Reports until 18:53, Wednesday 26 August 2026
LASTI General
mitchell - posted 18:53, Wednesday 26 August 2026 (12235)
Continuing Test Cavity Setup
Mitchell R, Matthew T

Spent the afternoon today continuing to attempt to align the test cavity between the Y HAMs. We first removed the input coupler from the beam path (with the output coupler already having been removed), and aligned the beam onto the TRANS PD and camera. The output coupler was then placed back, and we were able to retroreflect the beam back onto REFL. The input coupler was placed back into the path, however we were not able to see any reflections between the cavity mirrors. Nonetheless, we aligned the input coupler with the promptly reflected beam, which was retroreflected and observed at REFL. Retracing the beam path at this point, we found the input coupler appears to have displaced the beam, as it is now missing the output coupler. We were unable to restore alignment by walking the beam. Based on this, we are beginning to suspect that the input coupler may be wedged, which we will confirm tomorrow.

Note: In the process of adjusting the input coupler, I bumped a clean Allen key off the Mid Y HAM table (at the end facing towards End Y). I think it has fallen to the bottom of the HAM, and will need to retrieve it before pumping down.