I'm overdue on an overall update on the switched setup for GRAVITES. In general, all the components have been chugging along towards being done in parallel, and should be done and tested quite soon.
- The input and output sections of the arms have been spliced and loss tested for a while (posted in an earlier alog). I will have to re-test everything soon, though, because I'm going to add the source switches before sending the boxes to Vienna. I'm also going to remove the piezo from the out of loop portion of the common arm since we need the second one on arm2 to test the switched configuration. I will also re-wind the piezo with ~20m of fiber to match the arm lengths. A spare piezo has been ordered.
- The most recent version of my switch drivers is built but not tested. I will update when they are tested (hopefully this week), but am pretty certain that the problem was a power issue, since the last iterations of the drivers worked fine if I only used one at a time (but this defeats the point of making the drivers in the first place). I've hopefully fixed this issue by having one board that produces the trigger signal from the signal generator, and then a stack of drivers (one for each switch) all of which have their own voltage regulator. This should also make the switching even less noisy, although I don't think that was going to be a significant issue in the first place.
- I figured out the issue with the second set of servo electronics that I built over the summer and fixed it (see my earlier alog). I also went and drilled the back panel the other day, so the whole box is ready for use. I still need to set up another high voltage supply for this one. I'm also planning to replace a few components that we were out of when I built them
- I moved everything but the long spools into the isolation box and set up and tested the common arm and arm1 with my input/output boxes, both of which work as expected. The arm length is only about 20m. We were always able to lock but only for a minute or so, but recently Eric determined that the drift we were seeing was a result of one of the signal generators being clocked incorrectly, now that this is fixed we stay locked for at least hours.
- Now that the second set of servo electronics is working, I'll set up arm2 and test that as well. Hopefully with the new switch drivers I should be able to run a test of the switched measurement (minus the source switching) within a week or two. With arm2 set up I'll do a noise measurement as well.
- I set up all the parts for the temperature control on the input/output segments, but when Begum went to configure it on the computer it was giving a nonsensical current reading, so I have to diagnose that soon.
I'm hoping to have all the components for the switched measurement (minus the long arms) done and tested within the next few weeks so they can be sent off to Vienna before the end of the semester.