eoelker - posted 17:47, Wednesday 16 July 2025 (12002)
E-870.1G Controller for site PI stages

I'm ready to characterize the nonlinear gain and escape efficiency of the H1 Spare VOPO, but ran into a roadblock when I couldn't move the translation stage!  Turns out that the stage without the sensor requires a different controller.  Fortunately, I was able to find one buried in the Orange Lab.  After contacting PI for the pinout, I was able to make a cable to connect to the site stages and move them.  Everything is set up to run on the Beckhoff machine now.  

There was no manual for the controller available online.  I had to get that from the manufacturer as well.  Its now uploaded to the DCC with the rest of the stage information.  Tomorrow we'll start scanning the crystal position.