Bruno - posted 18:52, Friday 17 April 2026 (12171)
Lasti Ham Y vacuum diagrams and operating procedure
HAM Y vacuum system startup procedure. 

Rich and I are putting together the pieces to start up the roughing and turbo system for the Y arm. Attached are some papers we found on the pump controllers. 

Some parts:
2 Thermocouple (Pirani) Gauges - Granville-Phillips
Ion Gauge - Granville-Phillips Stabil-Ion Gauge
Pneumatic Valve 
Pneumatic Valve Controller 
Gauge Controller - Granville Philips, 6 relay, RS232 out
KF40 Angle Valves x5
2 3/4 Conflat Angle Valve
Ts, Crosses, etc
B. Process Control

There are two main things that are controlled in the setup, the scroll pump and the pneumatic valve on the foreline which both protects the turbo and acts as a pseudo gate valve. These are controlled separately, each has a dedicated box. The wiring diagram is shown in figure IID.
There are two switches and a circuit breaker that can trip the scroll pump. The breaker is a 10 A breaker as specified by the manual. One switch is set to a turbo failure, the scroll pump will switch off in the event of a turbo failure. The other relay is on the Gauge Controller box and is energized when the pressure is below 5 10−3 torr. This protects against a major leak in the system.


The foreline valve is connected to a relay in the Gauge Controller set at 5 torr on the foreline pressure. This is to protect the turbo in the event of the scroll pump failure or someone opening the gate valve too fast. Note: If you are just starting the turbo at around 0.05 torr and you open the GV all the way too fast then this valve will trip. Read the Operating Manual.


II. STARTUP AND OPERATION PROCEDURE
The steps are as follows:
1.) Close the vent valve on top of HMY, USE A TORQUE WRENCH, the nominal value is 12 ft-lbs.
2.) Rough the main volume with the QDP 80’s to 5 10−2 torr
3.) Close the rough line, open the foreline valve, spin up the turbo, open GV.
4.) Pump with turbo, backed by the QDP to Psys ≈ 2 10−5 torr and Pfore to about 3 10−2 torr.
5.) Switch to backing with the scroll pump.

A. Roughing the Main Volume

To rough we use both QDP 80’s.
Make sure that the vent valve on the top of HMY is closed. It should be torqued to 12 ft-lbs. If it becomes a problem, torque it a few more ft-lbs.
Make sure that the gate valve is closed. This is 6 1/8 turns from the open position.
Check that the air line from the wall to the QDP 80’s is open, if not open it.

Close all valves on RF side.