Reports until 22:48, Friday 27 June 2025
SQZ General
eoelker - posted 22:48, Friday 27 June 2025 (11993)
Front seed path for spare vopo escape efficiency measurement

[Jaime, Eric]

We put some optics on the VOPO test setup today to build a front seed path.  Just need to set up a 1064 trans port on Monday and align.  Jaime will use this path to measure the escape efficiency of the spare VOPO I built for LHO.  

Mode matching:  One lens w roc=150 mm was placed a distance of 5.76" from the edge of the VOPO box.  This was based on a measurement of the collimator output that Jaime made last Friday.

Images attached to this report