dmdesant - posted 13:26, Tuesday 05 August 2025 (12032)
LASTI HD Visibility Improvement Efforts

Over the past few days, we have been trying to improve the visbility of the HD for the LASTI squeezer. One potential source of mode mismatch was thought to be LO polarization purity, so we went ahead and removed the HWP after our p-pol PBS and just rotated the PBS to transmit s-pol light. Checking the output polarization purity with a reference polarizer confirmed that the polarization is correct and very linear with little p-pol field. My best alignment attempts have yielded us visibilities between 94-96%. To spot check the mode matching, I aligned the HD as best as possible to a visibility of ~94.6%. Then, I used the Phasics camera to profile the beams from the POV of the photodiodes on the homodyne detector. We observed the following beam parameters

SQZ beam with VOPO locked to seed using red PDH loop (radial measurement on Phasics camera)

2W_0 96.4 um
Z_0 89.3 mm
M^2 1.15

LO (radial measurement on Phasics camera)

2W_0 129 um
Z_0 91.8 mm
M^2 1.21

In this measurement, the SQZ beam matched fairly closely to what I remembered measuring before. However, the LO beam has changed substantially since our last measurement. I am growing suspicious of the mating repeatability of the OZ-optics PM fiber we are using for the LO in the particular collimator package we used at the time. Furthermore, calculating the theoretical visibility limit for these two beams tells us that we should expect a visibility no higher than 95%, so this change in LO beam profile seems to be the majority of our limitation on detection efficiency currently. At this point we are looking into replacing the LO fiber and collimator combination with something more stable, as well as reoptimizing the LO path to correct the mode matching.

 

 