Eric, Danial, Wen
The VOPO chamber's viewport for the SQZ beam to go through is replaced by one with AR coating. The old one was lossy. We measured 50.5 +- 0.5 uW before the viewport and 48.0 +- 0.5uW after. The background is around 0.5 uW. There's around 40 uW in the 48 uW transmitted power that is seed, while the rest is green. Therefore, the efficiency is 94%-96%.
Eric installed the new one (AR-coated) last morning. The difference of the power measured before and after the viewport is less than the uncertainties of each measurement (~1 uW), suggesting the loss of the new viewport is much less than the old one.