrives.
cSQZ General
hudsonl - posted 11:29, Wednesday 12 June 2024 (11673)
Bumped OPO 532nm Transmission PD
I bumped the 532nm transmission pd for the opo, likely misaligning it slightly. This will need to be fixed to make this a useful monitor once we're back to sending high green power into the OPO. Currently, we have very low green power so we can have a high-powered CLF beam for alignment.
cSQZ General
jacques - posted 19:56, Saturday 08 June 2024 (11672)
Power drifts attenuated by putting a fiber Faraday circulator

Hudson borrowed a Faraday circulator from Slawek for some quick test; to see if adding a circulator between the output of the UBench and the pigtail fiber reduced the power fluctuations, as it seems that most of the back-reflected light couples back to the UBench. Sure enough, as I had written in my previous entry, this qualitatively solves the issue: when there is 0.92mW incident on the cSQZ, we measure 0.17mW of light at the unwanted output of the circulator. This is compatible with the figure of 10% of relative power fluctuations that I was observing previously on PD13, and this shows that such amount of light does indeed reflect back into the fiber. For example, now, tapping on the waveplates on the UBench does no longer induce any significant power fluctuation on PD13.

The bad news is that this Thorlabs circulator has intrinsic losses of 2dB, which means that, with the usual 50% mode-matching of the UBench, we have 5.4 dB of losses between the input of the UBench and the input of the cSQZ. But we can still lock the SHG and OPO in HD alignment mode, provided that the laser power is maximized.

Next step: buy a fiber FI (ideallly with as low losses as possible) and make sure to tape the fibers of the FI on the table to minimize power fluctuations due to polarization changes in the fiber.

cSQZ General
jacques - posted 20:55, Friday 07 June 2024 (11670)
Power drifts are coming from scattered light on the input SHG mirror and going back into the SM fiber

Following my previous logbook post (https://emvogil-3.mit.edu/lasti/index.php?callRep=11663), one hypothesis is that the fluctuations are coming from an interference from the light scattered by the reflection of the input SHG mirror. I tested this by swapping the PZT actuation of the SHG, from the end mirror (M2) to the input mirror (M1), and measured the DC power of the light detected on PD13 (supposedly monitoring the input power, but also affected by scattered light) on the scope for time scales larger than 1 sec (= typical sloshing optical phases timescale). I monitored the PD13 power for two cases: no actuation on M1 (sloshing phase) and full scan of M1. I get the two measurements on the scope below. 

It is thus clear that the fluctuations are coming from some modulation and interference involving the input light, namely light reflected off M1, going back into the SM fiber, being scattered somewhere in the EOM Ubench and going back into the cSQZ with a random phase. I know that the scattered light reaches the Ubench because I can tap the waveplates on the Ubench and see that the fluctuations worsen.

This is a nonnegligable effect as this accounts for +-5% to +-10% of IR power fluctuations from the mean value, which translate into up to +-20% of GR power fluctuation, which translate into a large fluctuation of the NLG. See attached pdf file with the computations and orders of magnitude.

The next step is to mitigate this power fluctuation by directly actuating on the IR input using a VOA, and monitoring the GR power on the transmitted PD (also possible to monitor the NLG through the 2f beatnote of the CLF).

Images attached to this report
Non-image files attached to this report
LASTI General
- posted 13:16, Thursday 06 June 2024 (11669)
X-end HAM Status

Both Doors are off The VOPO table has been removed

The T240 pod is installed, plugged in, dogged down and JD has some location marks to generate a table location

The inner O-ring on the crane squeezer side is popping out, we currently have 6 six clips  to keep it

 The ISI is unlocked, and within 0.5mm of centered (with no fine tuning!!)

There are 6 free 25 pin cables (unlabeled and a bit of a rats nest)

There still is some aluminum foil, kimwipes, tools and a few loose screws on the table

------------

   table is mostly balanced, 0.1,0,1.5Volts (i think), could enough might do more later

   there are a lot of table weights stored in the beam tube, and some small side weights under the platform on the back door side

   there are also a bunch of screws and dog clamps in the SS bin

    I lost a screw on the cable clamp (1" 2-56??) there are still three so it will be fine

    the T240 cable is on the lower feed through of it's flange

cSQZ General
jacques - posted 12:06, Thursday 06 June 2024 - last comment - 12:51, Thursday 06 June 2024(11667)
Homodyne visibility tuning

[Malo, Jacques]

The goal of yesterday's work was to improve the alignment+Mode matching from the cSQZ to the HD. It has been reported that the visibility was 80% and was likely one of the main limiting factors for having more SQZ (see my last post where I had 2.5dB of SQZ vs 14dB of aSQZ).

We started the shift by putting the cSQZ system into HD alignment mode (see Hudson's entry https://emvogil-3.mit.edu/lasti/index.php?callRep=11634). I moved the 90% pickoff from the input of the fiber bench to the polarization control paddles on the CLF path, and then moved the 5% picloff for the CLF from the input of the first AOM to the input of the fiber bench. I tuned the lightwave power so that the CLF input into the cSQZ has ~40mW, while the input into the SHG has ~3mW. I had to increase the gains of the OPO PDH PD and the PD/beam blocker on the path towards the HD; I had to flip a ND 2.0 filter and add another ND 0.6 filter in front of the CLF reflected PD. I had to add a ZFL amplifier to the RF output of the OPO PDH PD. With the setup adjusted this way, one should see up to 80uW CLF power out of the OPO going to the HD, when the SHG and OPO loops are closed.

At first both the SHG and OPO loops could close (provided that the temperature was tuned on coresonance). But the CLF and LO powers were unstable. Some tips for stabilizing the powers:

1/ Change the OPO temp to be out of phase matching but in coresonance, so that the noise from the GR does not affect the transmitted CLF.

2/ Optimize all polarization paddles and waveplates to maximize the powers, both on the CLF path and the LO path. To balance the powers, only use the optical attenuators without touching the polarizing elements.

With these tips implemented, the procedure for HD visibility maximization is the following:

1/ Balance the powers between the CLF and LO using the attenuators and checking on either PD channel of the HD.

2/ Check that the powers stay balanced over ~2minutes to ensure that the polarizations are optimized.

3/ move the lenses of the telescope on the cSQZ path and realign the two mirrors in order to optimize the visibility. Repeat.

Since the OPO lock is fragile, we had repeated unlocks of it and I struggled to close the loop each time, because the opo.lock() function needs a coresonance to engage. Therefore I will write a code which does not need IR resonance for it to close.

Results: at the end of the shift Malo managed to obtain 86.3% of HD visibility (vis = (596-44)/(596+44), upwards form the 80% measured by Hudson last time (https://emvogil-3.mit.edu/lasti/index.php?callRep=11632). See screenshot. We should still be able to further improve this.

Images attached to this report
Comments related to this report
jacques - 12:51, Thursday 06 June 2024 (11668)

The weather outside was hot (~30°C) but the lab temp and humidity was reasonably well controlled ( between 20.6 and 21.1°C and between 50% and 53%).

cSQZ General
jacques - posted 23:12, Tuesday 04 June 2024 - last comment - 13:58, Wednesday 05 June 2024(11665)
Towards NLG scan (1)

I mainly spent the day trying to understand Hudson's code, change it slightly for ease of access, and recover all the cSQZ loops to prepare for a NLG scan tomorrow. The weather today in the lab was rather stable. I borrowed the Govee thermometer/hygrometer from Eleonora's setup and placed it on the cSQZ. It registered 21.2+-0.2 °C and 52+- 1% throughout the afternoon.

I modified the opo.lock() code to quadruple the scan speed (decimation of 256 instead of 1024 on measureIrResonance and measureErrorSignal), to symmetrize the error signal sweep (see screenshot) and have a better slope fit.

I have noticed that sometimes the opo.lock() does not acquire the IR trans signal, this is because the CLF power is too high. Turning it down solves the problems and allows the lock to proceed.

I then measured a NLG with the GR power that we are currently able to produce (25mW out of the SHG; if this value goes down, check the IR alignment on the SHG by tuning the input PBS). I was able to measure an amplification factor of 17 using the power on the PD blocking the HD path (amplified on resonance= 2.62V, non amplified on resonance = 0.32V, non amplified out of resonance = 0.176). This was obtained by tuning the OPO temperature to tec.opoSetpoint(33.07) when the OPO is on resonance.

I was not able to lock the clf loop at first, because the gain was too high. I proceeded to change the code of clf.lockClf() so that it can accept two arguments (proportional gain and integrator), without having to reexectue the whole code. For example, with clf.lockClf(prop=7, integral = 5e2), I get the following transfer function using clf.clfNA() when the loop is closed (see screenshot). Actually I don't really have another way to check that the loop is closed other than verifying that the TF makes sense.

Similarly, I was not able to close the LO loop at first, because the gain was too high. I added the gain and integrator params to the lock function. For example, with clf.lockLo(demod_phase = -10, prop = -10, integral = -8e2), I get the following TF using clf.loNA() (see screenshot). I can also check that the loop is not saturating by looking at the RP correction to the piezo and making sure that the PZT driver output does not saturate at ~107V.

I then look at the SR to see where the asqz/sqz is. To change the LO phase, I tune the demod_phase of clf.locLo(...). By carfully maximizing the OPO temperature and the LO phase, I managed to get up to 14 dB of asqz (see picture attached), but the SQZ level was still at about 2.5dB below shot noise (not shown here but an analysis will follow). There are two conclusions from this and a thing to test:

1/ The system seems to be loss dominated

2/ The current power budget seems enough to generate squeezing levels for our upcoming experiments. This does not mean that we should be satisfied with the power fluctuations.

3/ I did not try to lower the CLF power further but it could be that this is again a limiting factor on the amount of SQZ.

Next steps are to check 1 and 3 by optimizing the HD visibility and lower the CLF as much as possible, since so far all the loops involving the CLF seem fine.

Images attached to this report
Comments related to this report
jacques - 13:58, Wednesday 05 June 2024 (11666)

HD sqz/asqz plot from the data obtained yesterday. There is no peaks in the region 50 to 70 kHz, from which we can assess 14.05 dB aSQZ and 2.65dB SQZ.

Non-image files attached to this comment
LASTI General
Me - posted 13:00, Tuesday 04 June 2024 (11664)
Lasti chamber door and Lid removal procedure
This is a document that I've been working on to detail how to remove the Lasti chamber doors. It is a work in progress, and is neither self explanatory or complete.
Suggestions are welcome
Non-image files attached to this report
cSQZ General
jacques - posted 19:56, Monday 03 June 2024 (11663)
Input power drifts are coming from the first SHG mirror

I blocked the IR beam before the first SHG mirror and noticed that the power measured by PD13 is stable. I then unblocked the IR, with no loop locked, and the PD13 power fluctuated with the same characteristic timescales as what we had previously. I then carefully blocked the beam in the SHG cavity, after this input mirror and before the dichroic, and noticed that the power on PD13 kept fluctuating.

It is not clear to me why this is the case.

Heisenberg IFO General
Malo - posted 12:46, Sunday 02 June 2024 (11656)
Homodyne detectors spectra
I removed the AC path on Jacques' board (board J) and consequently replaced the R34 500 Ohm by a 50 Ohm to avoid losing a factor 10 of voltage due to the 50 Ohm resistor inherent to the Agilent. I then added the sockets to both Eric's (board E) and Jacques' boards, so that we can use two HQE photodiodes for the moment and interchange them between the boards.

I then characterized both boards by making their transfer functions and noise spectra. The 1kHz-50MHz data will be useful for our current use of the HDs whereas the 1kHz-500MHz data gives us a broader view of the HDs, in particular above 100MHz the transfer functions fluctuate a lot but the noise is relatively stable. Most importantly, the DC port transfer function are relatively stable and flat from 1kHz to a few MHz, in both amplitude and phase, and the averaged noise spectra are relatively stationary.
DC OUT, RF1 and RF2 are the different outputs of the board. In particular, the AC signal comes out of DC OUT since we disconnected the AC paths.

-Noise spectra : they were done without illumination of the photodiodes.

We observe a peak at 13.6MHz coming from some ambiant noise in the lab that could come from the ground. Indeed when I disconnect the boards from the Agilent and let the SMA cable touch the optical table, the peak appears; whereas when I isolate the end of the cable it disappears. Moreover, on my setting the board doesn’t touch the table, so it seems to be transmitted by the power supplier: only when the power supplier is turned on, the peak appears. This peak was also visible in the other lab, in NW17.
We also observe some broadband noise around 22MHz in both boards, that should come from the electronics in the boards.
The noise around 10MHz and 15MHz must be a consequence of the RF ports, and it should be verified further that it won't affect the squeezing measure.

-Transfer functions : the signals were first done with a modulated laser illumination on one of the PDs. A comparison between the illumination of PD1 and PD2 shows that they are roughly equivalent, therefore we don't mention which one was illuminated on the later graphs.

The valleys in DC OUT are consistent with the peaks in  both RF ports.
A comparison of board E and J show that the functions are relatively similar, with only little difference in the amplitudes and a small frequency shift in the RF resonances.
Non-image files attached to this report
cSQZ General
hudsonl - posted 19:54, Friday 31 May 2024 (11662)
Green Light Saturating SHG RFPD on Resonance
[Hudson, Jacques, Malo]

We observed that the compact squeezer's SHG PDH error signal leveled out at zero right at resonance when operating with high powers (see attached plot). We determined that this was due to green light produced on resonance leaking out through the input/output coupler and saturating the RFPD used for the SHG PDH lock. The error signal looked normal with the crystal adjusted away from the phase-matching temperature when no green light was produced. We fixed this problem by placing a 1064nm line filter in front of the RFPD to block the green light leaking out of the cavity (see attached plot for error signal with line filter in place). This seemed to substantially improve the intensity stability of the green beam produced by the SHG.
Images attached to this report
cSQZ General
hudsonl - posted 11:11, Friday 31 May 2024 (11661)
OPO Intensity Noise
[Hudson, Jacques]

We had observed excess intensity noise in the OPO pump beam and the NLG levels in the compact squeezer, which we believe originate primarily in polarization fluctuations in the single-mode fiber between the fiber bench with an EOM for the SHG's PDH lock and the fiber to free-space coupler on the compact squeezer board. 

We had a hypothesis that the OPO’s output became more unstable as the pump power was increased. We also noticed that the power seemed to be more stable after placing the VOA in the setup and tuning the SHG's feedback loop. To try to pin down the origin of the power instability, we measured the CLF power transmitted through the OPO when locked on dual resonance with the VOA in place, without the VOA but with the same pump and CLF power levels as with the VOA in place, and without the VOA with the maximum pump power level and the same CLF level as with the VOA in place. The result is that the measured CLF noise spectrum on the DCPD on OPO transmission (with respect to the CLF beam) was about the same in all instances [see attached figure]. This means that the noise on the CLF path does not seem to depend strongly on the pump power.

It also seems like spooling the fiber between the fiber bench and the fiber-coupler may have mitigated the polarization fluctuations. (Before the fiber was laid roughly in a straight line and was taped in several places). The polarization out of this fiber seemed much more stable than when it was lying flat and barely changed when tapping the fiber, in substantial contrast to its large response previously. It is unclear, but plausible, that increasing the bandwidth of the SHG cavity lock also helped limit intensity fluctuations.







Images attached to this report
cSQZ General
hudsonl - posted 19:59, Thursday 30 May 2024 (11660)
Compact Squeezer OPO Threshold
[Hudson, Jacques]

We measured a NLG of 6 for the compact squeezer's OPO with 55 mW of incident IR power on the SHG. This leads to about 25 mW of green power into the OPO (not measured today and estimated from past measurements). An NLG of 6 should occur for pump power at 71% of threshold, indicating that the OPO should reach threshold for about 78 mW of pump power into the SHG (neglecting further efficiency increases as the pump power is increased) or about 36 mW of green power (rough estimate since we did not measure the green power directly).

We should be able to reach threshold fairly easily my tuning up the mode matching between the SHG and OPO and optimizing the fiber components between the main laser and OPO using some new fiber parts which will arrive next week. 
GRAVITES Optics 1550nm
epolini - posted 05:49, Thursday 30 May 2024 (11659)
UMZI 1km NKT: measurements with NEW BOARD and moving stage

I replaced the new board in the UMZI 1km setup (always using the NKT laser). 

1. UMZI 1km with the plastic spool, without box

Fig.1 shows the OLTF of the loop while the stage is not moving. The UGF is lower than before (12kHz), but this was the best configuration to keep the loop locked while moving. 

Fig. 2 shows the error and correction signals acquired with the Moku:Go for the stage at rest and moving. The low frequency of the error signal has the same issue that needs to be fixed.

Fig.3 shows the time series acquired with the moku while the stage is moving and we notice that we don't have fringe wrapping anymore. This means that the change of the board was successful!

2. UMZI 1km with the vibration insensitive spool, with box

Fig. 4 shows the OLTF of the loop while the stage is not moving, with the new spool.

Fig. 5 compares the stationary data (stage at rest) acquired with the Moku and the SR785. In this case also the correction signal acquired with the Moku has a discrepancy with the data acquired with the SR785 below 700Hz. 

Fig. 6 adds the data while the stage is moving. The correction signal is higher while moving between 200Hz-2kHz. 

3. Comparison between cases with and without box

Fig. 7 compares the stationary cases with (SR785) and without box (Moku). It is evident that the situation with the box and the new servo reduces the correction signal between 70Hz - 3kHz.

Fig. 8 compares also the moving stage measurements with and withou box with the static ones.

Images attached to this report
GRAVITES Electronics
epolini - posted 03:51, Thursday 30 May 2024 (11658)
New Servo Board for UMZI : two integrators

[Eric, Eleonora]

Eric updated the servo board to suppress more noise below 5kHz. 

The old board had a 482Hz corner integrator and a 100kHz corner integrator, that we did not use since it was too high. 

Integrator 1:

Before - R15 = 10k, C8 = 33nF, PI corner = 482Hz

After - R15 = 10k, C8 = 5.6nF, PI corner ~ 3kHz

Integrator 2:

Before - R18 = 1k, C23 = 3.3nF, PI corner ~ 100kHz

After - R18 = 10k, C23 = 3.3nF, PI corner ~ 5kHz

cSQZ General
jacques - posted 18:28, Wednesday 29 May 2024 (11655)
Adding the VOA to the input path

I added a Thorlabs voltage-controlled optical attenuator V1000A between the Ubench and the pigtail. 

Since the VOA has max power handling of 100mW, I first reduced the input power on the Ubench to 10mW. Then, adter adding the VOA, I measured the input power on the Csqz board to be 4.7mW. Without the VOA, there is 6mW incident on the Csqz board. So the VOA adds at least 1 dB of extra power loss. 

Unfortunately, for some unknown reason, when I recabled the fibers, the coupling dropped to 3mW for 8 mW sent. I suspect that it is coming from the Ubench losing mode matching. The fibers tips seemed clean.

I then tested the VOA by sending some offset (in the RP, between 0 and -0.5V which means that the voltage arrigving on the VOA is between 0 and +5V). The VOA seemed to respond according to its nonlinear response curve found on thorlabs' website. a

I left the system with ~80mW at the input of the Ubench and 30mW incident on the cSQZ board. We shouldn't increase the input power further since this could risk damaging the VOA and the fibers before the Ubench..

GRAVITES Optics 1550nm
epolini - posted 16:44, Wednesday 29 May 2024 (11653)
UMZI 1km NKT: measurements with moving stage

I made some measurements with the UMZI 1km NKT with the Moku:Go to characterize the effect of the moving stage (the horizontal Fuyu on the bench) with and without isolation spool and box. 

Comparison SR785 and Moku:Go spectra - static measurement

First of all, I compared the spectrum of acquired with the SR785 with the spectrum computed from the time series acquired with the Moku:Go data logger.

Fig. 1 shows the error and correction signals taken with both instruments using the plastic spool without the box.

We have the following parameters (as in the entry #11650):

I acquired 30s of data with the Moku sampling at 200kHz. There is a discrepancy not yet understood in the low frequency region of the error signal. 

Measurements with moving stage

1. Plastic spool - without the box

I moved the stage with the spool on top with the following settings:

X Tar Pos = 60

X Tar Speed = 0.7

X Acc / Dec = 4 

With the same parameters written before, I performed the measurements with the plastic spool. The comparison between error and correction signals for the moving and static cases is shown in Fig. 2. We can see that the curves relative to the moving case are too flat for frequencies < 1kHz. Moreover there is a broad peak at 2-5kHz.

I tried to change the loop parameters: increasing the VCO FM dev and reducing the servo gain. I took a new set of of measurements, both static and with the moving stage with the following parameters:

The new data are shown in Fig. 3. The issue is not solved.

Eric suggested that there was a fringe wrapping problem in this case that was also evident from the time series, as shown in Fig. 4. The error signal has a slope and the correction signal has issues following it as shown by the flat regions. We are not losing lock but the loop is re-locking really fast in another fringe, introducing the weird feature shown in the err/corr spectra.

The solution to this issue would be to change the servo board in order to be more aggressive in the suppression of the 2-5kHz oscillation. To do so we need to add one integrator at 5kHz and move the integrator at 482Hz up to 3kHz.

2. New spool inside the isolation box

I performed the measurements also with the new spool inside the box:

Static parameters: 

Moving parameters:

Fig. 5 shows the comparison between the static and the moving cases. The vibration and acoustic isolation provided by the new spool and the box avoids the fringe wrapping, as it can be seen also from the time series shown in Fig. 6. We notice the increase in noise in the moving case, as expected. The main contribution to the excess of noise while moving is due to the patch cords connected to the moving spool that is free to move.

Images attached to this report
cSQZ General
Hudson Loughlin - posted 22:21, Thursday 27 July 2023 - last comment - 14:47, Saturday 08 June 2024(11272)
Installing Pyrpl
I installed the pyrpl package on a laptop at Fermilab along with the correct versions of other packages it needs. Since this is always much more of a pain than it seems like it should be, I figured I'd document my approach here to make life a bit easier the next time around. This time around, I ran the command "from pyrpl import Pyrpl", which will throw an error unless the packages are downloaded correctly. Following the steps below should streamline the process.

Here are some notes about how to go about this process:
1. Make a new anaconda environment running on python version 3.7 and install some package such as matplotlib. I'll assume this environment is called "RedPitaya"
     a. Note: The version needs to be python 3.7, pyrpl will not work with the latest version of python without some serious debugging
2. Navigate to the folder anaconda3/envs/RedPitaya/lib/python3.7/site-packages/ 
     a. Note: on a PC, the file path is anaconda3/envs/RedPitaya/lib/site-packages/
     b. Note: You may need to force your computer to show hidden folders to find these file paths
3. Download the pyrpl package from https://github.com/lneuhaus/pyrpl/tree/master
4. Paste the folder "pyrpl" from the github repo in step (3) into the folder from step (2)
5. Install the following packages into the conda environment RedPitaya: pyqtgraph, pandas, quamash, the current version of PyYAML, scipy, paramiko, scp
6. Open a jupyter notebook and run "from pyrpl import Pyrpl" If this works, or only throws an error message, the computer should be ready to interface with a Red Pitaya using pyrpl. If there's an error message, some package likely needs to be downloaded or needs a different version. Fix that and try again.
Comments related to this report
malo_lg - 14:47, Saturday 08 June 2024 (11671)
I tried this method and succeeded to connect to the RedPitaya and execute a few commands (shg.stop(), shg.scan()) but I could not lock the SHG: I obtained an error message related to the call of the function curve_async of classe Scope. Looking at the pyrpl files in more details, I found some comments about curve_async in file scope.py. Yet neither in class Scope, nor in the classes from which Scope inherited, was the function curve_async defined. 

So it seems that the current version of pyrpl (June 2024) is not perfectly suited to our use of the RedPitayas.

Another method worked instead: instead of step (3), Jacques sent me a copy of the pyrpl file from his computer. I could then go to step (4) and past this folder into the folder from step (2). Then I had to download a few more packages (pyqt, qtpy, jupyterlab, matplotlib) in my RedPitaya environment and it worked.
Displaying reports 561-580 of 1025.Go to page Start 25 26 27 28 29 30 31 32 33 End