(A. Lossius)
LOGBOOK INIT
This 'tSQZ' logbook will be used to track the contruction and operation of the telecom-wavelength free-space squeezer in NW22-161.
A schematic of the current optical design can be found here.
Current status:
- PUMP and SEED/CLF paths have been installed. Initial PUMP alignment to cavity complete without cyrstal.
- OPO mirrors installed (including two PZT mirrors - wiring and electronics complete; with a 3D printed structure built for load management, seen here(1) and here(2)).
- Basic electronics for cavity lock installed; not yet tested (need crystal for better alignment).
- EDFA for PUMP setup. Currently operated from borrowed windows laptop - will install software on new lab desktop computer.
- 3D printed lid for OPO mirror encasing and OPO oven electronics designed and printed. CAD design here.
Current projects:
- OPO crystal oven and mount assembly: determining wiring for TEC and thermistors, then soldering, then assembling. Need to clean parts, epoxy thermistors, wire and install.
- Install 3D printed enclosure, with external wiring for OPO oven; nearly complete, see here for latest.
Future projects:
- design and cutout a baseplate for the up/down-shift AOMs along the CLF path (in fiber).
- re-evaluate / redo SEED/CLF mode-matching to cavity.