Reports until 18:55, Thursday 03 July 2025
SQZ General
dmdesant - posted 18:55, Thursday 03 July 2025 (11996)
Initial Squeezing Observed In LASTI

Eric, Wen, Daniel

We have been neglecting alogs for LASTI over the past couple weeks, so this one is pretty long. The TLDR is good news: we are fairly confident that we are observing squeezing levels of ~0.6dB and anti-squeezing levels of ~1.2dB in the LASTI lab with all control loops and subsystems functional at some capacity. The chamber is not pumped down and alignments are still very rough, so these values are for high frequencies well above the bulk of acoustic noise (see screenshots below for squeezing and here for anti squeezing homodyne spectra).

Control Loops (CLF, LO, Red PDH)

Our last update mentioned some brief notes about the state of the control loops in the LASTI setup. Since then, we were able to reinstall all the VCOs necessary for the CLF loop, including an LO signal generator in the controls rack which we phase-locked to the VCOs that drive the AOMs in the CLF path using it's internal 10MHz reference. This IFR generator in the controls rack generates both the 9 MHz and 18 MHz local oscillator signals for LO and CLF demodulation respectively. It should be noted that our LO generation path no longer includes a PZT for LO phase actuation. Instead, it uses a pair of series AOMs much like the CLF path with the only difference being that the two AOMs are driven at the same frequency (80MHz) with one driven by a VCO that we actuate with the LO demod error signal. This allows the LO phase to track and lock over an infinite phase drift, whereas the PZT has a limited phase tracking range. With all of this in place, we were able to successfully generate error signals for both the LO and CLF loops. These loops are now locking without having been tuned or optimized much. The CLF loop OLTF seems to be okay without much adjustment. Eric pointed out that the transfer function for the LO CMB is likely no longer stable due to the additional phase integration added resulting from frequency actuation as opposed to the old phase actuation approach. This is likely the case, however we have been able to get by with reduced loop gain to compensate.

In addition to these critical loops, we also found the red PDH loop we temporarily installed for locking the OPO for homodyne alignment to come in handy quite often, so we semi-permenantly installed it to share the OPO CMB and reused the filter-cavity PDH demodulator to generate an error signal. The dither frequency is selected to be 18 MHz to make it possible to hijack the CLF PD signal for feedback. In our current configuration, the 18 MHz LO signal generated by the IFR in the rack is sent to an unused RF distribution amplifier and the 26 dBm output of this drives the seed EOM on the table. The lower-level 13dBm outputs drive both the red PDH demodulator as well as the CLF loop demodulator. To use this loop, the CLF PD must be disconnected from the CLF demodulator and re-routed to the red PDH demodulator. The red PDH error signal is connected to the OPO CMB channel-2 input. So locking either can be achieved quickly by choosing which error signal to use (i.e. green or red). In the coming days, we will update this post with a detailed block diagram of the setup to make future use easier.

Pump Power Increase Attempts

Throughout a lot of this setup, we were operating with reduced pump power due to excessive loss in the pump fiber feedthrough on our vacuum chamber. In order to maximize squeezing, we needed to reduce this loss to access more pump power at the OPO. During some debugging of this feedthrough it failed completely, so we needed to run a temporary in-vacuum patch cord through the chamber wall with the feedthrough removed. To keep everything clean, we foiled over the patch cord and the feedthrough flange. Eric was able to find us a spare green feedthrough and we were able to measure an 80% transmission through it. However, it appears that it's ferrule is damaged with the fiber core unsupported at the tip. The mode output from the fiber seems okay, but it remains unclear if this will be usable for us or if it will need to be reconnectorized.

70 KHz Coherent Noise in OPO REFL BBPD and CLF BBPD

After turning up the pump power into the OPO, we discovered some mysterious noise in almost every RF error signal in the setup. While debugging the PDH and CLF demod error signals, we noticed a large amount of high-frequency noise on both demodulations. This manifested as a 70 KHz signal superimposed on the error signal and was most pronounced near OPO resonances. Upon further investigation, we observed strong sidebands 70 KHz from the PDH dither carrier on the OPO REFL BBPD signal here. These sidebands were so strong that at the time we observed them they were preventing us from locking the OPO. To at least get the OPO PDH loop stable, we made a 70 KHz notch filter and put it between the OPO PDH demodulator and the OPO CMB. The schematic for this filter is shown here and has this transfer function. Placing this in the loop allowed us to lock the OPO, but we still see these 70 KHz sidebands on the OPO REFL BBPD regardless. Similar sidebands are present on the CLF PD RF signal as well. We aren't yet sure of the origin of this oscillation, but we will be investigating these PD's power supplies for ripple as well as the possibility that back reflections from the OPO are causing this.

Homodyne Repeat Diff Channel Failure

Once this problem was at least temporarily resolved, we discovered that our homodyne detector's differential channel had failed yet again. Like the previous time, the 100k feedback resistor on the difference channel TIA had blown open. My only guess for why this is happening is that something is physically wrong with this batch of 100k 0805 resistors in the lab that causes them to be particularly unreliable. It shouldn't be possible for these to be overdissipated by the voltages present in the HD circuit. To prevent this failure from occuring again, we instead replaced the 100k feedback resistor with a 1/4 watt through-hole one (see bodge here).

At this time, the gain configuration for this homodyne is as follows:

DIfference TIA Gain: 100k

PD1/PD2 TIA Gain: 5k

We only quickly realigned the homodyne detector after repairs, but we think the visiblity is still probably > 90%. We are using 1mW of LO on each PD for now.

Squeezing Observation

With everything roughly set up, we visually/approximately recovered the crystal position reference from our previous sweep of the OPO's coresonant conditions in this alog. We found a fairly good spot on the crystal at a temperature of 35.02 C and a stage displacement of 1.0mm. We measured our pump input power to be 8.6 mW (12.6 uW transmitted) and our CLF input power to be 290 uW. After locking all loops, we were able to observe ~1.2 dB of anti-squeezing with the LO-locking demod phase angle set to -25 degrees relative to the CLF 2F phase (using IFR's carrier phase adjustement). Here is the homodyne difference noise spectrum from this state. Rotating the LO demod angle by -90 degrees to -115 degrees resulted in this noise spectrum showing ~0.6dB squeezing. In both screenshots, the dim trace is the shot-noise floor of the LO only (SQZ blocked) on the homodyne detector. There isn't much measurable squeezing or anti squeezing at frequencies lower than this most likely due to acoustic noise.

Next Steps

Moving forward, we have several improvements planned. Eric purchased some PM fibers for the pump and CLF signals to run between tables. We expect that this will make it much easier to maintain pump and CLF power as the fiber polarization will no longer be changing widely as the lab temperature fluctuates. We also likely have a lot of alignment tweaking to do on the homodyne detector and OPO phase matching to maximize nonlinear gain, which seems to be low at the moment. Once we get as much as we can out of the current configuration, we also plan on throwing in a newer OPO crystal to compare it's performance to the old one.

 

 

Images attached to this report