Reports until 17:23, Tuesday 23 December 2025
LASTI General
Amit Singh Ubhi - posted 17:23, Tuesday 23 December 2025 (12121)
1D installation and 6D changes
The team from Birmingham (Amit, George, Lari) and Tsinghua (Yulin) came between the 12th Dec - 22nd Dec to install the 1D seismometers in the hutches, and to rotated 6D in RZ to allow us to transition fully into the low noise operation (500 Ohm impedance - per path - on all coils).

6D: After the vent, we noticed that the RZ control signal didn’t change, last year we though there was some weird behaviour where the RZ control in air and vacuum could be different, we believe this was likely due to air currents which caused this odd behaviour. The vent confirmed that the in vacuum and in air RZ position should be the same. 

6D managed to retain its control in the semi-low noise configuration using Lari’s 1mHz-500mHz bandstop coil drivers, and the impedances for the horizontal coils were H1 = 0 Ohm, H2 = H3 150 Ohm. 

I then transitioned 6D back into the high range configuration, i.e. no bandstop coil drivers, and 0 ohm impedance on all coils. When doing this the RZ control signal increased by nearly 2000 counts from ~4500 counts to ~6300 counts. This was odd, and we discovered that the 0 ohm impedance path for one of the coils was damaged resulting in only 2 of the horizontal actuators providing the control which explained the discrepancy. 

Before we discovered the impedance issue, we initially calculated that we had to rotate the suspension point by 30degrees counter-clockwise when looking from the top. After doing this the control signal reduced from ~6300 counts to ~4000 counts. It was determined that the fibre we used was slightly thinner than the previous fibre we had (the old fibre’s parameters were used to calculate the 30 degrees), resulting in a smaller RZ stiffness. After recalculating, we required an additional 45 degrees of rotation and were able to bring the RZ control signal down to a few hundred counts (some small changes have occurred, I think likely due to closing the door and suspending the ISI but the RZ controls signal didn’t change very much, currently at ~335 counts).

We resolved the impedance switch box issue and after pumping the chamber down, we have successfully transitioned 6D into the low noise (500 Ohm impedance for all channels) - this is compensated for in the COIL X,Y,Z,RZ,RY,RZ filter banks, where a gain of 24 is implemented for all. This gain is calculated via the ratio of impedances on the coil drive path where the coils have an impedance of 43 Ohm. Gain = (43 + 2*500)/43 ~= 24

Note that after we arrived back in Birmingham, Arnaud required an iop model restart. This caused 6D to lose its locked position, requiring me to re-catch it, this was done successfully. A note on this - because of the “dewhite” filter in the coil outputs, it causes large changes in the output coil values which saturate the DAC when the mass swings out of the BOSEM range, it is important that the gains of 24 are reduced to stop the saturations occurring, allowing the coil drive not to saturate so that the mass can be caught. 
- You should transition to RX/RY damp, RZ stays in catching mode
-  Gains of COIL_RX,RY,RZ should be reduced to stop the saturations, maybe as low as 5 but depends how quickly the mass swings through the BOSEM range
- Once the horizontal BOSEM signals are in range again, COIL_RZ gain can be increased back to 24
- Once vertical BOSEM signals are in range, COIL_RX/RY damp can be increased to 24
- RX/RY catch can be re-engaged

1D:
We planned to install our 1D seismometers in the HAM-ISI hutches. 
The 1D seismometers use a leaf spring design which has a pivot point (X-flexure) which constrains the end point motion of the leaf spring. By optimising the position of the end point of the leaf spring and the location of the pivot point, a close to zero-stiffness configuration is obtained. There are 3 stiffnesses that contribute to the system, the leaf-spring, the X-flexure, and the gravitational spring. 
We raise the centre of mass of our system to create a gravitational anti-spring, allowing us to increase the period of our seismometers, the final measurement of the periods are listed below, but they may have changed slightly when we closed the door and floated the ISI due to the small changes in the ISI tilt, however the change in ISI tilt when Rich locked the ISI was less than 0.1 mrad.

S1A - ~30s (close to unstable)
S1B - 13.5s
S2A - 16-17s
S2B - 14.5s
S3A - 12s
S3B - 9.7s

The periods are susceptible to the DC tilt position, as the centre of mass position changes, changing the total rigidity of the system. 

The seismometers are installed in pairs as a station (S1A, S1B) (S2A, S2B), (S3A, S3B). As the centre of mass is raised above the pivot point enables us to have each seismometer have a proportion of horizontal coupling in the measurement, this will allow us to decouple the pair of seismometers into independent vertical and a horizontal signal. The A seismometers are aligned closer to the centre of the ISI, and the B seismometers are further out. When looking from the top of the ISI, the free of the A seismometers point in the clockwise direction (fixed end to free end), and the B seismometers point in the counterclockwise direction. The ISI-Table figure shows the approx. locations and directions of the 1D seismometers, 6D, CRSs and T240.

The seismometers are sensed using an optical lever style configuration and are operated in a force feedback regime which is what we use for the readout of the seismometer.

Details on the design, assembly, and installation

Leaf Springs Properties: The leaf springs are made of Ni-Span-C, which has a programmable dE/dT (Young’s modulus with respect to temperature) through its heat treatment process. We have tried to programme them close to 0 to reduce direct temperature noise in the mHz band and below. Our Ni-Span-C leaf springs have some residual magnetism after heat treatment, which has a gradient across its length. We ensure we install the side with less magnetic coupling on the free end side of the seismometers. To further reduce the magnetic noise we install our seismometers in a Mu-metal shield which should reduce the magnetic coupling by ~200. 

X-flexures and Leaf Spring Clamping: When installing the X-flexures, their stiffness is highly dependent on how they are clamped. We had to ensure that we do not compress the X-flexures in anyway as this can result in a drastically different rigidity than what is analytically calculated. As all of our rigidities are in the 10s of mN m / rad region, the assembly is susceptible to these small clamping details. The same is true of the leaf spring itself, it was important to ensure the maximum height of the arc is equal on both edges of the leaf spring to ensure it is symmetric as possible.

Buoyancy: We tune the centre of mass position in the horizontal direction to make sure we require a downward force corresponding to -5.5mA of current in the force feedback coils. When we pump the vacuum chamber down, the buoyant force disappears which results in the DC current also reducing. We ended up with between -0.8mA to -2.5mA of current after pump down. We overestimated the current required for the buoyant force because their can be a small amount of creep due to the relaxation of stresses induced during installation which would cause the current to reduce even more in the coils (go towards 0).

Digital and Analogue: We set up the seismometers and tuned them by connecting them to CDS, repurposing the 6D input and output channels. However, once installed we transition them to an analogue servo where we readout the coil drive to CDS. There are 5 jumpers inside the analogue servo which control the gain on the coil readout to CDS which add up linearly (10, 20, 40, 80, 160). We currently use the 10 and 40 (10+40 = 50) jumpers to get a gain of 50 to improve the ADC noise in our measured signals. The resonance of the ISI and the UGF of the force feedback servos are close, so in the 10+80 gain configuration we slightly saturate the ADC every so often so we left it in the 10+40 configuration for now. 

Seismometer S2A coil direction: One of our pins which connect to the force feedback coil inside the seismometer station made contact with ground. This was not noticed as CDS drives differentially, so we still had control. However the analogue servo drives the coil relative to ground, and the drive pin was the one which had grounded inside the station. Unfortunately at this point the station was installed in the mu-shield and inside the hutch closest to the beam tube (the most difficult one to get the seismometer in and out from), and the hutch doors had been closed and torqued back to spec (28 ft lbs per bolt). Lari was able to resolve this by swapping the pins for the ground and drive on the cabling outside of vacuum. This means that this seismometer has an opposite sign compared to the other 5.

Slider coils: On the proof mass we have two separate coils, each wound in an anti-helmholtz configuration in 40awg wire with ~330 turns in each section. The magnets are attached the ground to reduce magnetic coupling to the seismometers. The second coil sits atop PTFE rails which allows it to slide. We can drive this coil with short DC pulses to change the horizontal centre of mass position and tune the DC current required for the force feedback coil. We did this before pump down to ensure we compensate for buoyancy correctly. This was required as the slider coil moved when we installed the Mu-shields and tried to move the stations from the ISI table to the hutches.

We need to diagonalise our seismometers now, this will be done in due course, along with the additional medm screens that are needed for blending with the ISI controls.

If there are any questions please get in touch with me and I can answer them and add them to the log.
Images attached to this report
Non-image files attached to this report