Continuing the testing of the Teraxion 1550 nm laser in the Yellow Lab, I recorded time series from an asymmetric Michelson with arm length difference of 17.5 cm, which is an increase from the previous 10 cm. I modulated the laser with a triangle wave (Vpp = 1V/2V, f = 1 kHz), and the response is shown in the plots (two for each voltage). I pressed on the table between measurements which changed the interference pattern, and that is the reason for big differences between measurements with the same modulation. For a more quantitative estimation of linearity, I also modulated the laser with a sine wave (Vpp = 1V/2V, f = 1 kHz) and will fit this data to calculate the effective modulation depth in higher harmonics. The results will be posted soon. In addition, I measured the intensity noise, which appears to be mostly limited by the electronics noise of the photodetector (see the last plot)
Daniel, Wen
We have successfully observed the nonlinear gain in the LASTI VOPO cavity.
After aligning the green and red to the VOPO, we found the coresonance fairly quickly by adjusting OPO TEC. The initial NLG was found at read-back temperature of 22.00 C. We tuned up the temperature and saw another NLG at 27.50 C and maximal NLG at 31.00 C. Note that this temperature is different from Kentaro's old post, which reports 33.96 C. The NLG we saw was around 2.
The translation stage was fixed to work yesterday. However, we were not sure if the stage moved while we connectorize all the cables. The pump was very misaligned today when we tried to lock OPO. The reason might be the motion of the crystal and the loose connection between the pump fiber to the colimator (this need to be fixed once for all). Once the alignment was recovered, the coresonance was still lost until we moved the stage to find an operating position. The temperature that maximizes NLG was not 31.00 C at the new position.
We then tried to optimize the NLG with two DoF, the temperature and position. We noticed a heavy degeneracy between these two variables, making the optimization more difficult than we thought. We think the process would take longer time, so we stole the LO PZT cable to modulate the phase of the seed instead of plucking the seed fiber. We will do a more thorough 2D walking to find the optimal NLG for one crystal spot.
[Wen, Eric]
After some confusion, we managed to restore our old setup for controlling our VOPO crystal translation stage. A few notes to help us remember for the future:
The noise measured with the fiber interferometer mounted on the rotating arms on 2025-03-24, see plot. There is no discernible difference between the noise levels when the stage is powered versus not powered resting at 0 deg. Note the large acoustic noise coupling 100Hz to 10kHz, which may be concealing noise coupling in this region.
The attached plot also shows noise measurement done during rotation, which clearly shows acouastic coupling in the 100Hz-10kHz with jagged features. This experiment was repeated 4 times, with the system rotating 0 to 340 degrees and back, and the results seem quite consistent.
The second plot shows a second set of data taken on 2025-03-26 along with the data on 03-24. And the third plot shows the 03-26 data with SR785 dark noise. Low frequency side seems to be limited by this dark noise.
The last plot shows a comparison with previous data (March 13th and 14th data, log 11916), the acoustic noise coupling 100Hz to 10kHz doesn't look worse with the stage mounted configuration.
The next step is to fix the 1550 nm HD detector and get read-out.
Eric, Haocun, Wen
Following up on the 11830, we fixed the dichroic problems on the output of the squeezed vacuum. The problem is that both dichroics can individually give a factor of 50 (34 dB) of filtering of green while having low loss on red (< 1%). However, the filtering didn't really add up when put together. The problem is likely the AOI or polarization.
We used a power meter to measure the REFL of the 1st and 2nd in-chamber dichroics while adjusting the AOI of each optics. Given 5 mW of M1 REFL green, the 1st REFL was measured around 50 uW while the 2nd REFL was 10 uW. We then swapped the 1st and 2nd dichroic optics but still measured only a factor of 5 filtering on the 2nd dichoric. We swapped the order back given that the sequence didn't make any difference.
We then adjusted the 2nd dichroic optics by 90 deg in hope of improving the polarization. Then we saw 2 uW after 2nd, which was better than before. Haocun noticed that the power meter gave very inconsistent values with the internal ND filter on/off. We'll cross-calibrate it with another power meter.
We then switched to use a PD100A to measure the power. The red beam was blocked completely at the fiber input in addition to blocking the intracavity path. The 1st dichroic was measured with -27 mV with 8.2 V input and -71 mV dark offset, giving a filtering of around 45 dB (very good!). Then we measured -7 mV with 4.0 V input and -44 mV dark, giving 40 dB (a factor of 100) isolation. Now both dichroics are working as designed!
We still added an in-air 3rd dichoic to remove any of the DC pump light. We measured 77 mV before the dichroic and 65 mV transmitted. The filtered green was too small to measure, even with largest gain settting. We're pretty happy with the filtering, and we can now measure the NLG without extra pump landing on the TRANS PD.
I've come to the conclusion that at least part of the issue I was having in getting the polarization control working in the past week was some kind of coupling going on in the pm-pm polarizers. I've switched these out for PBSs with an SM input and PM outputs. While using the polarizers, I observed changes in the polarization state measured by a thorlabs polarimeter directly from the output of the polarizer when manipulating the polarization state entering the polarizer, meaning they were not effectively polarizing the light. This caused issues at two points: first, when combining the measurement and control wavelengths at the start of the test setup, it meant that it was not possible to ensure both wavelengths started in the same polarization state-- meaning that the changes to the polarization caused by the controller would most likely have been totally different. In this scenario, even if the polarization of the 1542 light was completely stabilized, the polarization of the 1550 light would not be stable. Second, since my control strategy is to minimize the light passing through a polarizer (ie, to drive the polarization of the light to be normal to the polarization axis of a polarizer), I was not getting a meaningful control signal.
The test setup is as follows: I have around 3mW of light coming in at either wavelength. Each passes through a set of polarization paddles, then the wavelengths are combined in a DWDM. The COM output of the DWDM passes through a SM-to-PM PBS. The fast axis output of the PBS enters a 1m SM fiber, passes through another set of paddles, then through the PCD-M02 polarization controller. The two wavelengths are then demuxed by a second DWDM. The 1542 output of the DWDM passes through a second SM-to-PM PBS. The rest of the setup is identical to the one I built in the fall at MIT: the slow axis output of the PBS is sent to a PD; the signal from the PD is split between a scope (for monitoring) and IN1 of a red pitaya. Note that the RP inputs don't like more than a volt when set to the low voltage mode. Always check the settings on the PDs and their TIA. IQ blocks are used to send a dither signal (currently set to about .1mV, 4kHz on OUT1 and 7kHz on OUT2). The demodulated signals are send to PID blocks, both of which currently use Kp = -1, Ki = -10. Finally, the output signals are sent through an amp circuit built by Tom (instead of the SR amp I used at MIT, but which performs the same operation of amplifying the RP output by a factor of ~2 and then adding 2.5V) and to the 1st and 2nd actuators on the PCD-M02 respectively.
To monitor how well the loop works initially, I disconnected the 1550 light and replaced the 2nd DWDM with a 50/50 beamsplitter, of which one output is sent to the 2nd PBS and the other is sent to a thorlabs PAX1000 polarimeter so that I can directly monitor the polarization. I've tested the loops by slowly changing the polarization entering the PCD-M02 using the polarization paddles directly before it. I observe that, while the loops are running, the magnitude of the control signal coming from the PD is approximately minimized and the polarization is mostly stable as viewed on the polarimeter-- if I move the paddles a bit faster it does drift a little bit, but quickly returns to the same place-- the loops are definitely not optimized yet. Depending on the input polarization, the loops aren't able to get the signal all the way to the same minimum; hopefully I can fix this by optimizing the integer gains but I'm not sure that's the issue.
The video attached shows the two feedback signals (in red and green on the LHS of the screen), the polarization state of the 1542 light as measured by the PAX1000 polarimeter, and (at the bottom RHS of the screen) the DC voltage signal on the PD as I move the polarization around. If the polarization is moved slowly, the state stays pretty stable; if it's moved suddenly the state jerks a bit and then goes back to about the same state.
After taking the attached video I switched to a much longer (222m) SM fiber spool; this doesn't change the behavior of the loop much. However, after turning the 1550 back on and looking at the 1550 output of the second DWDM on the polarimeter, it seems that the loop is only able to constrain the polarization to within about 1/8th of the polarization sphere, not to the same polarization. The loops are definitely able to stabilize it somewhat, especially when the disturbances to the polarization are small and/or slow, but it's not perfect. This isn't too surprising; it's looking probable that we're going to need to figure out a scheme that uses the 1550 visibility at the output of the IFO to feed back on instead.
I'll play with the integer values and take transfer functions of the loops in the near future but we should start seriously thinking about a new polarization control scheme for the moving iteration of the IFO; I'm hoping we can get away with this scheme for the stationary measurement.
[Hudson, Melissa] After fixing some software bugs, we have a clean demod sweep of the relative squeeze angle control demod phase and the homodyne demod phase. This indicates that all loops lock properly and are reasonably stable. Next, we will verify that we can make a similar scan using the breadboard OPO's homodyne detector. If that works, we will start taking initial measurements of the interferometer's phase.
We have populated all the fiber components of the interferometer onto two 8"x8" breadboards and mounted them around the pivot of the rotating stage (see attached photos). The rotation is reasonably smooth, and the interferometer stays locked during motion (see attached video). Some transient peaks were observed at the end of motion due to deceleration. As expected, the PZT drifts faster during rotation than when it's stationary, which brings up the need for temperature control in the next step. Haven’t seen issues from polarization changes so far, but we’ll add polarization control components going forward. I plan to test rotations beyond 90 degrees after tidying up and securing all fibers and cables better.
[Homodyne for 1550 nm] Eric and I tried to fix the issue of the homodyne detector for 1550 nm. One of the photodiodes on the board gave excessive noise when we touched or jiggled it. We replaced it with a new diode yesterday, but it appears that today the other diode is also failing to detect the signal light. We probably need to buy additional diodes to fix it.
The LASTI squeezer was recovered to the state before I left in last December. The misalignment into the SHG cavity was found and fixed. The fiber coupling was fine. Note that the SHG TEC was suddenly off overnight (March 14th) for unknown reasons. We'll keep an eye on it if it gets turned off again for some reason.
The green alignment to OPO was recovered. We measured 36.0 uW transmission after M2 when on resonance and 27.2 uW on the in-air TRANS PD, given 3.2 mW of input to M1 (sideband + HOM). The peak power on TRANS PD is 145 mV for main 00 resonance, but I do see another resonance giving 54 mV peak in one FSR. This secondary resonance also has a 00 mode shape on camera. We will tune the input waveplate to see if we can remove the secondary 00.
In the previous post, I saw another beam spot on M1 that's as bright as the circulating beam. I tried to find the ghost beam but didn't find any. This may be the reflection from the AR-coated wedge surface. I'll leave it as it is. The laser card was accidentally dropped into the gap between the breadboard and the chamber. I think it's easiest to retrieve it by lifting up the breadboard again. We'll probably do it near the end of the installation, just in case if there's anything else slipped into the gap.
We've lifted up the VOPO breadboard today and picked up all the things dropped in the gap - one laser card and one optics.
I moved RetroSense v3 to the Yellow Lab and immediately saw an improvement in noise. The figure shows that we are now at or below the eBOSEM level at some frequencies and approaching shot noise. I also separately compared noise for two versions of the electronics setup, with and without demodulation, and it is very similar. With this, we are now performing similarly or better than v2 with having just the retroreflector, LED + QPD, and preamp, but no demodulation board. I measured this with the gain of 100 on SR560 to suppress the spectrum analyzer noise and making sure the QPD + LED are at the lens's focal length (12 mm). Having low photocurrent has been an issue in previous measurements, but today I noticed that loosening some of the screws in the optical head mount increases the photocurrent, and was able to increase it from <100 uA to 561 uA this way. This suggests a connection problem, and one of the LED connections was probably accidentally connected to ground. As a result, having a more mechanically robust optical head with standard connectors in place of hand-soldered wires would be the next improvement. dV/dx = 66.4 V/mm V_sum = 14.3 V I_sum = 561 uA Shot noise = 8.22 pm/rtHz
Eric, Lisa with Slawek and Peter
The OPO is formed by 4 mirrors, two flat ones (M1 and M2, with different coatings E2000155-v3) and two curved ones (M3 and M4, with the same coating E1600051-v2). M2 and M4 have a piezo for length control.
We had two spares of each mirror, enough to make to build two full spare cavities. Both two M1 and M2 mirrors, plus one M3 and one M4, were glued to their block by Fabrice long ago (so a total of 6 assembled optics) . Two curved mirrors were yet to be glued to their block when we started.
Here is the current status:
Plan:
[Begum, Haocun, Eric]
On March 13th, we first measured noise for the 1km arm length interferometer, then we replaced the arms with the 27 km vibration insensitive spools and measured noise again, see attached comparison plot. After seeing the big lump of noise 100 Hz to 1 kHz, we decided to close up the box Eric built around the setup. As seen in the figure, this squashed the 100 Hz to 1kHz (apparently) acoustic noise! Of course, a more clear comparison is with traces of the same range on the SR785 and the same arm length: here.
We also measured dark noise for the photo detector, SR785 and the PZT mon (remember the unusually low PZT-VCO crossover frequency and the weird resonances). PZT calibration is 10V/mm * 1.545/(2pi*1.4441)e-6 m/rad. The noise budget is attached, <800 Hz seems to be determined mostly by the SR785 noise floor, while >10kHz is consistent with the PD noise floor. The PZT MON needs to be further calibrated with the actuator transfer function.
The next day, in the late afternoon, we measured the noise of the system again, this time down to 0.1 Hz. Again, a comparison plot with the same range for the March 13th and March 14th data is attached, where the noise >1kHz seems slightly elevated. This could be real and possibly due to lack of temperature control, or it could be a calibration issue, since the fringe Vpp showed variation during measurement taking campaign on March 14th. We had to keep increasing the input 1545 nm power to try to keep the HD locked and eventually, we lost the ability to lock and had to stop before completing the noise budget. After this, we decided that we have already seen the magic of the box with the acoustic noise suppression and opened it back up. The air was slightly warmer to hand just above the AOMs on the interferometer side of the table. After attempting to lock again, we saw the PZT mon drifting down and railing at the low V limit, unlike the previous days. This supports the idea that if we have a greater PZT strecher range and/or temperature control, we should be able to eliminate this drift and/or the subsequent unlocking of HD which limits the data acquisition time.
The fiber spools are now mounted on the moving stage. The next step is to move the other interferometer components onto the moving stage and start rotating!
Some other notes from this week:
- The SM splices on both ends of the 27 km spools were predicted to be <0.01 dB loss (by the splicer). We confirmed the loss to be immeasurably small on one of the four splices. The throughput losses from Spool 1 and Spool 2 are measured to be 5.2 dB and 5.15 dB. Assuming 0.1 dB insertion loss between the fiber connectors in the fiber sleeve, this is consistent with ~0.188 dB/km loss, which is pretty close to the quoted 0.18 dB/km loss by the manufacturer. (0.18 dB/km*27 km = 4.86 dB loss, 0.4 dB loss insertion loss is also nothing too crazy.)
- The 1550 nm HD board has an issue. Although the input signals to the PDs are about the same (~100 nW per PD), the 1550 nm HD detector shows 50 times smaller Vpp, and its Vavg is nonzero, see attached plot for fringes on both 1550 nm (purple) and 1545 nm (yellow) HD detectors. We confirmed it is the board and not the fibers (WDM and/or BS), by switching the input fibers to 1545 nm and still observing the same issue.
- SR785 data acquisiton has some quirks. Dorotea figured out that the code doesn't work if is run from the Spyder cmd, but it works from the system cmd. The other issue, which Jesper pointed out, is the EOD needs to be set to LF from the GPIB Connection interface. The end of string character needing to be "\n" is a known issue in Prologix GPIB adapters. After these hurdles, I opted to Eric's data acquisiton code since it sets the SR785 settings correctly. The other code works also, but the setting file needs to be updated.
- The splicer currently automatically splices after estimating fiber end angles without asking for authorization for the SM splice recipe. I reduced the threshold angle to <0.8° for now, but usually for good splices <0.5° is a better choice. This also means we would need to spend some time on optimizing the blade height on the cleaver or simply cleave until we get a good angle.
[Begum, Haocun]
The 27 km vibration-insensitive spools have been successfully assembled onto the rotational stage, which is functioning properly! Video here with pics attached.
[Begum, Haocun]
This is a summary of work done over the week of March 3-7. Apologies for the late alog.
We first started working on the PZT polarization mixing issue. All of the fiber components before the PZT, and the fiber that is wound around the PZT are (panda) PM. So we reasoned that it is unlikely for the epoxy to create enough tension/twist on the PM fiber to cause it to actively couple light between the two polarization axes. This pointed us to the splice point between the fiber patchcord and the bare fiber that is wound around the pzt. Using the end facet imaging alignment function of the PM splicer (Fujikura FSM-100P+) (see attached photo for the end facets), got ~20 dB PER at the output of the PZT fiber. The splicer also allows for hand alignment, so we can fine tune with this later on, if needed.
Then we measured the modulation on the homodyne fringing to see if the polarization effect is still there, see attached oscilloscope screenshot. The 10% fluctuation is consistent with the 20 dB PER (see closeup). Consequently, the UGF of the common loop transfer function is fluctuating around 55 kHz, see this link to a video of the transfer function measurement. It doesn't look too severe, unlike the last time we tried this measurement, where the UGF was swinging by 10s of Hz. We also measured the frequency response of the slow loop, which shows a cross-over frequency of around 35 Hz with a very strong resonance peak just above 20 Hz (attached plot). See the attached oscilloscope screen, showing the homodyne signal with the yellow trace and the PZT monitor with the blue trace. The screen is recorded right after the TF goes through the resonance and the homodyne loses lock. Also, notice the drift of the PZT mon after it is locked again. This drift is unidirectional until the PZT runs out of range and the homodyne unlocks and relocks again, at which point it jumps to a lower voltage then proceeds to drift to larger values again. This limits the amount of time we can take uninterrupted data to a few minutes right now. In the future, we will add more windings to the PZT to increase the available range.
I moved the PZT mirror phase actuator from the CSQZ path to the BOPO's path such that both the high and low frequency phase actuators (AOMs and PZT) to keep the BOPO phase in sync with the squeeze angle control LO's phase are on the same optical path. The previous configuration locked the LO to the CSQZ CLF phase, and then used a PZT mirror on the CSQZ path plus an AOM pair on the BOPO pump phase path to attempt to keep the BOPO's CLF phase in sync with the LO's. Some loop algebra indicates that this configuration should have been unstable, which may be responsible for the observed 30 Hz rail-to-rail oscillation. I also placed a lens in an xy-translation mount prior to PD B on the differential receiver for MZI locking. This allows us to adjust the 99/1 beam splitter's angle while keeping the beam centered on this PD. After making this switch, I re-aligned the OPO beams to each other (96% mode matched), re-aligned the MZI (98.6% mode matched), balanced the power levels on the MZI differential receiver (balanced to within 0.1%), and mode matched the beams to the compact squeezer's homodyne (99% mode matching from the BOPO beam to the CSQZ homodyne and ~90% for the CSQZ beam). This mode matching should be fine to assess the stability of the relative squeeze angle control and MZI with the various improvements over the last few weeks. However, before taking final data, we will likely want to adjust the position of the lenses on the CSQZ path before the MZI in order to optimize the mode matching between the CSQZ and BOPO's OPO cavities. The attached picture shows the current optics configuration with the PZT mirror moved to the BOPO path and the XY lens mount in before PD B.
I had noticed that there was some coupling from light in the MZI squeeze angle control LO and the CSQZ CLF (even with the OPO unlocked) to the CSQZ's homodyne after passing through the interferometer. The coupling to the squeeze angle control LO was mitigated by adding a fiber Faraday isolator in the fiber path between the free space to fiber coupler for the 1% pickoff and the 90/10 beam splitter where the pick off beam is mixed with a LO beam of several mW. The 9 MHz CLF beam appears to effect the homodyne's DC signal somewhat, although this is reduced along with CLF power, as expected. The origin of this coupling is likely the same mechanism that always limits CLF power, and I suspect that it will not limit squeezing levels as long as the CLF power is at or below the level used to measure large levels of squeezing on the homodyne without first passing through the interferometer.
To lock the MZI, we pick off 1% of the light from each output port and place these beams on a differential receiver. In alignment mode, with high power through the MZI, sweeping the MZI length resulted in a nice sinusoidal signal on the differential receiver's output. However, when we switched to low-power squeezing operation, the signal would sometimes look very distorted. It turns out this distortion comes from LO light from the compact squeezer's homodyne reflecting off of the right-hand homodyne diode, back through the interferometer, off of the OPO's input/output mirror, back through the interferometer, and to the differential receiver. I believe this can be fixed by adjusting the AOI of the beam on this diode.
When David Yeaton-Massey used these lasers at Caltech he found an actuation coefficient of 30 MHz / mA and 5% RIN / mA.
[Eric, Begum]
Eric had prepared two homodyne boards for the 1550 nm and 1545 nm paths. Last week, we wired them up and measured the dark noise. One of the boards had a reasonable noise level, see attached plot, whereas the other had elevated noise at low frequencies. So Eric replaced a resistor he suspected, and the noise became comparable to the other detector, see attached plot.
We locked the 1545 nm path of the interferometer, using the pzt strecher and feeding back to the VCO. One observation we had is the vaccum pump creating very fast fringe wrapping on the homodyne detector. (This is confirmed to be the cause since we turned it off for a short while and the fringe wrapping became much calmer.) The other observation is about the PZT strecther. It seems to affect the polarization state through the fiber, and hence the intensity of the fringes as well as the UGF. Eric mentioned he used epoxy to fix the the fiber on the pzt stretcher and we suspect this may be affecting the polarization while stretching. We will rewind the fiber on the strecher using double sided tape (like Haocun did in Vienna), and add more windings for larger range in length tuning. Ultimately we may need to set up active polarization control, but for now we will se what we can do with a rewound pzt strecther.
The pump was tuned back on afterwards.
Yesterday, the picoscope channel reading the breadboard OPO's DC differential channel contained a lot of excess ADC noise, and the recorder spectral shape of shot noise was not flat (see attached plot for Feb 28). This was resolved by closing the connection to the picoscope with the python command myPico_inst.close_scope(), unplugging the picoscope from power (a hard reboot), reconnecting the picoscope's power cable, and reconnecting to the picoscope with python. The same procedure should be followed in the future if the data recorded by the picoscope looks odd. We also note that between the data taken on Feb 28th and March 1st, the BOPO homodyne's LO power level was increased from about 200 uW to 2 mW by swapping the outputs of a 90/10 beam splitter that were previously plugged into the wrong ports.
This can also be fixed by closing and re-opening the connection to the picoscope in python instead of unplugging it.