Reports until 09:59, Monday 20 July 2026
GRAVITES General
dorot3a - posted 09:59, Monday 20 July 2026 (12210)
Update on GRAVITES 2fl setup

Note-- the basement lab is referred to as the black lab; the 3rd floor lab as the red lab.

Attached diagrams and images show the state of the current 2fl setup in Vienna. 

I was able to finish assembling the 1542 components for the 2-floor interferometer before I left in June and confirm that we can lock both interferometers simultaneously with one arm including both an up- and downlink from the black to the red lab. We already knew in principle that it was possible to lock with the link in-loop as I had in the previous few weeks been able to lock just the interferometer with one arm in the black lab and the other in the red lab, but because we couldn't disassemble the old 50km setup in the red lab until after taking the filter measurements, I hadn't been able to assemble anything resembling the full 3-arm setup or take measurements with the upstairs arm thermalized.

Tom and I disassembled the old 50km ifo in the red lab and put the third 27km spool in the upstairs isolation box, but we found that the box had accumulated enough damage in the past year or so that it wasn't isolating as effectively anymore. While I was gone, Tom assembled a second, smaller shielding box that fits just the spool which now lives inside the larger chamber in the red lab. which helps with the ambient noise somewhat. Since the common arm is no longer in the same place, this passive environmental shielding will be even more important as we lose a lot of our common noise rejection.

With the 50km ifo disassembled, I moved all components of the interferometer except for the spool in the red lab down to the basement. This configuration means that we will have two lengths of the fiber link in the wall as part of one arm, so we won't get any common noise rejection there either, but it does allow us to have all of the control and readout electronics in the same place. There's a lot more space in the black lab, it’s a lot quieter, and not having to go upstairs to lock the second ifo makes things a lot easier so until this format proves itself to be an issue it seems preferable. I reconfigured the optics in the shielded room of the black lab to the 3-arm setup; a diagram is attached. We're still using my minimal 1-PD-2-actuator control scheme from 2 years ago to stabilize input polarization after the link, it's working pretty well to keep the input polarization to the IFO constant after the link to the basement. We have 2 of these loops running in parallel, which are not shown on the diagram, but do a good job stabilizing the polarization of all input fields. Pol control components aren't shown in this diagram for simplicity, but we also actually have a pbs on each photon output; we use a total of 8 snspds, adding the counts from each pbs output to make the photon counting measurements polarization insensitive. Components of each arm are color-coded for visual clarity as shown in the attached photos.

I was able to get fringes on both interferometers simultaneously to lock both at the same time on the day before I left my last visit, but performance seems to have degraded since, which I'm working on now. Right now I'm using the AOMs to balance the power coming out of each arm (necessary largely because of a particularly lossy delay line); we won't be able to do that later as we want to keep as many photons as possible. Each of the 3 arms is already within about 1dB of the others in terms of loss. We're waiting on the new delay line but we're now pretty well length matched and just waiting on the new delay line to arrive.

Images attached to this report