Reports until 14:17, Friday 28 August 2026
LASTI General
mrtodd - posted 14:17, Friday 28 August 2026 (12237)
Morning Test Cavity Setup

M. Richardson, M. Todd

We spent the morning trying to realign the TRANS path with OM1 (the mirror right after transmitting through the output coupler [OC]) so that we could see some signal on the TRANS PD. We were able to in the end, with the help of a foil wrapped power meter and all the lights off in LASTI. Mitchell found that relative to the alignment WITHOUT the OC, OM1 needed to be pointed up and to the right to bring the beam back onto the TRANS PD. We could not see anything with the TRANS camera however, even with all the lights off.

We then tried to walk the input alignment around to try and get the REFL beam back on the REFL PD and camera, but in that effort we lost the TRANS PD power, so we had to start over. Fortunately we were able to recover the alignment to the TRANS PD without the OC, and hopefully repeating the "up and to the right" offset with OM1 will repeat success on recovering the TRANS PD with the OC installed.

I think the better approach for getting the REFL beam back is adjusting the IC alignment. This will most likely change the deflection but can be recovered hopefully with the OM mirrors.