[Jaime, Eric]
We put some optics on the VOPO test setup today to build a front seed path. Just need to set up a 1064 trans port on Monday and align. Jaime will use this path to measure the escape efficiency of the spare VOPO I built for LHO.
Mode matching: One lens w roc=150 mm was placed a distance of 5.76" from the edge of the VOPO box. This was based on a measurement of the collimator output that Jaime made last Friday.
[Evan, Swadha]
Cavity is locked in s polarization in the vacuum tank setup with NPRO laser input.
We measured the noise spectrum of the control signal, and used the PZT transfer function 5.14 MHz/V to calibrate it into freerunning noise. We see that we are currently limited by the frequency noise of the NPRO, as shown in the plot.
We also took scope data around the TEM00 mode by driving the PZT, and inferred the cavity finesse to be 1200, as shown in this plot. We see that the (0,22) mode stays irrespective of modematching, and thus believe it is internally generated.
Cavity data:
link to ligo gitlab repo: https://git.ligo.org/nikhil-mukund/dtt-diag-tools
Rich has pointed out to me that it is sometimes challenging to catch C-6D once it goes out of range, for example, after ISI trips. This log clarifies the problem and discusses a few new automation scripts that may simplify the C-6D catching procedure. Why does the problem exist? This is because the equilibrium position of the C-6D inertial mass is not the same as that defined by the sensors. There may be offsets in RX, RY, or RZ. In our case, RX and RY offsets are small (because Rich & I balanced the mass with magnetobullets as reported in log 11906). However, we have a significant RZ offset that still stays there after the C-6D installation (log 11846). Therefore, after the disturbance occurs and C-6D catching servos go out of range (or LPS signals become unreliable), the mass tends to move in RZ. Control scripts: (Note that the scripts are written in Python using the 'ezca' library that seems to work fine now. Not sure whether it is still supported.) ! TO BOSEM command. This one should be ideally pressed immediately after ISI is tripped. If the transient is not large, the C-6D local servos can catch the inertial mass. This is the best case scenario. Below, I also outline other cases. BOSEM RZ is in range (may even fluctuate around in the range 100 - 500 um) but RX, RY fluctuate quite a bit and do not seem to stabilise to their equilibrium position of RX = RY = 0 um. This happens if C-6D got a significant kick in tilt during the transient and the V1-3 BOSEM actuators are too weak to cool the mass. As a result, the control loop because nonlinear due to saturating actuators and the mass does not stabilise. In this case, it is important to run the following command: ! RX / RY damp. This one only damps RX / RY and does not try to catch it (no DC force). The scripts are engaged with a low gain of -0.3 in CATCH_RX and CATCH_RY servos to avoid the actuator saturation. This corresponds to the Q-factor of RX/RY modes of around 10 and it would still take a bit of time to measure 60 - 110 sec period modes. However, since the mass oscillations became smaller over time and C-6D BOSEM V1-3 signals also reduce, it is beneficial to increase the gain to -1. Once the control signals are further reduced, it is possible to increase the gain to -3. The RX/RY modes would damp 'quickly' then. Quickly means on the C-6D scales: ~2-3 min. Once RX, RY oscillations are damped down to the pk-pk values of around 30-50 um, it is feasible to engage the RX/RY catching servos again. ! RX / RY catch engages the catching servos again. There might also be a case when the RZ kick was large from the external disturbance and ISI loses balance in RZ. When this happens, RZ signal will get stuck at -620 um or so and all BOSEM flags, including vertical ones, become open. Once this happens, it is also important to run RX / RY damp script even if RX and RY were caught because vertical BOSEM signals become unreliable in this state. Once RZ comes back to the linear regime, it is possible to run the RX / RY catch command to bring RX and RY back to the nominal position. RZ offset trick: though it is not necessary, it may reduce the RZ catching time. Once RZ loses balance and moves to its equilibrium position, it hits mechanical stops a few mm away from its nominal position. This longitudinal offset is sufficient to significantly weaken the actuator strength and it may take some time for the feedback servo to ramp its control signal and pull the mass back to its operational point. One may speed up the process by manually tuning on the offset in the C-6D COIL H1 filter bank. The offset is typically negative and should be turned off immediately after the mass starts to move, even by a small amount (0.1-0.2 um in RZ). This is because of the large inertial of the system. If the offset is held for too long, the mass will fly over the equilibrium position, bounce the mechanical stop on the other side and then bounce back to where we started (RZ of around -620 um). Once the mass is caught again and you like to stabilise ISI with C-6D in loop, it is possible to run the following commands: ! RESET LPS command: I would only run it when BOSEM RX = RY = 0 (up to 1-2 um) and RZ = -300 um (up to 1-2 um). This command resets LPS V1-3 and H1-3 and clears history in C-6D feedforward and RX/RY matching filters. ! TO LPS command: transitions C-6D from the BOSEM control state to the LPS control state (log 11961). There might be a transient and the C-6D may move a bit but this one is typically small. It might be large when C-6D is still large from its equilibrium (more than a few um in RX, RY, RZ). At this point, C-6D is ready for the ISI stabilisation. Note that the scripts do not clear history in the slow blends. This should be done manually if needed.
Wen, Daniel
Today we finished a few of the last steps in assembling the optics on the LASTI SQZ table. In summary, we found a few modifications to our previous setup that assisted in alignment of the homodyne detector and were able to observe high visiblity on the homodyne, as well as some preliminary NLG via the 2f signal on the CLF reflection PD.
Seed PDH Loop
Instead of relying on the green PDH loop to stabilize the cavity near a seed resonance, we thought it might actually be pretty quick to set up a rough PDH loop to lock the cavity to the seed beam instead - the main idea being that the stability of the measurements we make of the mode overlap during alignment could be better by locking to the seed. While Wen worked on repairing some broken solder joints on the TEC in the OPO, I quickly threw a broadband EO phase modulator in the seed path on the main laser table. With some careful placement, this did not degrade the mode matching significantly. To quickly attain an error signal for the PDH loop, I used 19 MHz as the dither frequency which makes it possible to borrow the OPO CLF reflection PD signal as an error signal for the demodulator. For the demodulator, we hijacked the OPO green PDH demodulator and routed a 19-MHz LO to generate the error signal which was also fed back through the green OPO CMB. Doing this yielded a fairly stable lock that ensured the mode we were aligning to the homodyne was indeed the seed TEM00 mode.
Homodyne SQZ/LO Mode Matching and Initial Visibility
Using the Phasics camera that Hudson lent us, we were able to quickly match the SQZ beam parameters to those of the LO beam on the PDs in real time. A precise calculation of the expected mode overlap will be posted here later, but for now, we estimate based on a rough calculation that the mode overlap should be >99%. After confirming this, we went ahead and tried to align the SQZ beam to the LO beam which had already been aligned and balanced on the homodyne. To observe the visibility, we detuned the LO by 500 Hz from the seed and let the fringes run at that frequency on the photodetectors. A capture of the individual PD channels here (yellow - PD1, blue - PD2), as well as the difference channel (purple) shows a respectably high visiblity right off the bat. Based on the min/max measurements computed by the scope, our rough visiblities on PD1 and PD2 at this time are ~97.3% and ~96.1% respectively. We expect that with some more carfeul alignment we may be able to improve these even more.
NLG Observation via CLF
After all of this alignment, we started resurrecting the phase-locking loops for the stabilization of our LO at the homodyne. We started with optimizing the CLF PD alignment and tuning the OPO crystal's temperature/wedge displacement to achieve rough phase matching and co-resonance. At this point, phase dithering and injecting the seed beam into the back of the OPO allowed us to observe NLG in the phase-sensitivity of the seed transmission (yellow). Following this, we replaced the seed signal with our CLF signal detuned from the seed by +9MHz and checked the output of the CLF PD on a spectrum analyzer. Here, we can see that we are indeed generating an idler beam 9 MHz below the seed and therefore generating the necessary ~18 MHz carrier needed for phase locking the pump to the seed. The frequency error here is likely due to a failure in one of our SG382 sig gens which is preventing the PLL from locking. Next, we will have to re-establish the phase-locking electronics to really see squeezing.
Rich and I had a peculiar discussion about the precision of the T240's transformation from its Galperin configuration to XYZ. While I think it is straightforward to diagonalise Z with a sub-percent precision (because it should not see any ground tilt), it might be harder to achieve clean X and Y signals. In log 11851, I witnessed a larger T240 signal compared to GS-13 and C-6D at microseism and became suspicious that T240's Z->X coupling is around 5%. Since it might have been only a miscalibration at that time, I have tested T240's Z -> X coupling by stabilising ISI with GS-13 in Z (without sensor correction). All other degrees of freedom were stabilised with C-6D (with sensor correction for X and Y). In this configuration, we have a significant ISI motion in Z around microseism (limited by the ground motion) but smaller motion in horizontal degrees of freedom. The attached figure shows the result. It turns out that the T240's transformation is better than I expected before, and Z -> X coupling is smaller than 1 / 250: orange vs red at 250 mHz. The coupling is likely even smaller because it seems that T240 sits on some noise: either on its own noise or on the C-6D's laser frequency noise (since we do not run LPS frequency stabilisation servo).
I changed the IR LED in RetroSense from SFH 4851 to Hamamatsu L11913, which was supposed to have lower intensity noise. However, there does not seem to be any improvement in measured noise (see figure) aside from the diagonal channel. There also appears to be a noticeable increase in the x-channel noise at low frequencies, which might be of environmental origin.
[Melissa, Jasper]
| waveguide | taper width (nm) | transmitted power (uW) | comment | waveguide | taper width (nm) | transmitted power (uW) | comment |
|---|---|---|---|---|---|---|---|
| field 1 | field 2 | ||||||
| 0TS | 250 | 945 | 0TS | 250 | 370 | ||
| 1TS | 275 | 820 | 1TS | 275 | 1370 | ||
| 2TS | 300 | 100, 315 | potentially defective, debris visible on microscope; remeasured to confirm | 2TS | 300 | 1800 | |
| 3TS | 325 | 1830 | 3TS | 325 | 1200, 1200 | remeasured to confirm | |
| 4TS | 350 | 1000 | 4TS | 350 | 760 | ||
| 5TS | 375 | 740 | 5TS | 375 | 885 | ||
| 6TS | 400 | 555 | 6TS | 400 | 810 | ||
| 7TS | 425 | 548 | 7TS | 425 | 470 | ||
| 8TS | 450 | 520 | 8TS | 450 | 525 | ||
| 9TS | 475 | 325 | 9TS | 475 | 520 | ||
| 10TS | 500 | 382 | 10TS | 500 | 465 | ||
| 11TS | 525 | / | broken, hole in chip | 11TS | 525 | 400 | |
| 12TS | 550 | 300 | 12TS | 550 | 420 | ||
| 13TS | 575 | 315 | 13TS | 575 | 285 | ||
| 14TS | 600 | 360 | 14TS | 600 | 380 | ||
| 15TS | 625 | 238 | 15TS | 625 | 308 | ||
| 16TS | 650 | 242 | 16TS | 650 | 297 | ||
| 17TS | 675 | 330 | 17TS | 675 | 260 | ||
| 18TS | 700 | 325 | 18TS | 700 | 309 | ||
| 19TS | 725 | 260 | 19TS | 725 | 250 |
Eric, Danial, Wen
The VOPO chamber's viewport for the SQZ beam to go through is replaced by one with AR coating. The old one was lossy. We measured 50.5 +- 0.5 uW before the viewport and 48.0 +- 0.5uW after. The background is around 0.5 uW. There's around 40 uW in the 48 uW transmitted power that is seed, while the rest is green. Therefore, the efficiency is 94%-96%.
Eric installed the new one (AR-coated) last morning. The difference of the power measured before and after the viewport is less than the uncertainties of each measurement (~1 uW), suggesting the loss of the new viewport is much less than the old one.
This evening I set up the seed field injection through the rear of M2 for the H1 Spare VOPO. Added another camera and PD in transmission on an auxiliary breadboard. Things are aligned now. Seed mode matching looks fine ~ 90%. Just need to get the communication working for the translation stage then we're ready for NLG optimization.
Pretty much everything is built now for the VOPO assembly setup except for the front seed path we'll need for measuring the escape efficiency. I think I'm going to have Jaime work on that when he starts on Thursday.
This afternoon I continued work on the H1 Spare VOPO. I improved the 532 mode matching by changing the focusing lens before the cavity and adjusting its position, now getting > 80% in TEM 00. That should be sufficient for this build setup. I then locked the cavity for the first time using an LB1005. Tomorrow I'll fiber couple over some seed light and align the rear seed path so we can proceed with optimising the NLG.
Swadha, Evan
We continued coupling studies with the fused silica cavity and prisms, this time using 2.5 µm aluminum foil applied using the procedures described previously.
Swadha has set up the cavity in the vacuum tank for signal injection and extraction.
The following describes the optical configuration when the cavity is resonating, with powers given by a power meter. The laser is an NPRO (1064 nm) and the input polarization is p.
The cavity finesse in p is something like 700, and the finesse in s is higher. I did not make a more detailed measurement yet than eyeballing on the oscilloscope.
Now, some comments about mode matching and HOMs:
knm library to compute overlaps into the cavity's TEM00, TEM02, and TEM20 modes from a mismatched Gaussian mode at the input, we should infer that we are coupling 90% of the input light into the cavity, assuming the beam is reasonably clean.I turned the input power down to 1.84(5) mW, giving 1.32(5) mW in reflection. I set up an NF1811 in reflection and found the following:
The attached notebook (augmented from an earlier one) computes the tranverse mode spacing in the vicinity of the carrier as the effective ROC is varied. There could also be some effect from the path length variations due to the slightly non-square path length traversed through the bulk of the cavity, but this is not considered.
When the cavity is locked in s, we see both TEM(0,22) and, more faintly, TEM(12,5), on the transmission camera. Other predicted modes are not obviously visible.
Wen, Eric, Daniel
Main Laser Table
Before last week, we finished up reassembling and characterizing the CLF and LO generation paths on the laser table in LASTI. In this configuration here, we are using a pair of AOMs for LO generation upon Eric's reccomendation to avoid running out of actuation range for LO phase locking. Both the seed and the CLF paths are coupled into separate fiber collimators and are switched in and out of a common SM fiber that runs to the squeezer table. The LO fiber is coupled into a long PM fiber that is protected in a rigid rubber hose and ran to the detector side of the squeezer table. All paths are mode-matched into each fiber with around 60-80% coupling as far as I can tell. Depending on the exact fiber we use in each collimator, coupling efficiencies above 90% have been observed. Some pre-existing lenses in this setup were not labeled, however the mode-matching lenses before each collimator package should be fairly accurately depicted here.
Homodyne Detector
This week, we finished designing and mocking up the homodyne detector to be rebuilt on the squeezer table. We are taking a similar approach to a homodyne detector used at the sites (E2000282) in 2020. In this approach here, the SQZ and LO beams are mode-matched at a wide mostly collimated waist that coincides with the plane of the homodyne detector's beam splitter. The PM fiber carrying the LO signal is brought up onto the table and is coupled out using a ThorLabs F220APC-1064 collimator. This particular PM fiber (OZ-Optics) has a strange ferule length, so the light coming out of the fiber is not well collimated. In fact, it forms a waist of ~200um in diameter approximately 32 cm from the front plane of the package. Eric gave us an OZ-Optics collimator which was better matched to the fiber to fix this. Unfortunately, it is quite large and didn't fit into any of our tip/tilt mounts, which would potentially prove to be annoying down the line. So in the end, we opted to stick with the uncollimated beam from the ThorLabs collimator and just mode-match to that. It turned out that our SQZ beam and uncollimated LO beam had similar waists, so this was not a big problem. The mode-matching solution can be viewed here. Each PD captures a beam of diameter ~100um focused by two identical R50 super-polished PLCX lenses. We went ahead and started building this and had gotten to the point where we were able to observe similar LO power on each photodetector using the PD1/2 output monitors on the homodyne detector.
At this point, I began the process of zero-ing the difference channel of the homodyne detector and noticed that it was essentially railed at +13.8V. This particular detector is version 5 of the standard LIGO homodyne detector (D1300671). It was later discovered that U9 (the differential TIA) operational amplifier was behaving as if it were completely open-loop and the inverting input was drawing substantial DC current. I am fairly confident that this is just a bad part, but instead of debugging this detector immediately I went ahead and just swapped in a spare homodyne board. After this, I was able to get the difference channel DC offset down to sub-millivolt levels on a scope as a decent start. Next, I will be repeating the balancing process while looking at the output noise floor of the difference channel. In any case, the individual PD1/2 output monitors (with a TIA gain of ~1000) read an output DC voltage of 477 mV with 540 uW on each detector (measured with a ThorLabs free-space power meter). Given an ideal responsivity of ~0.86 for 1064nm, we would expect to see a voltage of V1,2 = 540uW * 0.86A/W * 1000 V/A = 464mV. Given that the measured voltage is slightly above this, I expect that in fact there is some error in my free-space power measurement. Nevertheless, the fraction of power captured by each PD is likely very close to 100%, so we will continue to improve the alignment and overlap with the SQZ beam this week.
Homodyne Detector Repairs and Failure Mechanism Theory
Shortly after posting this, we noticed that the spare homodyne detector in our setup became very noisy with periodic transients that looked like these in all output channels. Some time later, this resulted in a hard failure of the differential TIA channel as U9's output became somehow shorted to the +15 volt rail. After seeing this, we decided that it would be worth it to just repair the homodyne board that was in the LASTI detector initially. The fault with the first detector board turned out to be due to a failure in the differential channel diff-pair buffer for the DB15 connector (U8) which ultimately shorted the output of U9 to the +15 volt rail. Both U8 and U9 were replaced and this board was re-installed into the homodyne enclosure. The TIA gains for the detector at this time are:
PD1/2: 5K
DC: 100K
The spare board was also investigated, and curiously, the initial transient noise that was first noticed on this board was originating from the non-inverting input pin of U8B. It seems like this output buffer (U8) that drives the differential diff-channel through the DB15 connector tends to fail in such a way that can cause the previous diff-channel TIA (U9) to fail as well. As for why, a potential theory is that it is possible for the inputs of both op amps to exceed their differential voltage absolute maximum limits of +/-0.7 volts when each stage rails. Additional non-idealites such as the fact that these opamps have neither rail-to-rail inputs or outputs means that at extreme photocurrent imbalance, the input pins of U8 and U9 can begin to draw current that may result in input overload, especially if U8B is railed. A rough guess as to what exactly occurs is as follows.
1.) During alignment, the two detectors produce imbalanced photocurrents.
2.) If the imbalance is too great, U9 will rail, placing +/-13.7V on the noninverting input of U8B.
3.) U8B will rail, and in doing so will try to pull the inverting input back up to match the output of U9.
4.) Because at this voltage, the inputs may draw current, U8B will fail to balance the inputs as the amplifier is now sautrated and a voltage drop must occur across R34 and R32. If the imbalance on these inputs approaches or exceeds +/- 0.7 volts, the device will be damaged, potentially shorting the non-inverting input to a supply rail and thus shorting out the output of U9.
The same logic can be applied more basically to the differential TIA stage, only the source driving the inputs away from each other is now the photodetectors - which are less likely to be able to source enough current to cause damage to the junctions in the device. This is a very speculative theory as to what the failure mechanism is here and more investigation would be necessary to conclude that this holds any weight.... this is just an idea I figured I would write down before forgetting.
In any case, the spare detector board was repaired in the same way as the previous one and is now functional again. The TIA gains for the spare detector board at this time are:
PD1/2: 1K
DC: 10K
Successful LO Shot Noise Measurement
Today, we re-aligned the homodyne to the LO path on the squeezer table and were able to balance and capture the shot-noise floor of the LO alone. Using amplitude modulation on the LO, we observed an input-referred common-mode rejection of at least 30dB. Turning the amplitude modulation off, we took noise measurements of the difference channel and one of the two single-ended PD channels here. For this measurement, the LO power on each PD was 0.620mW (confirmed by the DC voltage on PD1 -> 2.68V). At this power, the expected shot noise contribution to the output voltage noise spectral density is ~1.9uV/rt(Hz), which is close to the noise floor we measured. The darker traces on the SR785 are the dark-noise floor of the detector. At this point, we conclude that the homodyne detector we are using is functioning well enough and will move on with aligning the sqz path.
[Hudson, Jacques]
We tested out the Phasics camera for mode matching the beam out of the Mach Zehnder interferometer with the breadboard OPO homodyne's local oscillator. After about 6 hours of time in the lab, including time spent figuring out how to use the Phasics camera, we achieved 97.1% mode overlap (visibility). Profiling the final beams with the phasics camera, the computed local oscillator and MZI beams have a computed overlap of 96.9%, consistent with our measurement on the homodyne itself.
As a reference point, I spent ~20 hours in the lab the previous week attempting to mode match these two paths using a CCD beam profiler and could only manage to achieve 93% visibility.
Some observations:
1) If the beam is too small or too large on the camera, the computed waist size and position will be inaccurate. However, the computed numbers do not include error bars, so it can be somewhat hard to tell when this is the case. The sweet spot seems to be a beam diameter of 1 mm or so.
2) A good work flow seems to be
i) Take a beam profile of the seed and target beams with the Phasics camera at a fixed location
ii) Use some mode matching software such as a la mode determine the mode matching lens locations
iii) Place both lenses and use the Phasics camera to coarsely position the lenses in the viscidity of the locations computed with the mode matching software.
iv) Fine-tune the lens positions using a homodyne diode.
Our new nonlinear crystals have finally arrived, in these crazy times. We received two SPPKTP crystals (labeled #3 and #4) from ANU. I did some microscopy inspections to make a record of what we received.
Crystal #3 has some damages on the flat side with AR coating. The wedges side looks OK. See this summary picture of SPPKTP #3. The wedge of the crystal is pretty small, as can be seen from old log pictures when we received Raicol crystals in 2017.
Crystal #4 has a much better quality. No damages are seen from both sides of the AR-coated surfaces. See this summary picture of SPPKTP #4.
All the other paperworks we received are also attached.
The mode matching was drifting substantially on the BOPO homodyne over the course of a day. To fix this problem, we decided to redo the mode matching to the BOPO homodyne and remove some unnecessary optics from the path. We removed the segment of SM fiber going to the homodyne's LO fiber coupler, so this path is now PM fiber end-to-end. This also increases the maximal LO power to >5 mW. This is too much for the homodyne but provides us with a convenient optical pickoff for an eventual coherent tone on a superdense coding experiment. We also removed the quarter waveplate and PZT mirror from the BOPO LO path since the phase actuation is now done with an AOM pair and removed a lens before the homodyne's 50/50 beam splitter. After taking a beam profile of the LO and MZI output beams and optimizing the position of a pair of mode matching lenses, the MZI output to breadboard OPO HD visibility has been recovered to about 92%, which seems to be the global maximum for the current lens pair. Ideally, this would be improved further to >95% before taking final measurements.
A few weeks ago, we took more time series data for Teraxion linearity measurements with higher frequency modulation amplitudes (2GHz and 5 GHz) and 1 kHz carrier frequency. The new data has been difficult to fit with both least squares and MCMC, but I recently tried using gradient descent for curve fitting and now have some informative fits for the 2 GHz data. These results required fitting for 10 harmonics, abandoning the assumption that all modes are in phase with each other, and adding a term for residual amplitude modulation. The results suggest that Teraxion is noticeably more non-linear for deeper frequency modulations (as opposed to 1 GHz that we fit for previously). I attach two fits and list their parameters below. fit27_10: V0: 0.6251 Vfringe: 0.7836 phi: 1.0711 a: 0.2020 (AM) psi_a: 3.0275 (phase of the AM) Modulation depths: m1: 0.7143 m2: 0.5826 m3: 0.5468 m4: 0.3856 m5: 0.2048 m6: 0.1631 m7: 0.0875 m8: 0.0747 m9: 0.0254 m10: 0.0266 Phases: psi1: 3.0520 psi2: 3.1502 psi3: 3.5166 psi4: 3.2619 psi5: 2.7604 psi6: 3.7823 psi7: 1.1881 psi8: 3.6516 psi9: 0.5109 psi10: 3.3111 fit28_10: V0: 0.2421 Vfringe: 1.4911 phi: 0.8916 a: 0.3625 psi_a: 3.2381 Modulation depths: m1: 0.6388 m2: 0.4169 m3: 0.4405 m4: 0.2875 m5: 0.1278 m6: 0.1349 m7: 0.0217 m8: 0.0379 m9: 0.0159 m10: 0.0089 Phases: psi1: 3.2005 psi2: 3.4836 psi3: 3.8031 psi4: 3.8273 psi5: 3.7472 psi6: 3.5363 psi7: 5.9480 psi8: 2.9835 psi9: 5.6154 psi10: 2.4806
Adding data files: 27, 28 - 2V; 29, 30, 33 - 5V
The LASTI squeezer was recovered to the state before I left in last December. The misalignment into the SHG cavity was found and fixed. The fiber coupling was fine. Note that the SHG TEC was suddenly off overnight (March 14th) for unknown reasons. We'll keep an eye on it if it gets turned off again for some reason.
The green alignment to OPO was recovered. We measured 36.0 uW transmission after M2 when on resonance and 27.2 uW on the in-air TRANS PD, given 3.2 mW of input to M1 (sideband + HOM). The peak power on TRANS PD is 145 mV for main 00 resonance, but I do see another resonance giving 54 mV peak in one FSR. This secondary resonance also has a 00 mode shape on camera. We will tune the input waveplate to see if we can remove the secondary 00.
In the previous post, I saw another beam spot on M1 that's as bright as the circulating beam. I tried to find the ghost beam but didn't find any. This may be the reflection from the AR-coated wedge surface. I'll leave it as it is. The laser card was accidentally dropped into the gap between the breadboard and the chamber. I think it's easiest to retrieve it by lifting up the breadboard again. We'll probably do it near the end of the installation, just in case if there's anything else slipped into the gap.
We've lifted up the VOPO breadboard today and picked up all the things dropped in the gap - one laser card and one optics.