Displaying report 1-1 of 1.
Reports until 21:07, Friday 23 October 2026
LASTI General
mrtodd - posted 21:07, Friday 23 October 2026 - last comment - 12:40, Monday 26 October 2026(12287)
YARM pump down

M. Richardson, M. Todd, K. Kuns, E. Oelker, R. Mittleman


We put the Y-HAM far end door on. Erik torqued the feedthrough flange and Kevin and I torqued the viewport flange. We used 180 in.lbs. After closing the vent-valve by the Y-HAM to 170 in.lbs. (last vac notebook entry had it around 172 in.lbs), we began to pump down with the two roughing pumps at 16:45.

Approx 17:10, the roughing pump out flow temps are around 77degF and the YARM pirani gauges are reading around 80torr.
Approx 17:50, the roughing pump out flow temps are around 82degF and the YARM pirani gauges are reading around 2.5torr.
At 18:00, we've closed all the valves and shutoff the roughing pumps, and left the water running for ~15min before shutting off. We'll come back in an hour and check the pirani gauges to see if we've got any obviously bad leaks.

At 21:00, 3 hours after shutting off the roughing pumps, the pirani gauges are reading 3.02 and 2.86 torr. 

I ran a quick seismic measurement with the L4Cs in the Y-HAM, and they do not show much difference to the pre-door-on/pre-pumped state; so the motion between 2-10Hz may really be the stack resonances moving things around.

Comments related to this report
mitchell - 12:17, Saturday 24 October 2026 (12289)
Checked on the pirani pressures today: 

12:14pm TCA = 3.10 and TCB = 2.95
mrtodd - 08:57, Monday 26 October 2026 (12290)

Checked the pirani gauges this morning: TCA=3.22, TCB=3.07torr

eoelker - 12:40, Monday 26 October 2026 (12291)

Noticed that the valve between the YARM chamber and the foreline was left open, so these pressure readings include a small section of the foreline and a few KF blanks.  

Displaying report 1-1 of 1.