richard - posted 04:26, Wednesday 24 December 2025 (12120)
CRS installation on HAMX

[Tom Roocke, Arnaud] with help from Rich, Bruno (and the Birmingham team)

Summary: Last week (Dec 15-19) we assembled and installed two CRS (Cylindrical Rotation Sensors D2300100) on the LASTI HAMX-ISI. The CRSs had been shipped mostly assembled from CIT the previous week (see cit log 924). Mapping of the installation can be found under the wiring diagram and pictures under D2300465-v6 (also attached here in pdf1 and pdf2).

CRS balancing : The two CRSs were balanced on day 1 in a cleanroom in the Orange Lab. We used a +/- 1mm range IPS sensor mounted on the table with optic post, looking at the tip of the wing to measure and adjust the CRS resonant frequency (see picture1, picture2). The cleanrooms needed to be turned off to measure the resonant mode. On first hang, we used 14um flexures on one CRS and 15um on the other. After a few hours of balancing, one of the two CRS broke, and the other one next to it broke off instantly after from the shock wave through the table. We tried hanging the 3rd CRS with 13um flexures, but they tore apart at soon as we suspended the proof mass. The last two succesfull hangs were done using 18um (CRS1) and 17um (CRS2) flexures. We didn't need to adjust the vertical COM for the proof mass to be suspended with a reasonably low frequency (<25mHz) which means the COM position is very close to the design. Also, the new mass at the top of the cylinder to adjust the horizontal COM has proven very useful for balancing. While the IPS was useful for tuning the frequency, its range was too small, and the CRS wing kept touching the sensor. We should find another one with a larger dynamic range. We don't know why the first set of flexures broke. Maybe flexures <15 um are too fragile to handle? UW did their CRS locking test with a 12um flexure, so it's not clear. The ones we used were all baked at 120C for 48hours even though this should not have an effect on the material properties.

Electronics: On day 2 Tom modified the CRS preamp (D2300154) to allow the LPS readout through that same board with a 10k TIA and 1V bias voltage by respectively modifying R7 from 5kohms to 10kohms on preamps G, H, I, J, K, L and modifying R50 from 50kohms to 10kohms on all bias voltage regulators. Those gains were chosen based on the max bias voltage of 2V and max reverse current of 2mA (and a factor of safety of 2) on the LPS FCI-InGaAs-1500 pd (datasheet). The in-air breakout cables were also fabricated to connect the db25 to the various preamp inputs and dac drives. The 1550nm toptica laser is run with a laser driver D1200719, modified with a new R14 (value to check) to allow a deeper modulation depth. This chassis was borrowed from Birmingham.

CDS: A barebones m1isicrs was first created (thank you George!) and simulink blocks were added copied from CIT for the HOQI/CRS and from 6D for the LPS. The simulink models are under /opt/rtcds/userapps/release/isi/m1/models/m1isicrs.mdld which is not kept under svn revision. A HAMX-CRS screen was added to the LASTI sitemap to access to the various signals and filterbanks (see MIT_CRS_medm.jpeg)

Sensing: CRS1 is sensed with HOQIs loaned by UW (latest design D2500104-v4) and mounted on either side of the proof mass. CRS2 is sensed with LPS loaned by Birmingham, with a custom mounting plate and a 1/2" siskiyou mount as interface. As recommended by George, the retroreflector mounted on the wings of CRS2 was switched to a 1/2" 1550nm mirror epoxied with epotek-353ND cured at 150C in an oven. The displacement readout was commissioned for the HOQIs but not yet for the LPS. The tilt of the proof mass will be measured by taking the difference and dividing by 2 times the lever arm. 

Installation in chamber and sensor alignment: The two CRSs were moved from the lab to the chamber side. The sensors were mounted to the CRSs and plugged in their readout chain to check the signals were mapped correctly to their respective ADCs (see picture3). We also ran the light path to the CRS sensors chamber side to make sure it was making it all the way to the sensors. When those checks were done, we moved the CRS (while locked, very carefully) in the chamber as shown in the video linked here. The flexures did not break during this installation process. We aligned the sensors by maximizing their fringe visibility. This was a very long and tedious process for both set of sensors. We had to change the way the springs are loaded on the CRS legs to help us maintain the alignment when changing the plate position (as shown in the D2300448 redline). It is probably best to do the sensor alignment step in the lab (if a test stand with spare laser and preamps are available). The LPS were aligned by adjusting the siskiyou mirror mount pitch and yaw adjusters with the CRS locked in its middle position and modulated the laser frequency through the TEC driver by sending a 0.1Hz signal. For the HOQIs, to get fringes, we let the CRS swing by restricting the lockers to a few mm motion on the wings. After this step the CRS frequency was checked (with HOQI signals for CRS1 and IPS for CRS2) then locked for ISI balancing.

Since pump-down: On Saturday Rich and Amit balanced the ISI, closed the chamber, released the CRSs and started pumping down. The two CRS were showing signs of life, and the picomotors were remotely adjusted for rebalancing. While we have a displacement readout channel for CRS1, we rely on fringes for CRS2 to estimate motion until the demodulation scheme is comissionned. The frequencies of CRS1,2 were measured at 14.5mHz and 18.4mHz respectively (see fig1 and fig2). Damping with the capacitive plates was comissioned for CRS1 (see fig3) and a first low frequency spectra was measured, after digitally correcting for the ellipticity of the sensors see pdf3.

For CRS2, without a displacement channel and fringes visiblle for a fraction of the full CRS range it proved difficult to recenter remotely. After picoíng for about 2 hours last night, I eventually lost trace of it, even when going through a full rotation (we should see fringes since the CRS goes through a full cycle, but we don't). Something mechanical may have happened to CRS2. We should take a look in chamber via the viewports at next opportunity.

We will continue monitoring and commissioning the signals remotely. 