SQZ General
dmdesant - posted 17:20, Wednesday 18 February 2026 (12140)
LIGO EtherCAT TEC Controller Functional in LASTI - Loop Parameters for VOPO Under Vacuum

[Daniel, Eric]

Eric and I have been fussing with the Beckhoff and various hardware for the past few days. As of now, were able to bring the LIGO TEC controller and MEDM interface back to life. With the chamber pumped down with just the mechanical pump, we were able to use these loop parameters at a pressur of 4.8*10^-2 torr.

Further testing with the chamber pumped down to ~10^-4 torr (with the turbo pump running) shows very little change in the step response. We are going to run this controller for now and get the squeezer back up and running.

Images attached to this report