[Bruno, Eric]
We're making some changes along the Y-arm to support the new coupled cavity expt that will be installed between the Mid and End-Y HAM chambers in LASTI. In the past couple of weeks the following changes have been made:
- Removal of the old PDE electronics racks. These were already decomissioned and were taking up a lot of space. I broke them down and we plan to put them in storage.
- Addition of 3x smaller racks. The new coupled cavity electronics will go in these racks. They are scooted forward a bit more so we have more room to manuver the end-y cleanroom
- Powering up the Mid-Y cleanroom. The blowers still power up without issue. We'll do a particle count next week
- New wheels for the End-Y cleanroom. Bruno swapped them this afternoon with these: https://www.mcmaster.com/2498T64/. We can move the cleanroom again
- Test: Uncovering the small door on the end-Y HAM. We rolled the cleanroom in the minus-Y direction and were able to uncover the small door on the End-Y HAM. See attached photos. When opening that chamber, this will allow us to get that door off easily and move it onto a stand with the crane.
Still some cleanup to do, but I think we're in good shape for going into the HAMs when Rich gets back from Vacation