Displaying reports 1-20 of 1025.Go to page 1 2 3 4 5 6 7 8 9 10 End
Reports until 18:36, Friday 20 November 2026
IntegratedPhotonics Chips
melissa - posted 18:36, Friday 20 November 2026 (12313)
Squeezing measurement versus NLG prediction; a scan speed-dependent NLG drift

[ melissa, chaejin ]
Chip ID: SQA run PhM 1 device 18 

Our BHD visibility drifted down to 80% over the course of our squeezing measurement (limiting squeezing to 2 dB), but we decided to analyze the data and compare to our nonlinear gain (NLG) scans which serve as a classical probe of the parametric gain.

We start by fitting the 780nm scans to learn the intracavity photon number ( comes into the Hamiltonian like g0 sqrt(n) a^dag a ). These scans are Transmission through the waveguide @ 780nm versus heater voltage (converted to frequency detuning) for different power levels. Then we fit the NLG scans, which are collected simultaneously. This fit parametrizes the nonlinearity g0, nonlinear loss, among other things like waveguide interference, and allows for a prediction of the measured squeezing vs experiment. Then only the detection efficiency is the final free parameter in the fit against the squeezing data. We plot against NLG contrast (min NLG / max NLG) because we find there is a change in the max NLG when we stabilize on-resonance, likely due to a temperature-dependent interference phase that manifests elsewhere in our model. NLG drop vs sweep rate confirmed with measurement. 

g0 = 1.969 MHz/sqrt(photon)
gamma1 = 0.0011 kHz/photon 
gamma2 = 0.0512 × 1e-9 GHz/photon^2

where we have the loss model:
kappa_i(n) = kappa_i_0 + gamma1 * n + gamma_2 * n^2
These two loss rates can act a bit degenerate in our data set so we will need to co-fit data sets versus wavelength and across devices.

Detection efficiency fit: 0.55
Loss budget: 0.558

Loss budget component Value Note
BHD Visibility, V = 0.80  0.640  re-measured after squeezing measurement
Bus waveguide propagation (~1.6 mm) 0.94 estimated from kappa_i (~0.5 GHz)
Output facet (Fresnel) 0.975 measured from transmission Fabry-Perot fit, assuming symmetric facets
Free-space optics chip -> BHD 0.98 Nominal free-space optics losses
Detector Quantum Efficiency 0.98 nominal spec, within error bars of responsivity measurement
Dark noise (~20 dB clearance) 0.99  need dedicated measurement... estimated on the ESA. 9.9 mW LO power
Loss budget 0.558  

Note:
-Have since added a PBS before the NLG measurement photodiode to remove background due to orthogonal polarization

To-do:
-Code up a gated swept squeezing measurement, to directly compare against swept NLG data 

 

Images attached to this report
CoupledCavity General
mrtodd - posted 16:42, Friday 20 November 2026 (12312)
Mid-Y door and test cavity work

M. Todd, M. Richardson, S. Park, R. Mittleman, E. Oelker

This morning, Eric, Rich, and I put the Mid-Y front door back on after I spent some time at the last minute to get the YAW picomotor working (at this point ITM pit and yaw picos both work). I bagged up a bunch of parts but still need to label them.

This afternoon, Mitchell, Sun and I attempted to realign the cavity. I had already mostly aligned the prompt REFL beam using the ITM picos. Mitchell and Sun removed the ETM so that we could realign the input beam to hit the first output steering mirror and keeping the beam on REFL with the ITM pico. Then we got the beam centered on the TRANS camera and PD, before adding the ETM back in. We struggled to find the ETM reflected beam for awhile but Sun recommended we use the IR viewer, and that proved super useful. I could immediately see we were way off the ITM and we used it to move the beam back to the ITM and then continued bringing the sequential bounces on top of one another. Before long, we had the cavity flashing and I touched up the input alignment and ITM pico and we had a great error signal. 

Then Mitchell and Sun re-wired everything to get the cavity locked. We took an OLG measurement of the lock, and it looks pretty much identical to the previous setup; the only difference is needing a slightly higher overall gain in our servo (20dB), but we still had the same UGF (~30kHz) with 45deg phase margin.

IntegratedPhotonics Chips
melissa - posted 20:20, Thursday 19 November 2026 (12311)
BHD specs between SQA squeezer and Helens mode-match chip

[ melissa, chaejin ]
Chip ID: SQA run PhM 1 device 18 

Specs of the balanced homodyne detector (BHD) for our Nov 19 squeezing measurements
Power before/after the mode-matching chip (Helens run, straight waveguides): 1.5 mW / 0.94 [ ~63% ] consistent with single-fact coupling efficiency + some fresnel reflection order of a few percent
1560 AOMs set to -1 dBm each at 80 MHz (up/down), ~216 uW after the squeezer chip (input objective focus optimized for 780nm pump)
Visibility is measured at 91.83 % +/- 0.61 % between the SQA and Helens run chips
Lower than our max of ~97% Helens-Helens, so likely the different chip thicknesses reduce the outcoupled mode overlap.

Visibility over time (pump blocked):
13:48  | 91.49 % +/- 0.82 %
14:00 |  91.03 % +/- 0.81 %
14:15 |  91.14 % +/- 0.78 % [taken before the measurement]
16:18 | 79.68 % +/- 0.60 % [taken after the measurement]

At 350 mW setting on the EDFA, the LO power after the chip is 9.9 mW. Results in about 20 dB shot noise clearance @ 5-10 MHz, which is a quiet band for us today. Our RF noise environment picked up by the detector seems to change day to day, we will record the variations in a later log. 

Will perhaps swap in a SQA mode matching chip to try to increase visibility (SQA-SQA) if the squeezing result looks sensible. Post on the squeezing data/modeling to follow.

CoupledCavity General
mrtodd - posted 16:17, Tuesday 17 November 2026 (12310)
Mid-Y seismic data

M. Todd, E. Oelker

This morning, Eric and I balanced the mid-y table after putting the seismometers down. We took some L4C data while it was unbalanced as well, but the differences were really only below 0.5Hz-ish as far as I could tell. I've also put the Mid-Y and End-Y spectra together on one plot for referencing later.

The RMS of the angular DOFs are of particular concern, as our ASC loops will need to essentially have a bandwidth of ~20-30Hz if we want to suppress the ITM misalignment below 100nrad.

Non-image files attached to this report
LASTI General
mrtodd - posted 16:02, Friday 13 November 2026 (12309)
Mid-Y chamber door move

M. Todd, R. Mittleman, E. Oelker, K. Kuns

Today, we put the back Mid-Y door back on and took the front door off. Next week we'll move the remaining L4Cs into the Mid-Y chamber and then close the door back up before the holidays.

CoupledCavity General
mrtodd - posted 17:57, Thursday 12 November 2026 - last comment - 18:14, Thursday 12 November 2026(12307)
Mid-Y chamber work

M. Todd, E. Oelker

I re-ran a PDH scan and analyzed it to see if our calibration factors were still consistent for our noise measurements. It seems like we've lost a good chunk of our PDH gain, but it definitely be from a different input power / alignment as I have not been rigorous maximizing the aligned TRANS peaks. Regardless, I used the calibration factors (PDH gain, PZT gain, cavity length [did not change]) to get the suppressed frequency noise and the control signal. With some basic loop algebra, the suppressed frequency noise is just the loop suppression times the displacement noise and the control signal should be the close loop gain times the displacement noise. Looking at these, this seems to be sensible, as the control signal seems to mostly follow the table motion as we would expect for our high gain loop.

This afternoon, Eric and I moved three of the L4Cs into the Mid-Y chamber and plugged the cabling into the feedthrough panel. We ID'd each L4C signal so we know which sensor is connected to each ADC channel. We need to put the three cables left for the other L4Cs as far to the other side of the table as we can so that we can put the back Mid-Y door on and take the front one off. 

Non-image files attached to this report
Comments related to this report
mrtodd - 18:14, Thursday 12 November 2026 (12308)

I've got it setup to the cymac right now that CH1 is L4C0 (in X), CH2 is L4C1 (Z), CH3 is L4C2 (Y). The next ones should be Z, Y, Z, as was setup in the End-Y chamber.

CoupledCavity General
mrtodd - posted 11:57, Wednesday 11 November 2026 (12306)
Frequency Noise Measurement of Test Cavity

M. Todd

I realigned the cavity now that we let the air back in and took some frequency noise measurements along with some seismic data. I used the SR785 to take the error signal spectra which I calibrated into Hz with our PDH gain disriminant. I calibrated the longitudinal (dof Y, in this case) table motion into Hz using the cavity length. This PDH scan is a little old but hopefully still mostly fits since we're using all the same settings. For reference I plotted the free running NPRO heuristic noise curve as well. From the OLG, our UGF is around 20/30kHz.

Some interesting features are these 10.5 Hz harmonics, which I reckon are most likely fans spinning or something. Additionally, around 7-8 Hz we see a broad peak which could be from the vertical resonances of the stack. I'm interested in getting the table motion data for the Mid-Y, as it may lend a clue to the broad peak at 2Hz.

 

Non-image files attached to this report
LASTI General
mrtodd - posted 21:01, Tuesday 10 November 2026 (12305)
Mid-Y door off

M. Todd, K. Kuns, R. Mittleman

We took the Mid-Y rear (closest to back wall) door off today and clamped it to the test stand, such that the other Mid-Y door could be put next to it if necessary. We still need to make sure the chamber o-ring is reset, as we think some if it may have come out of it's seat. Tomorrow I will take some data of the End-Y HAM table motion and then we'll start to move things around Mid-Y to get ready to move half the L4Cs into Mid-Y.

I also want to see if the frequency noise in-lock of our test cavity is significantly worse with two doors off.

GRAVITES General
dorot3a - posted 14:59, Tuesday 10 November 2026 (12304)
FBG PDH block diagram (planned)

Attached is a block diagram of the current plan for the bragg grating pdh lock, currently not including any switches-- I'm planning to get the lock itself working and tested before moving on to any kind of digital logic. Since the modulation frequency is too high for the internal signal generator on the red pitaya, the discriminator is built separately from minicircuits components and the FPGA is just used as a controller and to measure transfer functions.

A SG382 is used to drive the EOM at 400MHz via a minicircuits RF splitter. The second splitter output is sent to a voltage-varying phase shifter; the output of the shifter is mixed with the refl RFPD output on a minicircuits mixer and then lowpassed before being sent to an input on the FPGA. The phase delay is controlled by the available red pitaya output (via an amplifier) so that I can programatically sweep the phase delay to optimize the error signal. The feedback to the laser is produced by an RP PID block, then amplified. I'm currently using the second monitor output from a servo common board with modified gains to match the RP output range to the input ranges on the phase shifter and laser pzt. 

Right now everything here is built as shown in green lab with the exception of the phase shifter, which hasn't arrived yet. All optical components shown are in PM fiber. The beam splitter is currently a 99/1 with the 1% output continuing to the circulator.

Images attached to this report
LASTI General
mrtodd - posted 16:47, Friday 06 November 2026 (12303)
HAMY vent valve open

I opened the vent valve at the YHAM at 16:46, hearing faint sound of air returning and checked the pirani gauges which confirm that pressure is returning.

LASTI General
bruno - posted 11:24, Monday 02 November 2026 (12300)
SENSIT HOKI arm length calibration
HOKI Interferometric Sensor – Arm Length Measurements

Attached is a PDF showing the measured distances between the two arms of the HOKI interferometric sensor.

The mass is suspended at a fixed distance from the tablecloth that supports the sensors, so the HOKI reference arm must be adjusted to match this nominal distance within approximately 1 mm.

Unfortunately, the distance from the beamsplitter to the reflector on the mass is approximately 37 mm, while the reference arm is already at its maximum extension of 35 mm.

All distances are measured to the tip of the curved section of the retroreflector.

Measurements:

Reference arm length: ~34.5 mm (maximum extension)

Beamsplitter to front of mounting plate: ~8 mm

Front face of tablecloth to reflector: ~28.5 mm

Total distance from beamsplitter to reflector: ~36.5–37 mm

This leaves a discrepancy of approximately 2 mm between the two arm lengths, which exceeds the required tolerance.
Non-image files attached to this report
tSQZ General
alossius - posted 20:24, Sunday 01 November 2026 (12259)
telecom squeezer logbook initialization

(A. Lossius)

LOGBOOK INIT

This 'tSQZ' logbook will be used to track the contruction and operation of the telecom-wavelength free-space squeezer in NW22-161. 

A schematic of the current optical design can be found here.

Current status:

Current projects:

Future projects:

Images attached to this report
Non-image files attached to this report
GRAVITES General
dorot3a - posted 19:25, Friday 30 October 2026 - last comment - 19:53, Friday 30 October 2026(12298)
1550 frequency lock connected (loop not locked yet)

I set up all the electronic components for the filter lock and confirmed that everything is talking to each other-- I just need to actually assemble the loop. Setup is as follows:

Signal generator at 400MHz, 10dBm -> RF splitter (max 400MHz): Out 1 -> phase shifter -> LO input of mixer, Out2 -> -25dB attenuation -> EOM (Vpi is 2.7V). 

Optical components:

From laser: faraday -> 95/5 BS. 5% out -> polarizer -> EOM -> circulator 1. Circulator 2 - > filter. Circulator 3 -> RFPD -> RF input of mixer.

Mixer -> LPF -> RP out1. Loop will be set up after this point. Out1 -> modified servo common board with Vofs = 2.5 (at output) and gain of ~2.4 from input to monitor 2; monitor 2 -> laser PZT in. 

I'm using the external signal generator/mixer because hundreds of GHz is too high for the RP internal ASG; the modulation is at 400MHz because that's the highest BW mixer I could find. I'm a little worried about only using 400MHz (or even 500) because the FWHM of the filter is only about a GHz and this mod freq is still very much in the linear region of the filter, but we'll see. Repurposed servo board is being used as a summing amp because the RP outputs -1 to 1V and the laser PZT input range is 0-5V. 

 

Comments related to this report
dorot3a - 19:53, Friday 30 October 2026 (12299)
Images attached to this comment
LASTI General
dennis.martynov - posted 09:31, Thursday 29 October 2026 (12297)
C-6D discharge time vs humidity

During the C-6D installation at LASTI, we encountered a fused silica charging problem in the cleanroom (log 11846), which Peter & Rich helped us resolve with an ion gun.

As we have not observed this issue in Birmingham, we measured the fused silica discharging time at various humidity levels, keeping the temperature at 20.5 C. Under typical laboratory conditions (45–50% RH), the discharge time is 1-6 minutes. We then placed the fused silica ring in a box containing silica gel beads to reduce the humidity to 39–40% RH. Under these conditions, the discharge time increased to 1.7 hours.

This lower humidity range may be representative of the conditions in the Lasti cleanroom. Does anyone have a measurement or estimate of the relative humidity and temperature in the Lasti cleanroom? With these values, we could normalise the water vapour pressure to our measurement temperature for a more direct comparison.

It might also be worth considering installing an ioniser bar in the cleanroom, similar to the example shown in the attached picture. In our cleanroom, the discharge time decreases to around 17 seconds when the ioniser is switched on.

 

Images attached to this report
Non-image files attached to this report
IntegratedPhotonics Chips
melissa , chaejin - posted 20:18, Monday 26 October 2026 (12293)
InGaP squeezer microring chips
(melissa, chaejin)

PhM 1 device 18: 780 resonance and 1560 nonlinear gain vs pump power

Chip ID: PhM 1 device 18 (InGaP microring from our collaborator Lilli Thiel from UCSB. Designed to pump at 780 and generate squeezing at 1560, has a separate bus waveguide for each pump and squeezed light)

Setup: one 1560 laser -> SHG for the 780 pump, and -> AOM for a weak 1560 seed. We sweep the on-chip heater across both resonances and record the 780 transmission and the 1560 transmission at the same time, for pump powers 1–240 µW. The AOM makes the seed phase sweep, so the 1560 trace oscillates between the amplified and deamplified quadrature; Melissa and I call its envelope the "NLG envelope" (because it is non linear gain envelop). setup sketch attached

Model: Chi(2) parametric gain g = g_0 * sqrt(n_780) where n_780 is number of 780 pump photons, plus thermal red-shift linear in n_780 and power-dependent 780 intrinsic loss \kappa_i(n). For each power we read T_min (minimum transmission of 780) and its detuning from the 780 dip (as a function of \kappa_i, n_780) and the two envelope values at the 1560 resonance (where we model g).

Results: cold cavity 780 and 1560 fits. 780 shift is linear in power where we fit thermo optic pulling coefficient K. 780 T_min is non-monotonic in power; this is not loss but a facet Fabry–Perot whose phase drifts with heating — with it included \kappa_i is constant and no TPA/FCA up to 240 µW. 1560 amplification reaches +6.6 dB at 240 µW, proximity to OPO threshold here is \rho ^2 ≈ 0.2, g₀/2π ≈ 2–4 MHz/√photon depending on the loss model.

Next: model and remove the facet FP (Lilli is measuring the 780 bus FP for 4 waveguide lengths). We can consider that only absorbed pump photons heat the ring, so the thermal shift should be written vs absorbed power rather than n_780

Images: setup sketch, cold cavity fits (780, 1560), 780 T_min and detuning vs power, facet FP fit, max NLG vs power, NLG envelopes, Proximity to threshold \rho vs n_780.
Images attached to this report
GRAVITES Optics 1550nm
dorot3a - posted 18:37, Monday 26 October 2026 (12292)
1550 laser frequency lock components assembled

(Dorotea, Sun)

Our FBG filter arrived today and Sun and I set up the components to lock the 1550 laser; picture of the layout attached. We'll likely end up using one of the ext clock Red Pitayas instead of the one pictured; also note that pyrpl has had some updates recently so my previous logs about working with them may be out of date.

Images attached to this report
LASTI General
mrtodd - posted 21:07, Friday 23 October 2026 - last comment - 12:40, Monday 26 October 2026(12287)
YARM pump down

M. Richardson, M. Todd, K. Kuns, E. Oelker, R. Mittleman


We put the Y-HAM far end door on. Erik torqued the feedthrough flange and Kevin and I torqued the viewport flange. We used 180 in.lbs. After closing the vent-valve by the Y-HAM to 170 in.lbs. (last vac notebook entry had it around 172 in.lbs), we began to pump down with the two roughing pumps at 16:45.

Approx 17:10, the roughing pump out flow temps are around 77degF and the YARM pirani gauges are reading around 80torr.
Approx 17:50, the roughing pump out flow temps are around 82degF and the YARM pirani gauges are reading around 2.5torr.
At 18:00, we've closed all the valves and shutoff the roughing pumps, and left the water running for ~15min before shutting off. We'll come back in an hour and check the pirani gauges to see if we've got any obviously bad leaks.

At 21:00, 3 hours after shutting off the roughing pumps, the pirani gauges are reading 3.02 and 2.86 torr. 

I ran a quick seismic measurement with the L4Cs in the Y-HAM, and they do not show much difference to the pre-door-on/pre-pumped state; so the motion between 2-10Hz may really be the stack resonances moving things around.

Comments related to this report
mitchell - 12:17, Saturday 24 October 2026 (12289)
Checked on the pirani pressures today: 

12:14pm TCA = 3.10 and TCB = 2.95
mrtodd - 08:57, Monday 26 October 2026 (12290)

Checked the pirani gauges this morning: TCA=3.22, TCB=3.07torr

eoelker - 12:40, Monday 26 October 2026 (12291)

Noticed that the valve between the YARM chamber and the foreline was left open, so these pressure readings include a small section of the foreline and a few KF blanks.  

Displaying reports 1-20 of 1025.Go to page 1 2 3 4 5 6 7 8 9 10 End