Displaying report 1-1 of 1.
Reports until 11:38, Sunday 31 May 2026
LASTI General
Denis Martynov - posted 11:38, Sunday 31 May 2026 (12190)
BIS stability study

It's been 150 days since the BIS diagonalisation was set (log 12122), one or two vents, and multiple thermal cycles. In summary, I think the 3 BIS stations (6 seismometers) inside the HAM platform have survived this well, and the sensor diagonalisation coefficients set back in Dec 2025 remain valid to the required precision of ~0.1%. A few more details:

The first figure shows the DC force on the inertial masses of 3 BIS stations + T240 for reference. In contrast to T240/STS-2 seismometers, BIS couples 10% of the DC integrator signal to the fast "velocity" channel to monitor the mass position via the same ADC channel. In total, there have been two "catastrophic" events during the period seen by both BIS and T240: Jan 23 and March 24/28. The latter one was a vent (log 12168), and I could not track anything obvious about the former event in the log, maybe power supply issues on Jan 29 (log 12134).

The C-6D in-vac temperature sensors (shown in orange) have been, unfortunately, disconnected on March 3rd. However, I think it is quite clear that both BIS and T240 follow a similar T profile to some degree. The integrator control signal was well within the range (~20% deviation of max): the V1-3 sensors should start to saturate at +/- ~5000 cnts in these units.

It is also feasible to spot that station 1 fluctuates on the more or less same DC level, while station 3 seems to creep down a bit during the first few months. The second attached figure shows the subtractions of the V1 signal (which contains the same T fluctuations) from the V2 and V3 signals. It seems that the V2 station, similar to V1, does not significantly creep, but the DC force shifted during the disturbances discussed above. The station 3 signal does seem to creep a bit during the observation period. In principle, we have remote recentering on BIS, but the DC offset is still rather small.

Then I looked at the BIS real-time signal to check the BIS diagonalisation. It seems that ISI has been moving quite a bit in tilt during the last few days, and T240 has been saturating. I then looked at data from May 24. The diagonalisation from Dec'25 still looks good with RX/RY signals below the BIS raw signals (that measure ~Z +/- 0.07 H) by a factor of 200 at 10-20 mHz, as shown in the third attached picture. The noise budget is shown in the fourth attached figure, and the sensors still sit close to the design sensitivity, at least, in the frequency band where we can subtract ISI's own motion, below 20 mHz.

 

Non-image files attached to this report
Displaying report 1-1 of 1.