mrtodd - posted 18:20, Tuesday 08 September 2026 (12248)
Test Cavity Alignment Work

M. Richardson, M. Todd

This morning I did a little bit of mode matching work to squash our even mode peaks, which was met with some success. The next step was to try and start getting some of the elctronics set up for looking at an RF error signal. With Eric's help Mitchell and I were able to setup the ISC PD chassis on the racks by the PSL and power the RFPD we found (18MHz but should work for our 20MHz EOM). Along with this came the benefit that the LIGO power strip now is connected to the Sorenson PS's for +/-18V.

We were not really able to see much on the DC channel of the RFPD in terms of REFL dips. After awhile, I think we realized we still have some alignment work to do so that we are sure we aren't clipping anywhere. Additionally we want to be sure that the promptly reflected beam is will overlapped with the cavity eigenaxis.