Reports until 16:05, Sunday 29 March 2026
Frosti-Lite General
Evan Hall, Bruno Becher, Nelushi Vithanachchi - posted 16:05, Sunday 29 March 2026 (12165)
In air and in vaccum results for a single segment
The results of the in air and in vaccum results are attached.
The segment drever was mounted on to a bread board and inserted in a vaccum chamber. The segment was powered using a DC power supply. Images are attached.
Images attached to this report