Reports until 12:02, Thursday 24 July 2025
SQZ General
dmdesant - posted 12:02, Thursday 24 July 2025 (12016)
7dB Squeezing in LASTI + Phase Noise Measurement

[Eric, Daniel]

Last week we achieved a state in the LASTI squeezer where we observed about 7dB of squeezing. The conditions for this were as follows

Pump Power 18 mW
VOPO Crystal Temp 32.32 C
CLF Power 60 uW
LO Power 1.5 mW
Stage Position  -0.690 mm (-0.780 mm Neg Lim Sw)
Homodyne Visibility 98.6 %

Here are the captured homodyne spectra (raw measurement, squeezing plot)

We saw around 13dB of antisqueezing in this state, but unfortunately no trace was captured as the VOPO TEC leads disconnected again mid measurement. They have been temporarily repaired, but it seems like the TEC leads may be long enough that they are rubbing on the lid of the cavity so we are leaving that off for the time being until we replace them.

We also captured the I/Q data from the LO and CLF loop demodulators to get an idea of how the phase noise looked at the same time. Here is the post-processed phase noise breakdown. So far, it seems that over 100kHz of bandwidth our integrated RMS phase noise for both loops is as follows

Loop Locked In-Loop Phase Noise (RMS)
CLF 9 mrad (mostly from servo bump)
LO 0.9 mrad

Inbetween this and yesterday, Eric noticed that the SHG cavity was misaligned and in fixing that, he was able to get much more pump power over to the squeezer table. Characterizing the NLG our current (seemingly good) spot as a function of pump power incident is shown here

Pump Power (mW) NLG Temp (C) Stage (mm)
6.8 3.0 32.32 -0.781
18.0 10.57 32.12 -0.781
26.4 36.4 31.96 -0.781
26.4 38.6 32.08 -0.7693

We are now no longer limited by pump power and can achieve very high NLG with more modest pump powers. With this data, we plan to characterize squeezing as a function of NLG to determine whether we are phase noise or loss limited and by how much.

Images attached to this report