cSQZ General
hudsonl - posted 19:02, Friday 23 August 2024 (11740)
CSQZ CLF to Pump Phase Loop with 9.2 MHz CLF
This loop locks with a 9.2 MHz detuned CLF with a 10 kHz UGF and 45 degrees of pahse margin. THe moglabs is set to frequency modulation on channel 1 with a gain of 10 kHz/V. There is 120 uW of CLF power incident on the OPO and the NLG is about 50, as in the previous log post. The measured transfer function is shown in the attahce image.
Images attached to this report
cSQZ General
hudsonl - posted 18:45, Friday 23 August 2024 (11739)
CSQZ NLG Optimization
I adjusted the compact squeezer's crystal temperature and position to optimize the NLG. Currently, we have a NLG of about 50 at an OPO oven temperature setpoint of T = 33.55 degrees celsius with about 22 mW of green power out of the SHG.
LASTI General
Morgane Zeoli - posted 17:34, Friday 23 August 2024 (11738)
23/08/2024 - HAM-ISI control update

Update on the work made on the HAM-ISI to troubleshoot why the loops are not closing properly.

Non-image files attached to this report
Heisenberg IFO General
hudsonl - posted 15:12, Friday 23 August 2024 (11736)
Red Pitaya Power Supply
It was pointed out to me by some Stemlab (Red Pitaya) engineers that red pitayas can be powered with a standard USB block and that many of these could be powered from a single wall outlet using a charging block with many usb ports. I bought two 24-port USB charging blocks and installed these in the Heisenberg interferometer setup along with a few dozen USB to micro USB cables. The red pitayas in the setup are now almost all powered from these two charging blocks, using only two wall outlets instead of a few dozen. This frees up the wall outlets for other devices.

Here are the 24-port USB charging blocks I used: https://www.amazon.com/24-Port-Charging-Organizer-Compatible-Smartphones/dp/B0CGRT5L7L/ref=asc_df_B0CGRT5L7L/?tag=hyprod-20&linkCode=df0&hvadid=693712892623&hvpos=&hvnetw=g&hvrand=18136505729991117286&hvpone=&hvptwo=&hvqmt=&hvdev=c&hvdvcmdl=&hvlocint=&hvlocphy=9002000&hvtargid=pla-2258566903349&psc=1&mcid=897d353920aa35518261c7150ed294b0&gad_source=1

And the 3 foot USB to micro USB cables I used: https://www.amazon.com/Smays-Micro-Cable-Black-12-Pack/dp/B01GKWE3E0/ref=sr_1_1_sspa?dib=eyJ2IjoiMSJ9.7lUP_cmnA3zI8NdHIRKQ0Q3_qAn4CTAmVhE37s2YK1LTfePRyqz2YFC0nRY9J38L08290QSTI0abtDYkVZ84m5yBLB_eZaGgAiMmnWuKFxwKyB5Y-laYIcGSXnqW71MHmBxkFC1d72FIeJ-RTTzxx3OFMaCZxwpw8CG60c7LVpR-y61mUIIKjM3TILybBl3_a_exfoaj9hfePpHoU2b_gAJy5iFG1GRYhswDazv4D5A.1Jr35X-ZoO28XsBgOxGF5kHyuI9-PlZMF5PDAoImKrg&dib_tag=se&keywords=Micro+Usb+Cable+3ft&qid=1724164271&sr=8-1-spons&sp_csd=d2lkZ2V0TmFtZT1zcF9hdGY&th=1
cSQZ General
hudsonl - posted 14:27, Friday 23 August 2024 - last comment - 16:40, Friday 23 August 2024(11735)
CSQZ OPO Locking
We recovered the OPO cavity lock using a modification of the breadboard OPO's locking procedure. I added a 60k resistor in series with the OPO cavity's mirror to create a low pass at about 5 Hz using this resistor and the 500 nF PZT capacitance. The locking script now continually tries to acquire lock with no integrator and a DC gain of about 1000. It then steps the mirror PZT voltage until it finds resonance, at which point it turns on an integrator with a 10 Hz corner frequency with the PID gain.

The feedback loop has a UGF of about 5 kHz and 90 degrees of phase margin (see attached plot). This is much better than previous implementations and suggests that the SHG should also be switched over to a higher resistance in series with the PZT capacitance to improve the loop performance.

The attached plot shows the OPO's transfer function measured with the red pitaya.
Images attached to this report
Comments related to this report
hudsonl - 16:40, Friday 23 August 2024 (11737)
Dual resonance is achieved for an OPO crystal temperature setpoint of 35 degrees celsius and a voltage of 32.5 V applied to the OPO mirror's piezo by the piezo driver. This corresponsd to 0.217 V out of the red pitaya which is amplified by 150x (10x by a general puropse 10x analog amplifier and 15x by the high-voltage piezo amplifier).
cSQZ General
hudsonl - posted 14:22, Thursday 22 August 2024 (11734)
SHG Locked In Squeezing Mode
SHG lock is back up and running. UGF is about 700 Hz and phase margin is about 40 degrees. This could probably be increased by more cleverly notching out the structural resonance at about 1.6 kHz.
Images attached to this report
Heisenberg IFO General
hudsonl - posted 11:49, Thursday 22 August 2024 (11733)
CSQZ Switched Back to Squeezing Mode
[Hudson, Jacques]

We switched the compact squeezer back to "squeezing mode" with high power on the SHG pump path and lower power on the CLF path. The power levels are currently as follows

SHG Pump: 75 mW out of fiber --> 64 mW incident on SHG after losses from PBS and 90/10 BS (note: there is 125 mW of opwer after the Faraday but only about 60% of this couples into the fiber connected to the free-space coupler. These fibers could probably be spliced to reduce losses here).

CLF port: 1.2 mW out of fiber with both AOMs driven at 100 MHz, 32 dBm

CSQZ Homodyne LO: Up to 5.2 mW out of fiber (can attenuate this with a VOA)

Squeeze angle control LO: up to 3.7 mW (can attenuate with a VOA)

See Masaya's post here for the full fiber schematic: https://emvogil-3.mit.edu/lasti/index.php?callRep=11722

While making the swap, Jacques and I also rearranged the physical location of some fibers to try to make the fiber path more clear by eye and keep all of the PLL fibers and signals in the same place. The monitor for the PLL was moved to the same scope as the other PLL signals and the high bandwidth PD used to monitor this signal was moved to the PLL optics board on top of the diabolo.
Heisenberg IFO General
hudsonl - posted 19:33, Tuesday 20 August 2024 (11732)
Homodyne Boxes
We ended up using plastic homodyne boxes for the high-bandwidth homodyne boards as the metalic boxes seemed to capacitively or inductively couple to the PCBs and cause noise issues. These were machined from these boxes: https://www.mouser.com/ProductDetail/546-1554QGY (Hammond Manufacturing part number 1554QGY)

The plastic boxes were not mechanically stable on 1 inch optics mounts, so I machined bases for them as well. With the aluminum bases, the PD enclosures are fairly stable.

These homodynes were permanently installed in the setup on Monday after debugging the broadband homodyne PCBs/photodiodes.

Attached images show the sketches of the broadband homodyne PCB enclosures and mount, which I used to machine these, as well as images of these homodynes installed in the setup.
Images attached to this report
Heisenberg IFO General
masaya - posted 19:15, Monday 19 August 2024 (11731)
Beam size of 2nd Homodyne is put back and small enough
[Jacques, Masaya]

As Jacques reported, the lenses to make the beam small at the photodiodes of 2nd Homodyne detector are not put on the correct location when we measured 6 dB squeezing.

Now, the situation is currently back and two beam sizes on the photodiodes are the same as before (180-190 um).

The attached pdf reads that the beam sizes were 160 um and 200 um diameter when the 6 dB squeezing was obtained.
The attached photos show the beam sizes and the optical setup for the measurement.

We put the Homodyne board and aligned the light to be incident on it. We successfully confirmed the intensity plateau.

Images attached to this report
Non-image files attached to this report
Heisenberg IFO General
jacques - posted 03:07, Monday 19 August 2024 (11730)
Second HD shot noise limited but lens issue resulting in no alignement plateau

After debugging the HD board on Masaya's side by using a correct pair of PD, I tried to check that it could be shot noise limited by sending some power on the LO side and looking at the spectrum of the DC out once the light is aligned on the two PDs.

I obtain the photo attached, on the Agilent. Red is the Agilent noise floor, White is the HD dark noise, Yellow is the shot noise spectrum with 0.333mW of LO power and no squeezing/antisqueezing. The plot goes up to 10MHz. This shows that the HD is indeed shot noise limited.

It is important to note that I was not able to find an intensity plateau using the lenses that Masaya had installed just before the HD. This means that the beams are not fully inside the active area of the PDs, thus they are clipping. This is consistent with a beam profile measurement where I measure a beam waist diameter of 600um (Gaussian fit) at the level of the HD PDs, which only have an active diameter of 500um.

Therefore one should change the lenses preceding the HD, so that the waist diameter is at most ~200um, to minimize clipping on the HD PDs and SQZ loss.

Images attached to this report
Electronics General
jacques - posted 23:43, Sunday 18 August 2024 (11729)
A 15MHz environmental peak in the electronics spectra

I noticed that there is a series of peaks very close to 15MHz which seem to come from the environment as the picture below shows: this screenshot is taken by simply plugging a SMA cable (2m long), connected to nothing on one side, and to the Agilent on the other. It as a high spectrum amplitude (-100dBm/Hz). This peak appears in the spectral density of the HD as well, but as discussed in the previous sentence, is not coming from the HD itself.

Therefore, in the future, we should be careful not to work exactly at 15MHz. 

Images attached to this report
Heisenberg IFO General
jacques - posted 22:02, Sunday 18 August 2024 (11728)
Debugged fast homodynes

Malo, Jacques

Yesterday evening we debugged the fast homodyne as Hudson, Eric and Masaya had trouble understanding why one of the PD paths was never responding to any incident light.

It turned out that the high quantum efficiency PDs which were used for the tests have their anode and cathode's pins positions different from the previously used high quantum efficiency PDs and the PCB board layout. This is easily tested simply by taking one of the PDs, hooking two of the three PD pins to a scope, send some light on the PD and see for which combination of pins the voltage read on the scope is positive (it's easy to get several 100s of mV using a simple lightbulb as the light source). 

We therefore swapped the pair of PDs which had a different pin layout, with another pair of high quantum efficiency PDs (same 500um active diamter and footprint as the original PDs on which the HD worked fine). Doing this allowed to solve all issues related to these HD and they are now fully functionnal again.

Conclusion: There are two batches of high QE PDs, which look exactly the same but have different pins layouts. In the future, before using an unknown PD, one should always verify that its pin layout is compatible with the layout of the corresponding electronics board. When in doubt, do the simple test of sending light on the PD and making sure which pin corresponds to which theoretical port of the PD.

RetroSense General
evanhall - posted 10:33, Friday 16 August 2024 (11727)
LED intensity noise measurements

LEDs were variously driven with a battery source or a current source. The battery source used 9 V or 3 V, with a wirewound resistor with −40 dB current noise (Vishay wirewound RN65 series). The goal was to drive the LEDs with about 30 mA of forward current. The current source was formed with an op-amp OP270 buffered by a JFET IFN5564, with the LED placed on the source side of the LED.

The photodiode was DT110L, which has an active diameter of about 1 cm, with a custom transimpedance + whitening amplifier. An ND1.0 filter was used to cut the emitted LED power so that the photocurrent was in the range of 50 µA.

Tom and Dan in the Adelaide group are also conducting LED intensity noise measurements.

Non-image files attached to this report
Heisenberg IFO General
hudsonl - posted 19:20, Thursday 15 August 2024 (11726)
PLL Power Supplies
[Jacques, Malo, Masaya, Hudson]

We were unable to close the PLL loop earlier this evening. After some fiddling around with the electronics, we realized this was due to the PLL relying on three different power supplies

(1) The +- 24 V power supply by the PLL setup powers mode of the PLL electronics
(2) The +18 V power suppl by the PLL setup powers the PLL's high voltage amplifier
(3) The compact squeezer's electronics box powers a 23 dB signal amplifier on the RF path from the RF PD to the PLL's input

The big takeaway is to make sure the compact squeezer's electronics box is powered in addition to the PLL's dedicated power supplies when trying to engage the PLL.
Heisenberg IFO General
masaya - posted 19:31, Wednesday 14 August 2024 (11725)
Beatnote signal of CLF from Breadboard OPO and LO beam for Squeezing Angle Control
Successfully obtained the beatnote signal for Squeezing Angle Control.

The CLF transimission power is 24 uW and LO power is 0.46 mW when the measurement was done.
The obtained peak at 3.1 MHz has -39 dBm and the noise floor is -82 dBm.
Images attached to this report
Non-image files attached to this report
SQZ General
eoelker - posted 21:38, Tuesday 13 August 2024 (11723)
Beckhoff back online

[Vicky, Eric]

We've been making steady progress the last several days getting the LASTI squeezer back online.  Today we tackled the Beckhoff.  Initially we were unable to get data from any of the beckhoff hardware channels.  SQZ 1, 2, and 3 were all failing to initialize properly in the TwinCAT system manager (were staying in INIT NO_COMMS state instead of going to OP state).  We were able to track this down to a couple of broken EtherCAT modules in the SQZ 1 and SQZ 2 chassis.  We replaced the broken module in SQZ 1 but will need to order additional spares to fix SQZ 2.  

We disabled the middle rail in SQZ 2 for now and bypassed the broken EtherCAT module in the chassis.  Once we did this, all of the remaining rails are now functioning properly and we are seeing the corresponding hardware channels in EPICS.  The middle rail in SQZ 2 controls the OPO common mode board, so we'll have to wait on recomissioning the OPO servo until I'm able to replace the broken EtherCAT module.

I placed an order for some spare modules on amazon, they should arrive in a couple of weeks

Heisenberg IFO General
Masaya - posted 18:31, Monday 12 August 2024 (11722)
PLL Moniter Install
As reported in https://emvogil-3.mit.edu/lasti/index.php?callRep=11719, the beatnote signal between 1064 light and 51 MHz shifted light could not tell us if PLL is locked at 0 MHz or 102 MHz.

To confirm it is correctly locked at 0 MHz, a PLL monitor PD is installed. Optics are fiber-based. Changes in setups are summarized below.

1. Appended 90/10 fiber BS after the CSQZ CLF port(4.71 mW). 90% side is for CLF(3.51 mW) and 10% pickoff is for PLL monitor(0.40 mW). CLF power decreased from 4.71 mW to 3.51 mW. This decrease should not be a problem because CLF power is mostly attenuated to avoid from contaminating shotnoise and squeezing observation.

2. Appended 70/30 fiber BS after the Diabolo PLL pickoff port(1.35 mW). 70% side is for PLL(0.70 mW) and 30% is for PLL monitor(0.29 mW).

3. Removed a fiber attenuator between PLL pickoff port and 1811 RFPD for PLL. This was attenuating the power from Diabolo side for PLL from 1.35 mW to 0.57 mW. As a result, PLL power from Diabolo side increased from 0.57 mW to 0.70 mW

4. To mix the two lights from each laser, 90/10 Coupler and PDA10A was installed. The signal when PLL is locked successfully is shown in the attached photo.

Setup details are available in attached PDF.
Images attached to this report
Non-image files attached to this report
SQZ General
eoelker - posted 17:08, Saturday 10 August 2024 (11721)
SHG Installed and aligned

[Vicky, Eric, Naoki]

We unpacked and installe SHG 2 from LHO (ics 13429) on the LASTI squeezing table yesterday.

A bit more info about the current status of this SHG can be found here:  78556 and 78686

This afternoon, I aligned the SHG and was able to see flashes almost immediately.  Currently, we're seeing about 8% of our power in a 2nd order mode, suggesting some mode mismatch between the SHG and the pump beam.  I think this is sufficient for now.  Vicky is going to help me with getting the controls and automation back online on Monday so we can lock the SHG.  

Images attached to this report
SQZ General
eoelker - posted 16:32, Friday 09 August 2024 - last comment - 21:43, Tuesday 13 August 2024(11720)
VOPO Tank pumpdown

The old VOPO/PSAMs tank that used to live in the green lab sustained some mild water damage along the top sealing surface during last year's flood.  A few months ago, I removed the corrosion with citranox and cleaned the oring while we were removing the PSAM components from the chamber.  This morning, I removed the remaining PSAM cabling, wiped down the inside of the chamber, and resealed the lid.  

I hooked up the micromirror pumping station to the chamber and am now pumping down to see if the lid is still able to hold a decent vacuum.  Right now we're at 9e-4 and dropping.  Its been a long time since I've used this chamber, so I don't recall what base pressure I was able to reach in the past, but if we get into the 10^-5's it is still servicible.  

The actual turbo for the chamber should have a higher pumping speed than this pump station given its long narrow bellows connection.  We need a computer connection to run that turbo again as well as a roughing pump.  Looks like someone walked off with the old scroll pump for that chamber.

If I had a computer set up in our cleanroom, I'd make a pumpdown curve, but alas...

Comments related to this report
eoelker - 21:43, Tuesday 13 August 2024 (11724)

This is now at 9e-6.  Given the modest pumping speed with the current setup, I think that this pressure level is consistant with there being no catastrophic new leaks in the lid.  I'll vent this shortly so we can install the breadboard and the green fiber feedthrough Rich and I removed from HAM X today.