JD, Richard, Arnaud, Vermeer, Alexandra
HAMx front side door was opened yesterday, see timelapse.
The x2 CRS LPS from Birmingham were installed on CRS2 today. Those were built to give more range for the CRS with retroreflectors. LPS1 was installed on the left wing, LPS2 on the right wing. The 1550nm 1/2" mirrors from last install (log 12120) were unglued (snapped off), and retroreflectors were reinstalled offseted from the wing with long M2 screws (air baked overnight) so the distance is closer to the nominal 50mm (the closest we could do previously was 59mm given the old requirement of 70mm). For the light path and readout chain, we will use the spare cables from the Sensit experiment.
The 1550nm 1x8 splitters was installed in chamber, for SensIt and will be connected to the two LPS tomorrow. There is still some CDS issues and a long db9 cable to run from the LPS TIA to chaa 29-31 in the Sensit AA chassis in the m1sus rack.
More pictures can be found here: https://photos.app.goo.gl/zKqvGNVRHcv3qyeCA
Vermeer, Arnaud
Summary: CRS2 flexures is replaced, LPS coarse alignment complete.
While I replaced the CRS2 flexures, Vermeer connected the input of the 1x8 splitter (received from Birmingham) to the peek fiber coming out of the 1550nm SM feedthrough, 3 of its output to the Sensit LPS and 2 to the CRS LPS. We verified there was power getting out of each Sensit LPS visually with an IR card and on the DC power channel in CDS (channels 0,1,2 on ADC2 of the m1sus frontend or M1:LPS-SUS_H{1,2,3}_DC_IN1). We then borrowed 2 of those 3 readouts (H2,3) to align the CRS LPS. The process of aligning the LPSs was easy, we first found the return beam with an IR card and adjusted the LPS plate sideways to get fringes on CDS. We freed up the CRS to allow fringing and started the fine tuning process using the adjustable optic mount. Fringe visibility on LPS 1 : 85%, and LPS 2 : 61% (see ndscope screenshot attached, H2 channel = LPS1 and H3 channel = LPS2 ). We will continue fine tuning LPS2 tomorrow morning.
Left to do:
*cable up the CRS LPS to its AA chassis and label connectors
*balance and fine tune CRS2 frequency
*modify the m1lps simulink model to add the new LPS channels that will be connected to chans 29-32 of that same ADC card.
*pack and store the previous LPS + 1550nm mirrors
*verify CRS1 HOQIs are still working, now that HOQI SensIt is using a split of the light chain
*pack and store CIT 1550nm laser now that CRS is sharing Birmingham's setup
*update the CRS MIT wiring diagram