Amit Singh Ubhi - posted 17:23, Tuesday 23 December 2025 (12121)
1D installation and 6D changes
The team from Birmingham (Amit, George, Lari) and Tsinghua (Yulin) came between the 12th Dec - 22nd Dec to install the 1D seismometers in the hutches, and to rotated 6D in RZ to allow us to transition fully into the low noise operation (500 Ohm impedance - per path - on all coils).

6D: After the vent, we noticed that the RZ control signal didn’t change, last year we though there was some weird behaviour where the RZ control in air and vacuum could be different, we believe this was likely due to air currents which caused this odd behaviour. The vent confirmed that the in vacuum and in air RZ position should be the same. 

6D managed to retain its control in the semi-low noise configuration using Lari’s 1mHz-500mHz bandstop coil drivers, and the impedances for the horizontal coils were H1 = 0 Ohm, H2 = H3 150 Ohm. 

I then transitioned 6D back into the high range configuration, i.e. no bandstop coil drivers, and 0 ohm impedance on all coils. When doing this the RZ control signal increased by nearly 2000 counts from ~4500 counts to ~6300 counts. This was odd, and we discovered that the 0 ohm impedance path for one of the coils was damaged resulting in only 2 of the horizontal actuators providing the control which explained the discrepancy. 

Before we discovered the impedance issue, we initially calculated that we had to rotate the suspension point by 30degrees counter-clockwise when looking from the top. After doing this the control signal reduced from ~6300 counts to ~4000 counts. It was determined that the fibre we used was slightly thinner than the previous fibre we had (the old fibre’s parameters were used to calculate the 30 degrees), resulting in a smaller RZ stiffness. After recalculating, we required an additional 45 degrees of rotation and were able to bring the RZ control signal down to a few hundred counts (some small changes have occurred, I think likely due to closing the door and suspending the ISI but the RZ controls signal didn’t change very much, currently at ~335 counts).

We resolved the impedance switch box issue and after pumping the chamber down, we have successfully transitioned 6D into the low noise (500 Ohm impedance for all channels) - this is compensated for in the COIL X,Y,Z,RZ,RY,RZ filter banks, where a gain of 24 is implemented for all. This gain is calculated via the ratio of impedances on the coil drive path where the coils have an impedance of 43 Ohm. Gain = (43 + 2*500)/43 ~= 24

Note that after we arrived back in Birmingham, Arnaud required an iop model restart. This caused 6D to lose its locked position, requiring me to re-catch it, this was done successfully. A note on this - because of the “dewhite” filter in the coil outputs, it causes large changes in the output coil values which saturate the DAC when the mass swings out of the BOSEM range, it is important that the gains of 24 are reduced to stop the saturations occurring, allowing the coil drive not to saturate so that the mass can be caught. 
- You should transition to RX/RY damp, RZ stays in catching mode
-  Gains of COIL_RX,RY,RZ should be reduced to stop the saturations, maybe as low as 5 but depends how quickly the mass swings through the BOSEM range
- Once the horizontal BOSEM signals are in range again, COIL_RZ gain can be increased back to 24
- Once vertical BOSEM signals are in range, COIL_RX/RY damp can be increased to 24
- RX/RY catch can be re-engaged

1D:
We planned to install our 1D seismometers in the HAM-ISI hutches. 
The 1D seismometers use a leaf spring design which has a pivot point (X-flexure) which constrains the end point motion of the leaf spring. By optimising the position of the end point of the leaf spring and the location of the pivot point, a close to zero-stiffness configuration is obtained. There are 3 stiffnesses that contribute to the system, the leaf-spring, the X-flexure, and the gravitational spring. 
We raise the centre of mass of our system to create a gravitational anti-spring, allowing us to increase the period of our seismometers, the final measurement of the periods are listed below, but they may have changed slightly when we closed the door and floated the ISI due to the small changes in the ISI tilt, however the change in ISI tilt when Rich locked the ISI was less than 0.1 mrad.

S1A - ~30s (close to unstable)
S1B - 13.5s
S2A - 16-17s
S2B - 14.5s
S3A - 12s
S3B - 9.7s

The periods are susceptible to the DC tilt position, as the centre of mass position changes, changing the total rigidity of the system. 

The seismometers are installed in pairs as a station (S1A, S1B) (S2A, S2B), (S3A, S3B). As the centre of mass is raised above the pivot point enables us to have each seismometer have a proportion of horizontal coupling in the measurement, this will allow us to decouple the pair of seismometers into independent vertical and a horizontal signal. The A seismometers are aligned closer to the centre of the ISI, and the B seismometers are further out. When looking from the top of the ISI, the free of the A seismometers point in the clockwise direction (fixed end to free end), and the B seismometers point in the counterclockwise direction. The ISI-Table figure shows the approx. locations and directions of the 1D seismometers, 6D, CRSs and T240.

The seismometers are sensed using an optical lever style configuration and are operated in a force feedback regime which is what we use for the readout of the seismometer.

Details on the design, assembly, and installation

Leaf Springs Properties: The leaf springs are made of Ni-Span-C, which has a programmable dE/dT (Young’s modulus with respect to temperature) through its heat treatment process. We have tried to programme them close to 0 to reduce direct temperature noise in the mHz band and below. Our Ni-Span-C leaf springs have some residual magnetism after heat treatment, which has a gradient across its length. We ensure we install the side with less magnetic coupling on the free end side of the seismometers. To further reduce the magnetic noise we install our seismometers in a Mu-metal shield which should reduce the magnetic coupling by ~200. 

X-flexures and Leaf Spring Clamping: When installing the X-flexures, their stiffness is highly dependent on how they are clamped. We had to ensure that we do not compress the X-flexures in anyway as this can result in a drastically different rigidity than what is analytically calculated. As all of our rigidities are in the 10s of mN m / rad region, the assembly is susceptible to these small clamping details. The same is true of the leaf spring itself, it was important to ensure the maximum height of the arc is equal on both edges of the leaf spring to ensure it is symmetric as possible.

Buoyancy: We tune the centre of mass position in the horizontal direction to make sure we require a downward force corresponding to -5.5mA of current in the force feedback coils. When we pump the vacuum chamber down, the buoyant force disappears which results in the DC current also reducing. We ended up with between -0.8mA to -2.5mA of current after pump down. We overestimated the current required for the buoyant force because their can be a small amount of creep due to the relaxation of stresses induced during installation which would cause the current to reduce even more in the coils (go towards 0).

Digital and Analogue: We set up the seismometers and tuned them by connecting them to CDS, repurposing the 6D input and output channels. However, once installed we transition them to an analogue servo where we readout the coil drive to CDS. There are 5 jumpers inside the analogue servo which control the gain on the coil readout to CDS which add up linearly (10, 20, 40, 80, 160). We currently use the 10 and 40 (10+40 = 50) jumpers to get a gain of 50 to improve the ADC noise in our measured signals. The resonance of the ISI and the UGF of the force feedback servos are close, so in the 10+80 gain configuration we slightly saturate the ADC every so often so we left it in the 10+40 configuration for now. 

Seismometer S2A coil direction: One of our pins which connect to the force feedback coil inside the seismometer station made contact with ground. This was not noticed as CDS drives differentially, so we still had control. However the analogue servo drives the coil relative to ground, and the drive pin was the one which had grounded inside the station. Unfortunately at this point the station was installed in the mu-shield and inside the hutch closest to the beam tube (the most difficult one to get the seismometer in and out from), and the hutch doors had been closed and torqued back to spec (28 ft lbs per bolt). Lari was able to resolve this by swapping the pins for the ground and drive on the cabling outside of vacuum. This means that this seismometer has an opposite sign compared to the other 5.

Slider coils: On the proof mass we have two separate coils, each wound in an anti-helmholtz configuration in 40awg wire with ~330 turns in each section. The magnets are attached the ground to reduce magnetic coupling to the seismometers. The second coil sits atop PTFE rails which allows it to slide. We can drive this coil with short DC pulses to change the horizontal centre of mass position and tune the DC current required for the force feedback coil. We did this before pump down to ensure we compensate for buoyancy correctly. This was required as the slider coil moved when we installed the Mu-shields and tried to move the stations from the ISI table to the hutches.

We need to diagonalise our seismometers now, this will be done in due course, along with the additional medm screens that are needed for blending with the ISI controls.

If there are any questions please get in touch with me and I can answer them and add them to the log.
Images attached to this report
Non-image files attached to this report
OEO General
hudsonl - posted 19:34, Friday 19 December 2025 (12119)
High-Frequency Squeezing Measured with Compact Squeezer and Newport 1811 RFPD
I sent the compact squeezer and homodyne LO to a Newport 1811 RFPD to measure squeezing around 10 MHz. I measured up to about 0.4 dB of squeezing and 2.0 dB of anti-squeezing between 6 and 8 MHz (see attached plots). This measurement should have about 70% total loss, with the loss budget as follows:
- Homodyne visibility = 96% --> 8% loss
- Use one output port of balanced homodyne's 50/50 beam splitter --> 50% loss
- 7.1 dB of dark noise clearance --> 16% loss
- Newfocus 1811 RFPDs have a responsivity of R = 0.7 at 1064 nm, for a QE of about 80% --> 20% loss
Neglecting phase noise, the measured 2.0 dB of anti-squeezing and 0.4 dB of squeezing suggest 3.4 dB of generated squeezing and 80% effective loss. The extra 10% loss likely comes from OPO escape inefficiency of a few percent, several percent losses on three commercial (not super-polished) optics before the 1811 RFPD, and other minor loss mechanisms.

There is plenty of room to improve squeezing by reducing these loss mechanisms and increasing the nonlinear gain. At the moment, the key point is that we get a measurable and controllable amount of squeezing in this frequency band and that the spectrum does not have too many lines.
Images attached to this report
CDS General
richard - posted 09:01, Friday 19 December 2025 (12118)
M1ISIHAMX - ADC1 - CH7 malfunctioning

[Arnaud]

Yesterday at around 7:15pm, one of the channels used for the CRS became unresponsive (ADC1-CH7 reading flat 0 from the IOP inputs) which is likely a CDS issue.

This morning I rebooted the m1hamx frontend and IO chassis, and checked the cards are sitting correctly, but this didn't fix the problem. Ideas welcome...

Images attached to this report
LASTI General
Rich - posted 09:22, Tuesday 16 December 2025 - last comment - 07:46, Friday 19 December 2025(12116)
Lasti triple suspension

We removed the triple from the HAM-X chamber. it is wrapped in clean foil and in the PSL enclosure. 

It weighs about 102.5lbs

Comments related to this report
[Tom, Rich, Bruno, Arnaud] - 07:46, Friday 19 December 2025 (12117)

Yesterday, we removed the following masses from the 'front' side of the HAM chamber: 

4x 5kg, 2x10kg, 1x1kg = 41kg / 90.3 lbs

and we added the x2 crs with the following weight:

Crs1 = 18.4kg/40.5lbs, Crs2 = 18.75kg/41.3lbs = 37.15kg/81.73lbs

here's a table to help us keep track of hamx weight : link 

The hatch on the 'front' side was closed with the 1D installed, and torqued to 28ft.lbs
 

Images attached to this comment
GRAVITES General
begum - posted 00:33, Monday 01 December 2025 (12114)
GRAVITES data acqusition set up

I set up the Keithley DAQ6510 for long term data acquisition for the GRAVITES setup. 
I attempted taking low frequency data with SR785 last week, setting the bandwidth to 1 Hz, with 100 points, 10 averages. It was not able to complete this set even once (the device channels occasionally saturates and this returns the average number to 0). Of course for long term studies on the phase offset between the control field and the signal field, we need to be able to record long data segments and post-process ourselves for removing glitches and proper averaging. With the pzt drfit issue solved, the only thing left to do for long term monitoring is setting up the data acqusition. 

DAQ6510 takes data from the front or the back terminal. The back terminal channels 101 and 103 are set-up for monitoring the temperature of the laser prestabilization setup. Channel 110 is for PZT mon, 111 is for the 1545nm HD and 115 is for the 1550 nm HD tap-off we usually use for monitoring on the oscilloscope. 110, 111 and 115 are set to acquire DC coupled voltage data. In the current set-up, I aimed to still monitor PZT mon and 1545 nm error signal on the oscilloscope at the same time as the data acqusition, so there are BNC T-splitters on the path. PZT mon is split once, 1550 nm HD split once, 1545 nm HD is split twice (the first split is between the error signal to the servo and the diagnostic arm, then the diagnostic is also split into two: oscilloscope & DAQ6510). The BNC cables going to the back terminal of the DAQ6510 are labeled clearly, so the oscilloscope can be disconnected while acquiring data. For reference, input impedance of the DAQ6510 is >1 MΩ.

The device is connected to the local network with an ethernet cable, Menu --> Connection --> LAN menu shows the IP address.  On a computer on the same network, one can access the machine remotely by typing in the IP address on the browser bar. Attached is a screenshot of such a connection on the GreenLab desktop, showing the Home screen, Channel 110. The "Extract Data" layer shown on the lefthand menu allows us to download data to the computer directly from the designated buffers. Alternatively, one can click on "Save to USB" on the Home screen for immediately saving the buffer data to the USB (plugged in physically to the DAQ6510 front left USB port), or automatic saving to the USB can be arranged while setting up the measurement itself. Buffers don't auto-clean themselves, so the data from the previous scan is intact (and download-able) until a new scan is started.

Menu --> Scan is the main menu that lets us select the channel numbers, the channel type, where and how often to save the data. The device first saves the data to a buffer, then to the usb. Both Buffer 1 & 2 have a capacity of 100 000 data points, either one can be selected from the Scan settings. The minimum Scan to Scan interval (under Scan settings) is 8 us. For 10 us interval, 2000 scans with 5 channels take 4 minutes 45 seconds, so data acqusition takes 28.5 ms, nearly all of the time spent in saving the data. This is a bit shorter if only one channel is being saved, 17.2 ms per step. Saving to usb every scan vs at the end of all scans doesn't seem to make any difference. I defined a new "buffer4" with 6 000 000 data points, with 10 us interval, this comes up to 1 day 4 hour 43 minutes of data (with a single channel). I am leaving a scan with these setting over night, for a dummy data acquisition campaign with the PZT mon signal. 

Images attached to this report
GRAVITES General
begum - posted 16:28, Friday 21 November 2025 - last comment - 11:40, Monday 24 November 2025(12101)
GRAVITES short MZI (2-floor input/output segments) test Part I, PZT drift fixed

[Dorotea, Begum, Eric]

A short MZI using the input and output segments prepared for the 2-floor experiment was set-up, using 2 backup AOMs and the 18m fiber on the pzt-stretcher. Some components were re-purposed from the rotating setup: pzt stretcher, 1545 and 1550 nm balanced HD boards. The short MZI lives on the optical table, within the enclosure box. This report is with the imbalanced MZI configuration, with ~20 m long fiber segment on the PZT stretcher (~18 m of it is wound on the stretcher itself, ~2 m free) which is not compensated on the other arm.

PZT drift issue:
Just like the previous setups with 1 km and 27 km long fibers, initially the the MZI would lock, the pzt strecher would drift until it rails, relock slightly above the rail, proceed drifting, rail, repeat. The PZT range was measured to be ~2.2 cm. So it became apparent that something was wrong with the setup. It turns out the IFR Marconi Signal Generator (this is the one that gets the external modulation from the MZI servo AOM control pathway) was not clocked to the SRS SG380 (Rb frequency reference). This caused a ~17 Hz frequency difference between the two RF sources that drive the two AOMs on the arms. This setting is not visible on the screen, so one should check the clock if something fishy happens with the PZT drift again. The setting can be found in Utility Group Menu --> Frequency/Sweep Menu --> (4) Frequnecy Standard. After Eric figured out this issue and corrected it, the PZT drift is completely gone! The lock point is steady at ~5.5 V at PZT MON. The MZI servo now seems to stay locked for days. 

2nd MZI Servo Box for the 2-floor setup:
MZI Servo Box is comprised of three PCBs: power board, (common) servo board, split servo board. See my log 12036 for previous work done on these. Once the second servo box is operational, a noise measurement with the two interferometer configuration will be conducted, keeping both MZIs locked with their corresponding servo boxes simultaneously with the 1545 nm fields, then measure the differential noise on 1550 nm, specifically looking for additonal noise on the unsecured segments. 

Loop characterization, MZI 2, Arms 1 & 3:
OLTF for common loop and the cross-over point of the nested loops are shown here, consistent with previous measurements. For this measurement, the control AOM and the pzt stretcher on the common arm, which is a different configuration than what is planned for the Vienna 2-floor steup. 

PZT range measurement:
I measured the range of the PZT by driving it thorugh the excitation input of the split servo board. Oscilloscope screen with 1 Hz pzt drive with 5 Vpp is shown, yellow is the 1545 nm HD signal, purple is 1550 nm HD signal and blue is the PZT Mon, showing 2pi calibration for the HD signals, and pzt voltage range that causes 3 periods of path length (+stress induced refractive index) change. The full range of the PZT is 2.2 cm, assuming all change is in fiber length.

Preliminary noise measurements, MZI2, Arms 1&3:
After leaving the box closed over the weekend, I measured spectra for the 1545 nm HD signal (also the error signal) and the 1550 nm HD signal, see attached plot. Also attached is a plot comparing the spectra measured with the 27 km long arms mounted on the rotating stage, note while the 2025-04-24 data did not have any unsecured fiber lengths associated with it, the current setup does due to the unshared pathways for the 1545 nm control signal and the 1550 nm signal-under-test. The differential noise measurement for the two MZIs will let us characterize the noise due to the unsecured segment. Full comparison will be done when the full system is operational, also plotting the SR785 and HD board noise floors for comparable Vpp. 

Images attached to this report
Comments related to this report
begum - 11:40, Monday 24 November 2025 (12113)

The attachments for the open loop transfer function for the common loop and the cross-over frequency were missing. Here they are. 

Images attached to this comment
LASTI General
bruno - posted 13:29, Friday 21 November 2025 (12111)
Hanford flange arrived
11/17 — Received the 13.25" replacement flange from Hanford for the Vacuum Bake Oven (VBO).

11/18 — Performed cleaning in two stages:

Degreased in the electronics lab fume hood.

Conducted full cleaning in the vac prep lab using Liquinox, DI water, and Citrinox while the flange rested on aluminum spacers with Alpha Wipes.

During cleaning with isopropyl alcohol, removed the copper gasket and discovered a large dent on the 13.25" knife edge.
This damage makes the flange unusable or at best, a poor candidate for vacuum sealing. (Photo documented.)

11/20 — Inspected the gasket under the microscope (photo documented). Coordinated with Gerardo and Jordan at Hanford, who identified an identical replacement 13.25" flange (with 2.75" and 4.5" rear ports). They will ship the replacement once they verify that its knife edges are in good condition.
Images attached to this report
LASTI General
bruno - posted 19:22, Thursday 20 November 2025 (12112)
Lasti M1SUS chassis fix
Rich determined that the M1SUS power supply was failing at startup due to an excessive inrush current. The system includes six mezzanine boards, each with roughly 150 µF of input capacitance. When the 12 V rail is enabled, the regulator senses the surge and shuts the output down to 3 V.

11/20 Update – We installed four inductors housed in a 3D-printed mount within the chassis. Each inductor was placed in series with one of the four ATX cables supplying the board. Pins 10 and 11 on the ATX connector were tied together, as both provide +12 V for current-rating purposes.

Rich and I powered the system on today, and the modification appears to resolve the issue.
Images attached to this report
SQZ General
eoelker - posted 18:32, Thursday 20 November 2025 (12110)
VOPO Chamber Pumpdown

[Daniel, Eric]

Over the last week, we've been preparing to pump down the chamber.  Finally sealed things up yesterday and started pumping down this afternoon.  Currently sitting at around 1e-5 mbar.  When we first moved the VOPO tank into the highbay last year, I did a test pump and got into the high 10^-7 range.  No particular vacuum requirements for this expt.  We just want to be under a decent vacuum for our long term test of the SPPKTP crystal.

We've also started building a box for the Homodyne and pd table (see picture).  

Images attached to this report
GRAVITES General
dorotea - posted 14:48, Thursday 20 November 2025 (12109)
General update on GRAVITES switched IFO setup

I'm overdue on an overall update on the switched setup for GRAVITES. In general, all the components have been chugging along towards being done in parallel, and should be done and tested quite soon. 

I'm hoping to have all the components for the switched measurement (minus the long arms) done and tested within the next few weeks so they can be sent off to Vienna before the end of the semester.

GRAVITES Electronics
dorotea - posted 21:31, Wednesday 19 November 2025 (12108)
Servo 2 done, locking

Over the last week I've been getting the second set of servo electronics I built over the summer working; as of today they work! A transfer function is shown below; this one has a much higher UGF (~80kHz) than the one in Vienna (~10kHz, recall that on these boards the UGF is actually at -20dB because of the input attenuation; also that Eric and I added extra gain to the one in Vienna in the spring) but that can be adjusted. It turns out the common and split boards were actually fine the whole time, although the second power board was wonky (but that isn't relevant to the confusion over the split board, since servo2 was tested with the power boards from servo1 which we know works). I did build a new power board. I think what may have been the problem (because I initially made the same mistake testing the boards this time around, and I think the misbehavior was similar) was that when split2 was plugged in to power1 it was connected to the wrong voltage reference-- there is one output on the power board that puts out +- 15v for an LED instead of the voltage reference, which in this case is +-10v. This output is not super obviously marked if you don't look closely, so I think this is an easy mistake to make; I put a piece of tape over that output on the power1 board and didn't stuff that output on power2. Fortunately, the MAX333 is (in Eric's words) "beefy" enough that this overage doesn't seem to have harmed it and the split boards work fine. 

Also useful to note is that the LT1021 used for voltage references on these boards has a really confusing naming scheme and there are multiple versions that supply different voltages. We're out of the 10v kind that are supposed to be used here, but I'd used a 5v version and it still works ok although I plan to replace it after placing a digikey order. 

Images attached to this report
SQZ General
eoelker - posted 05:02, Tuesday 18 November 2025 (12106)
New SQZ PM feedthru works great

[Daniel, Eric]

We're getting ready to pump down the VOPO chamber this week.  Now that our nifty new 4-channel PM feedthrough is here, we've decided to convert our setup fully to PM.

We rigged up a strain relief for the fiber feedthrough and ran the fibers over to the table in a flexible PVC tube for protection and environmental isolation.  The stainless steel jacketing is quite nice, very sturdy.  In vacuum, the fibers are teflon jacketed.  Its easy to see and also seems like a robust solution.  The new feedthrough for HAMX that Slawek bought has stainless steel jacketing in vacuum.  We still need to test which approach is better for vacuum qualification.

Our feedthrough has 3x 532 nm fibers that are continuous all the way from the main optics chamber to the VOPO breadboard in vacuum.  They have high power end caps which should make them quite durable.  We hope to do some long-term testing to confirm this.  We were able to get about 37 mW into vacuum with 51 mW incident on the collimator, so about 70% end-to-end coupling.  Likely this is mode matching limited rather than feedthru limited.  We still need to set the polarization axis of the input field correctly, should finish tomorrow. 

We rebuilt the 532 nm path in vacuum to account for the altered mode of the end-capped fiber.  We were able to get the mode matching to the VOPO up to 95%. 

Channel 4 of the feedthrough is 1064 nm and we will use this for the rear seed/CLF path.  We've replaced the SM fiber switch for the Seed/CLF with a PM 50/50 fiber beamsplitter.  Its fast-axis blocking, so setting the PM axis is a breeze.  About 75% throughput connecting from the 50/50 beamsplitter to in vacuum.  We are seeing excellent polarization extinction in the chamber. After rotating the collimator to the correct axis we couldn't measure the reflection off of the thin film polarizer.  According to the testsheet, the PER should be around 30 dB, which is typically the limit for a PM fiber device. 

 

 

Images attached to this report
LASTI General
Bruno - posted 16:45, Friday 14 November 2025 (12105)
Knife edge damage on vacuum bake oven
11/11/25 - Picture of damaged knife edge on rear flange with a few 47 Micron diameter wires for scale. The indent is maybe 20-30 Micron? 

Polished the scratch with circumferential motions of a Novaculite Arkansas stone followed by fine emory cloth with isopropanol for "wet sanding". After this I cleaned the knife edge with isopropanol and placed the flange on the chamber with a silver plated 13.25" gasket.

Cleaned all open flanges with isopropanol.

Torqued the bolts starting at 8 ft*lbs up to 32 ft*lbs in a star pattern. 

11/12/25 - Placed a blank on the 4.5" CF flange and connected the Varian helium leak detector to the 2.75" CF port. Unfortunately still detected a leak coming from the same rear flange despite new gasket and polishing. 

Gerardo Moreno and Jordan Vanosky at Hanford miraculously found a 13.25" flange with a 2.75" port and 4.5" that should arrive here next week. 
Images attached to this report
Frosti-Lite General
Evan Hall, Bruno Brecher - posted 18:57, Wednesday 12 November 2025 - last comment - 09:43, Thursday 04 December 2025(12104)
FROSTI-LITE Assemby and Initial test scans
FROSTI-LITE ASSEMBLY
Parts
4*Heating segments (Al)
4* upper segments (Al)
4* Thermistor (4022-ATH100K1R25TB-ND)
Nichrome wire (26 AWG )
-We wired the heating segments with Nichrome wire, with about 6 inches extruding out on either side
 -Tweezers can be used to guide the nichrome wire while winding however we found that using fingers to hold the wire against the heating segment was much easier
 -While wiring it is important to make sure that the Nichrome wire is held in tension against the walls of the heating segment
 -Future recommendations: For even resistance across all segments, try to make the length of Nichrome wire used in all segments roughly the same (And ofc, use the same gauge wiring)
-We then assembled the 4 heating segments along with a thermistor for each
 -We used insulation to cover the Cu leads of the thermistor. Due to space constraints in the hole meant for the thermistor we flattened the insulation beforehand. Once we were able to see the thermistor through the screw holes we screwed it in.
 -We soldered additional wire to the Cu leads of the thermistors
-Before assembling the heating segments onto the reflector, we covered it with styrofoam to prevent scratches on the polished Al surface.
 - Important: There are different sizes of screw involved: So a good practice would be to label the screw drivers and keep track of which size they are
 -Assembly of the 4 segments onto the reflector was challenging, due to the space constraints in inserting a screw driver/keys
 -New standoffs that will make this process much easier were designed by Bruno and is on the way
 -We then the 4 segments on to the back of the reflector
-Then we moved this to the orange lab , put the top cover of the reflector on and assembled it on to the stand . (Again, keeping track of screw drivers, will make your life easier)
-We labelled the 4 quadrants of FROSTI-LITE : Weiss,Thorne,Barish and Drever

FROSTI-LITE Power supply
-Each segment has its own  PCB power supply, but they’re all connected to the same main power source . All 4 PCB’s are at constant voltage
 -Bruno made a 3D printed box to house these PCBs 
-We also have a voltage divider circuit to measure the temperature of each thermistor
 -We give a known voltage across both resistors, where one resistor is known and other is the thermistor, from the voltage reading of the middle of the two resistors you can find the resistance of the thermistor which can be translated to a temperature using the data sheet 
 -Bruno also made 3D printed host boxes for these circuits as well
-In order to extend the Nichrome wire from the heating segments to the power supply we attached more Nichrome wire via crimps (Because soldering Nichrome wire is hard). Bruno made a 3D printed box to host these crimps (we used peak screw terminals) 
-Finally we also used a teflon tube to make all the leads go through (this was to make it less messy)

Translation stage Scanner code
-The gui required to operate the thorlabs translation stage is :https://git.ligo.org/tcs/frosti-scanner
  -We used the gui in: lts300_apt -> scanner_gui.py
-Follow the steps in the git repo and install the thorlabs kinesis software, NI-VISA  along with a software for the PM100 power meter
-The scanner_gui code has pre written COM ports for the LTS stages: Change that to the COM ports(of the LTS stages ) identified by your computer
 -If your on a windows and your computer does not give a COM port for the LTS stage, you can enable a virtual com port as follows
Find the controller device under “USB controllers”, it might be called “Thorlabs APT controller” or something similar
Right click-> Properties-> Advanced tab and check the “Load VCP” box
“OK” out of the dialog box
Unplug and replug the USB connection and a new COM device should appear
-In addition, if the scanner_gui does not recognize the power meter :switch Thorlabs PM100D mode from TLPM to PM100D NI-VISA with Thorlabs Driver Switcher (This can be done using the power meter software from thorlabs)
-We also adjusted the positions of some buttons on the gui, by manually editing the code 

Thermopile (S401C - Thermal Power Sensor Head, Surface Absorber, 0.19 - 20 µm, 10 µW - 1 W, Ř10 mm )
-We removed the housing of the thermopile to prevent clipping from FROSTI-LITE signal
-A IR filter (T-WG71050-E4 - Ř1" ZnSe Broadband Precision Window, AR Coated: 2 - 13 Μm ) was added on top of the thermopile sensor array

FROSTI-LITE Initial tests
Initial test scans from FROSTI-LITE, show that the radius of the annulus where intensity is maximum is around ~92 mm, which is close to numbers predicted by cao
The total radiant power is ~14  W, for around 50W of input power (all segments combined)



Images attached to this report
Comments related to this report
Bruno - 09:43, Thursday 04 December 2025 (12115)
The Thermopile detector plane was 58mm from the curved edge of the reflector housing. 
SQZ General
dmdesant - posted 18:55, Monday 10 November 2025 (12102)
LASTI Squeezer Update: 9.6dB observed but limited by unkown loss somewhere

Eric, Anders, Daniel

We are long overdue for a formal alog post for the LASTI squeezer, so here is our current status

Over the past few weeks, we have been installing an LO mode cleaner cavity before our homodyne detector. This process involved rebuilding a lot of the readout and locking PD table next to the chamber. In this process, we have been able to clean up the LO mode considerably and thus improve our homodyne detector's visibility. As of last Friday, we are fairly consistently able to align the homodyne detector up to the 99% level of visibility - something we could not realistically achieve before adding the mode cleaner. On Friday, using a detuned LO, we measured the visibility after careful alignment to be (based on PD1's voltages):

Vmax Vmin Visibility
1.99 V 0.01 V ~99%

This corresponds to a homodyne detector efficiency (n_HD) of 98%, or a loss of 2%.

Furthermore, we remeasured the escape efficiency of the OPO in the current position (0.614mm stage readback). First, we measured the front-seed path mode matching:

Mode CLF PD (Transmission) Voltage
TEM00 937mV
TEM01 35mV
TEM10 95mV
HOM1 170mV
HOM2 65mV
Background 17mV

This scan corresponds to a mode matching of 75.6% into the TEM00 mode. Next, measuring the reflection dip from the front seed path:

Off-Resonance REFL Voltage 6.49V
On-Resonance REFL Voltage 5.89V
Background REFL Voltage 13.7mV

This corresponds to an on-resonance cavity reflection coefficient of 90.8%. Using this result, we can infer the additional intracavity red losses to be ~0.28%, which is about 1000ppm higher than the AR coating loss we measured in this alog and verified in this alog.

This loss equates to a 97.05% escape efficiency, which is down almost 0.7% from when we last measured it. It is possible that some of the above measurements were made in error, but it seems like our cavity's red losses have nearly doubled from our last characterization of them. Nevertheless, we pushed forward anyway to try and characterize the squeezing we could detect now.

We then set up the squeezer and measure squeezing and antisqueezing over a wide range of nonlinear gains by adjusting pump power. The resulting spectra are trace-averaged 400 times in the SR785 before being exported. Then, for each datapoint (sqz and antisqz spectra pair) we compute the average squeezing and antisqueezing level (in dB) over a band starting at 1kHz and ending at the top-end of the measurement bandwidth (~30kHz). This average is computed after removing spurious tones from the data that exceed 3 standard deviations from the initial mean squeezing over this band (for simplicity). This data is then fit to the theoretical curve for lossy squeezed light detection here.

According to this data, the result is a surprisingly low overall detection efficiency of 90.1%. Our expected detection efficiency (assuming a PD quantum efficiency of 97% and 0.5% path loss ballpark to the homodyne PDs) should be more like 91.8% (n_esc*n_HD*n_PD*n_path). This indicates that we have a loss of around 1.8% unaccounted for in our calculations and measurements - even with the degraded escape efficiency. I am beginning to wonder about how good the quantum efficiency of the photodiodes in our homodyne detector is at the moment - we may want to consider retroreflecting their reflections back with a mirror to see if we observe any improvement here (like Roman Schnabel's group). Moreover, it looks like we have some measurable phase noise now which shouldn't be too hard to track down.

Nevertheless, our best real squeezing observed to date can be seen in the plot here (anti-squeezing is missing as I failed to properly save the antisqueezing spectrum data for this point somehow). Hopefully as we continue to wrap up the build over the next couple weeks, we will find the cause of this loss/phase noise, as removing it would very likely make observing 10dB of squeezing very doable without too much strain on the OPO. 

Images attached to this report
LASTI General
Bruno - posted 17:36, Thursday 06 November 2025 (12100)
Knife edge damage on vacuum bake oven
11/6/25 - Inspected Knife edge of the rear flange removed yesterday and found a potential culprit. 

Using a 3d printed microscope covered in UHV foil I found a single nick that crossed the knife edge.  

Also inspected the copper gasket itself with the same microscope and noticed a line going across the depression in the gasket.

Notes: I have no scale for the size of the scratch aside from that fact that it is difficult to see at 50x magnification.  

The lighting for this setup needs to be coming in parallel to the knife edge in order to see the shading from radial depressions. 

Have not checked the chamber side knife edge yet, but I didn't feel anything with a microfiber cloth + fingernail test.





Images attached to this report
LASTI General
richard - posted 12:06, Thursday 06 November 2025 (12099)
Buzzing AI board

  I found an AI board in the box that is filtering the HAM-ISI drive signals that had a channel that was buzzing at 2Mhz. There are two boards in this chassis and this was the one that is driving the 6D laser control, but the signal was getting into all of the channels. I swapped the board with one from one of the unused boxes in the E-shop and sent the bad one to caltech for TLC