mrtodd - posted 12:04, Friday 11 September 2026 (12253)
Test Cavity Alignment Work

M. Richardson, M. Todd

Yesterday morning I tested the top phase shifter chassis on the rack with our LO. It seemed to only function when the 2ns toggle was enabled, and then you could use the other switches as desired. In powering the chassis I had to cannibalize the power cable for the LSC PD chassis as there were no others. After moving the cable back to the LSC PD chassis, Mitchell and I were able to generate a pretty good PDH error signal after a little alignment. We are sending 24dBm to the EOM and to the mixer (we may want to attenuate this a bit) and got this error signal.

We then hooked up the error signal to the servo board and tried adjusting the gain and offset from the computer. We were able to see this adjustment well by looking at the scope. We then disabled the feedback and connected the servo output directly the laser PZT. Adjusting the offset a bit and turning up the gain, and then enabling the feedback and boost stage we were able to see some very weak locking. It could hold the TRANS power for a second or so, as seen in the videos.

We will try and touch up the alignment a bit as well as servo settings to see if we can get any better locks before closing the door.

Images attached to this report
Non-image files attached to this report