Displaying reports 421-440 of 1025.Go to page Start 18 19 20 21 22 23 24 25 26 End
Reports until 18:38, Friday 15 November 2024
SQZ General
wenxuan - posted 18:38, Friday 15 November 2024 - last comment - 14:12, Monday 18 November 2024(11824)
LASTI VOPO red and green setup

Eric, Wen

We've received all the hardware and mounted the 4-inch breadboard to level the beam height to the viewports (thanks to Kellen's help!) This setup avoids any periscope. We installed pump TRANS/REFL camera & PD, CLF REFL camera & PD, and seed TRANS camera & PD on the breadboard. With these sensors, we get the pump and seed pretty-well aligned into the VOPO cavity. 

We then tried to lock the OPO loop. The demod PDH signal was too weak so we removed the 6dB attenuator of the 80-MHz injection to EOM. After that, we can see the signal pretty clearly on the scope. Locking with the current OPO servo board was not successful. We have to re-do some loopology as we did with SHG lock acquisition. 

Images attached to this report
Comments related to this report
Lisa - 14:12, Monday 18 November 2024 (11826)

I am attaching here the ICS record with the successful mirror gluing process, with screeshot of the procedure:

https://ics.ligo-la.caltech.edu/JIRA/browse/Bake-10201

Images attached to this comment
GRAVITES Electronics
eoelker - posted 19:02, Wednesday 06 November 2024 (11823)
Performance measurements for new fiber stretcher

[Dorotea, Eric]

We recieved our new fiber stretcher late last week.  On monday, we wound the stretcher with 6 turns of PM1550 fiber.  Hopefully using PM fiber will minimize cross talk between phase actuation and polarization.  Given the cylinder diameter (70 mm) this corresponds to about 1.5 meters worth of fiber and given the unloaded circumferential expansion (420 um for 150V applied) we were anticipating that we'd get about 2.4 mm of total strech.  However, when we hooked this up to our interferometer and counted fringes, we seem to be measuring closer to 0.9 mm, suggesting that either the blocking force of the piezo isnt high enough to produce the desired strech with 6 windings or that we didn't wind the spool tightly enough.  I think that this should be sufficient for our first round of experiments (where the fiber coils will be stationary), but subsequent measurements with the moving stage likely will require more range. 

This evening we roughly measured the actuators loaded resonance frequency and found it to be around 900 Hz.  This is probably high enough that we can get away with only one piezo actuator and forego the additional high speed actuator for now provided that we lower the crossover frequency between the Piezo and AOM to 50-100 Hz or so.  I will reconfigure the servo parameters tomorrow to give this a shot. 

One thing to note about this actuator: It has a relatively large PZT capacitance of ~4.5 uF.  Not surprising given how massive it is, but somehow this slipped our mind when we were first setting things up.  After observing some aggressive low-passing behavior, we measured the junction capacitance and discovered the cause.

 

Heisenberg IFO General
hudsonl - posted 18:38, Friday 01 November 2024 - last comment - 17:03, Wednesday 26 February 2025(11822)
Adapter Plate between Aerodiode AOMs and Newport EOM Four-Axis Mount
Attached is a sketch of the adapter plates I machined to place a free-space Aerodiode AOM on a four-axis Newport 9071 EOM mount. The plate should be 1/4 inches thick to place the center of the AOM 1.75 inches above the bottom of the mount. The counter-bore for the #8-32 through holes can likely be done with a counter-bore found in the machine shop. The counter-bore for the M2 through holes will likely need to be done with an end mill.

The only dimensions that need to be machined precisely are the relative distances between the four #8-32 holes and the distance between the two M2 holes.
Images attached to this report
Comments related to this report
hudsonl - 17:03, Wednesday 26 February 2025 (11901)
The clearance holes for the screw heads that attach the AOM to the adapter plate should be drilled 0.2" deep instead of 0.13" deep to allow more of the screws' threads to catch. With only 0.13" deep clearance holes, the AOM becomes loose on the mount over time, causing alignment drifts.
Heisenberg IFO General
hudsonl - posted 14:18, Friday 01 November 2024 (11821)
Notes on Free Space AOM Alignment
The optimal procedure for free space AOM alignment doesn't seem to be well-documented online, so I will outline some observations and techniques I found helpful in aligning AOMs.

Necessary equipment: AOM, four-axis EOM mount, adapter for AOM to four-axis mount, iris, large area PD or power meter.

(0) Unlike fiber AOMs, free space AOMs are not fixed to be up-shifted or down-shifted. Light scattered in the direction of the RF drive is up-shifted and light scattered in the opposite direction of the RF drive is down-shifted. All un-desired diffraction orders should be blocked with an iris.

(1) The AOM should be mounted on a four-axis EOM mount to allow its position and orientation to be easily adjusted with respect to the beam path. The beam should not be aligned to the AOM using steering mirrors other than to ensure the beam goes through the input window of the AOM.

(2) The AOM should be placed right at a beam waist. Much deviation from this position will cause the zeroth order and diffracted beams to look non-Gaussian when the AOM is driven. I found it helpful to use a beam profiler to find the exact beam waist and position the AOM.

(3) Once the AOM is placed in the correct position along the beam's trajectory (at a waist), send a RF drive to the AOM and adjust its orientation by hand to scatter light into the desired diffraction mode.

(4) Lock the AOM in place so its orientation can only be adjusted with the fine-threaded screws on the four-axis mount. Place an iris to block all diffraction modes but the desired one and place a power meter or large area PD after the iris. Fine-tune the alignment with the fine screws on the four-axis mount. 

If all went well, all diffracted beams out of the AOM should look Gaussian and the first-order diffraction mode should contain 70% or more of the optical power sent into the AOM. Aerodiode claims their AOMs can achieve up to 85% efficiency, but I have never been able to achieve more than about 75%.
Heisenberg IFO BOPO
hudsonl - posted 14:04, Friday 01 November 2024 (11820)
Mode Matching from Breadboard OPO AOMs to SHG
I mode matched the beam from the second of the two 532nm AOMs installed on the path between the breadboard OPO's SHG and OPO. The mode-matching has very little high-order mode content and we can send up to 96 mW of pump power to the SHG, which is plenty to pump the OPO to threshold. 

The attached plot shows the beam's mode after the AOMs and after installing the planned mode matching lenses. In the plot, z=0 is taken to be the screw hold on the optics table beneath the iris blocking the unwanted diffraction orders after the second 532nm AOM. The source beam (out of the AOM) has a waist radius of 133 um located 15 cm before the iris. The target beam has a waist radius of 306 um located 50 cm after the iris. (This second beam has a waist of 306 um located 20 cm before the edge of the breadboard OPO's breadboard. This target beam is taken to be that of the beam out of the 532 nm fiber when the breadboard OPO was pumped by fiber-coupled light. Matching to this beam instead of the OPO cavity mode later in the optics chain makes it easier to tune up the mode matching without adjusting the lenses downstream of the EOM in the setup.

All of the optics should now be set up to actuate the relative squeezing angles between the breadboard OPO and compact squeezer using only AOMs and no piezo phase shifters.
Images attached to this report
Heisenberg IFO BOPO
hudsonl - posted 19:29, Wednesday 30 October 2024 (11819)
532nm AOMs Installed
I installed the 532nm free space AOMs on the path between the Diabolo's SHG cavity and the breadboard OPO. The first AOM has 70% efficiency from the incident beam to the first down-shifter order, and the second AOM has 75% efficiency from the incident beam to the first up-shifter order. The optimal RF power for the down-shift AOM looks to be 31.0 dbm and the optimal RF power on the up-shifter AOM looks to be 32.0 dBm.

These measurements are in line with the expectation that we would achieve about 50% total efficiency through the pair of AOMs. We should still have plenty of green power to pump the breadboard OPO to threshold.
SQZ General
wenxuan - posted 16:31, Tuesday 29 October 2024 (11818)
Preliminary alignment of LASTI VOPO pump beam

Eric, Wen

We set up the temporary viewport for the transmission of green beam to do some preliminary alignment work before the hardware arrives for mounting the 4-in breadboard. The camera and PD for green TRANS were taken away from the large SQZ table.

The green fiber is now routed to the VOPO tank, along with other cables like OPO PZT. The throughput from the output of in-air fiber to the output of the in-vacuum fiber collimator is 20 mW/34 mW = 59%.

Upon the connection of pump fiber, we immediately saw the cavity flashes that were seen in the previous alog. With the help of the camera, we were able to align the pump to the cavity fairly quickly. The cavity scan shows decent TRANS peaks of a few FSR. We will continue optimizing green and start working on red alignment once we have the breadboard properly set up. 

Images attached to this report
Heisenberg IFO Relative Squeeze Angle Control
hudsonl - posted 16:58, Monday 28 October 2024 (11817)
Relative Squeeze Angle Control Loop Locked Using AOM and PZT
I locked the relative squeezing angle control loop by using an AOM to servo the LO phase to the breadboard OPO's CLF phase and the PZT on the compact squeezer's path into the interferometer to servo the relative phase between the compact squeezer's CLF and the breadboard OPO's CLF.

The AOM loop has a bandwidth that can easily be pushed to exceed 10 kHz, and the PZT loop has a bandwidth of about 1 kHz [see attached plots]. As anticipated from previous observations about the setup's end-to-end phase stability, the PZT ran out of range after about 10 minutes and the loop unlocked. To eliminate this problem, we will add a pair of 532nm AOMs between the breadboard OPO's SHG and OPO to shift its pump phase. This will allow us to do all of the phase actuation using AOMs and eliminate any residual problems with piezo actuators running out of range.

This loop could likely be further improved by adding a second RF amplifier prior to the red pitaya, and we plan to do this at the same time as we add the AOM pair.
Images attached to this report
SQZ General
wenxuan - posted 16:28, Friday 25 October 2024 (11816)
In-air sensors for LASTI VOPO

Eric, Wen

Now that the VOPO is sitting in the vacuum tank, we need to prepare for the in-air sensors for lock acquisition and characterization etc. The plan is to level up the 4-in thick breadboard at the same beam height as the center of the viewport. This would help avoid the periscope that introduces more optical losses and low-freq noise. We've purchased the 80/20 beam profiles to mount the breadboard. 

In the meantime, we will use the periscope from the large table to set up a temporary sensors for green trans beam, so we can get started on the cavity alignment. We moved the OPO 532 TRANS optics, etc. from the large table. We will start on VOPO alignment next. 

Images attached to this report
Heisenberg IFO PLL
hudsonl - posted 18:15, Wednesday 23 October 2024 - last comment - 18:31, Wednesday 23 October 2024(11814)
PLL Red Pitaya Died for the Second Time
Another red pitaya on the PLL seems to have died. This is indicated by its red "heartbeat" LED no longer flashing, and by the fact that it cannot be connected to. This red pitaya was hot to the touch, indicating that it may have over-heated. I added a new PLL red pitaya in the breadboard OPO's electronics box where it may have an easier time dissipating heat to the surrounding air. PLL red pitayas seem to last six months or so, so it does not seem worth too much effort to find and address the root cause of this problem, but we should keep some spare red pitayas on hand.
Comments related to this report
hudsonl - 18:31, Wednesday 23 October 2024 (11815)
The PLL successfully locks with the new red pitaya.
Heisenberg IFO General
hudsonl - posted 13:35, Wednesday 23 October 2024 (11813)
Pyrpl and Spyder Installed on Heisenberg Interferometer Experiment Desktop
Pyrpl and spyder are installed on the lab desktop in NW22 by the Heisenberg interferometer experiment. These can be loaded in from the anaconda environment 'Heisenberg' by running the command "conda activate heisenberg" from the anaconda command prompt. Spyder can then be launched by typing the command "spyder". I tested that I am able to connect to the red pitayas in the lab by scanning the compact squeezer's SHG using the lab desktop.

All red pitayas should now be connected to the lab desktop using a hard-wired ethernet cable connection. This should alleviate problems with the red pitayas getting kicked off of the MIT network due to inactivity, which forces us to restart the whole setup. The red pityas should no longer be connected to the MIT wifi network at all and the hostname should be "rp-XXXXXX" where XXXXXX is the last six digits of the red pitaya's MAC address.

The red pitayas were left connected to the somputer overnight and by the morning, their connection had dropped. According to this github thread, this problem can be solved by turning on the SCPI server on each red pitaya https://github.com/lneuhaus/pyrpl/issues/341 I found that when doing so, the connections to the red pitayas were still dropping in the initial configuration with several daisy-chained ethernet switches. I replaced these with a single 16-channel ethernet switch, and the connections now seem stable. 
SQZ General
eoelker - posted 21:20, Tuesday 22 October 2024 (11812)
VOPO breadboard installed in chamber

[Wen, Eric]

We put the VOPO breadboard in the tank this afternoon.  Cable and fiber feedthroughs were also installed and cable connections were tested.  Now we just need to install the parascope and we can start locking up the cavity.

Images attached to this report
Heisenberg IFO Relative Squeeze Angle Control
hudsonl - posted 17:16, Tuesday 22 October 2024 (11811)
Error signal and phase-lock loop for CSQZ to LO part of relative squeeze angle control loop
With the 1% pickoff in the Mach-Zehnder coupled with high efficiency (>90%) into a fiber, we now have very good SNR on the 9 MHz tone from the compact squeezer's OPO and onto the RFPD for the relative squeeze angle control. At 3 kHz resolution bandwidth, we have over 40 dB clearance between the 9 MHz signal and the RFPD's noise floor. This can be seen in the attached plot. The white trace is the RFPD's noise floor and the yellow trace is the RFPD's signal with the compact squeezer's OPO sent into the interferometer. The compact squeezer was operated with about 100 uW of light out of the CLF fiber on the compact squeezer board. This is the anticipated amount of light to be used in the eventual experiment and is low enough not to degrade measured squeezing levels. This SNR performance is far better than when we had tried to align the LO and CLF beams in free space after the 1% pickoff. 

Using an AOM on the MZI's LO path as the actuator, I closed the MZI LO to CSQZ CLF loop with a UGF of 10 kHz and 85 degrees of phase margin (see attached plot).
Images attached to this report
SQZ General
eoelker - posted 18:50, Monday 21 October 2024 (11810)
Squeezer Chamber moved to table

[Rich, Wen, Eric]

We moved the VOPO chamber onto the new optics table this afternoon.  We should be ready to start populating the chamber tomorrow!

Images attached to this report
cSQZ General
hudsonl - posted 11:03, Friday 18 October 2024 (11809)
New Compact Squeezer Fiber Path with AOMs. CLF Loop Locked with New Configuration.
[Hudson, Melissa]

We installed several new AOMs in the compact squeezer's fiber path, which will allow us to increase the bandwidth and dynamic range of the phase actuators on the compact squeezer's homodyne and on the interferometer's relative squeeze angle control. This reconfiguration also allowed us to remove the free space AOM from the PLL path and use a single downshift AOM on all paths. The new fiber configuration is shown below. It remains to be seen whether we will need a final AOM pair on the breadboard OPO's pump path to handle the low-frequency drift of the relative squeeze angle between the two OPOs.

With the new fiber configuration in place, we locked the compact squeezer's CLF loop, it can easily achieve a bandwidth of 10 kHz now that it uses a Marconi instead of a Moglabs, as the Marconi has a higher FM modulation bandwidth. The attached image shows the CLF loop's transfer function.
Images attached to this report
Non-image files attached to this report
Heisenberg IFO PLL
hudsonl - posted 10:57, Friday 18 October 2024 (11808)
PLL Frequency Moved to 100 MHz. Path is all fiber until RFPD
[Hudson, Melissa]

The PLL optical path is now entirely in fiber until the final 1611 RFPD, which is free space. I ordered a fiber-coupled 1611, which will allow us to convert this path to entirely fiber once it arrives. This has several advantages over the previous scheme, in particular, there is no longer any need to ever re-align the optics on the PLL and the fibers can be more easily moved around if needed to save space in certain areas on the table.

We verified that the PLL works in the new configuration by looking at the visibility between the beams out of the breadboard OPO and the compact squeezer on the interferometer's first beam splitter. We saw clear interference fringes and aligned the beams to 98% visibility.
cSQZ Future Improvements
hudsonl - posted 11:22, Thursday 17 October 2024 (11807)
CSQZ EOM for PDH Locking
When swapping from alignment to squeezing mode, the compact squeezer often has degraded alignment through the fiber bench containing the EOM for PDH locking. For instance, when we made this swap yesterday evening, there was about 36 mW of IR power out of the SHG pump fiber. After re-aligning the fiber bench, this was recovered to about 68 mW of power. 

In the future this path can likely be improved by swapping the fiber bench containing the thorlabs free space EOM with a fiber EOM. We have the rest of the parts needed to then convert the rest of this path to PM fiber: an AFW PM faraday isolator and a PM fiber coupler. This can be done, for instance, using a low insertion loss iXblue EOM, which has a modulation bandwidth of up to 300 MHz, a max input power of 300 mW, and an insertion loss of < 3 dB. See for instance: https://www.ixblue.com/north-america/photonics-space/phase-modulators/ Currently, we have 200 mW incident on the EOM, followed by a Faraday isolator with about 1.5 dB of expected loss. Assuming the worst-case scenario performance, we'd expect 3 dB loss through the EOM followed by 1.5 dB loss from the Faraday, resulting in about 70 mW of power out of the fiber, but eliminating the need for re-alignment. In the optimistic case, we would no longer need the Faraday isolator and would have about 3 dB or total loss, resulting in > 100 mW out of the fiber.

SQZ General
wenxuan - posted 16:14, Wednesday 16 October 2024 (11805)
Particle counts in LASTI SQZ cleanrooms

Eric, Wen

We did some housekeeping in preparation of putting the circular breadboard in the small cleanroom into the VOPO vacuum tank. We will continue our experimental work in the tank, which will take place in the large cleanroom so it better be as clean as the small cleanroom. We wiped all the surfaces that we could reach, including the curtains and all optical tables. The measured particle counts (0.3 micron and 0.5 micron) showed some improvements before/after cleaning.

 

Before cleaning:

Large cleanroom corners. South: 2/0; East: 26/2; West: 0/0; North: 5/0; Center: 8/2;

Small cleanroom: 2/0

 

After cleaning (we waited until the next day to let the dusts settle):

Large cleanroom corners. South: 2/0; East: 9/0; West: 0/0; North: 2/0; Center: 0/0;

Small cleanroom: 2/0

SQZ General
eoelker - posted 20:56, Tuesday 15 October 2024 (11806)
VOPO Breadboard Layout

[Wen, Eric]

Updated layout for the VOPO breadboard.  We'll probably add lenses on the output paths, but otherwise its pretty much ready.  

Images attached to this report
Displaying reports 421-440 of 1025.Go to page Start 18 19 20 21 22 23 24 25 26 End