dmdesant - posted 13:32, Wednesday 04 June 2025 - last comment - 18:49, Friday 06 June 2025(11976)
LASTI Signal Generation Chain and Homodyne Detector Progress

Wen, Eric, Daniel

Main Laser Table

Before last week, we finished up reassembling and characterizing the CLF and LO generation paths on the laser table in LASTI. In this configuration here, we are using a pair of AOMs for LO generation upon Eric's reccomendation to avoid running out of actuation range for LO phase locking. Both the seed and the CLF paths are coupled into separate fiber collimators and are switched in and out of a common SM fiber that runs to the squeezer table. The LO fiber is coupled into a long PM fiber that is protected in a rigid rubber hose and ran to the detector side of the squeezer table. All paths are mode-matched into each fiber with around 60-80% coupling as far as I can tell. Depending on the exact fiber we use in each collimator, coupling efficiencies above 90% have been observed. Some pre-existing lenses in this setup were not labeled, however the mode-matching lenses before each collimator package should be fairly accurately depicted here.

Homodyne Detector

This week, we finished designing and mocking up the homodyne detector to be rebuilt on the squeezer table. We are taking a similar approach to a homodyne detector used at the sites (E2000282) in 2020. In this approach here, the SQZ and LO beams are mode-matched at a wide mostly collimated waist that coincides with the plane of the homodyne detector's beam splitter. The PM fiber carrying the LO signal is brought up onto the table and is coupled out using a ThorLabs F220APC-1064 collimator. This particular PM fiber (OZ-Optics) has a strange ferule length, so the light coming out of the fiber is not well collimated. In fact, it forms a waist of ~200um in diameter approximately 32 cm from the front plane of the package. Eric gave us an OZ-Optics collimator which was better matched to the fiber to fix this. Unfortunately, it is quite large and didn't fit into any of our tip/tilt mounts, which would potentially prove to be annoying down the line. So in the end, we opted to stick with the uncollimated beam from the ThorLabs collimator and just mode-match to that. It turned out that our SQZ beam and uncollimated LO beam had similar waists, so this was not a big problem. The mode-matching solution can be viewed here. Each PD captures a beam of diameter ~100um focused by two identical R50 super-polished PLCX lenses. We went ahead and started building this and had gotten to the point where we were able to observe similar LO power on each photodetector using the PD1/2 output monitors on the homodyne detector.

At this point, I began the process of zero-ing the difference channel of the homodyne detector and noticed that it was essentially railed at +13.8V. This particular detector is version 5 of the standard LIGO homodyne detector (D1300671). It was later discovered that U9 (the differential TIA) operational amplifier was behaving as if it were completely open-loop and the inverting input was drawing substantial DC current. I am fairly confident that this is just a bad part, but instead of debugging this detector immediately I went ahead and just swapped in a spare homodyne board. After this, I was able to get the difference channel DC offset down to sub-millivolt levels on a scope as a decent start. Next, I will be repeating the balancing process while looking at the output noise floor of the difference channel. In any case, the individual PD1/2 output monitors (with a TIA gain of ~1000) read an output DC voltage of 477 mV with 540 uW on each detector (measured with a ThorLabs free-space power meter). Given an ideal responsivity of ~0.86 for 1064nm, we would expect to see a voltage of V1,2 = 540uW * 0.86A/W * 1000 V/A = 464mV. Given that the measured voltage is slightly above this, I expect that in fact there is some error in my free-space power measurement. Nevertheless, the fraction of power captured by each PD is likely very close to 100%, so we will continue to improve the alignment and overlap with the SQZ beam this week.

Images attached to this report
Comments related to this report
dmdesant - 18:49, Friday 06 June 2025 (11977)

Homodyne Detector Repairs and Failure Mechanism Theory

Shortly after posting this, we noticed that the spare homodyne detector in our setup became very noisy with periodic transients that looked like these in all output channels. Some time later, this resulted in a hard failure of the differential TIA channel as U9's output became somehow shorted to the +15 volt rail. After seeing this, we decided that it would be worth it to just repair the homodyne board that was in the LASTI detector initially. The fault with the first detector board turned out to be due to a failure in the differential channel diff-pair buffer for the DB15 connector (U8) which ultimately shorted the output of U9 to the +15 volt rail. Both U8 and U9 were replaced and this board was re-installed into the homodyne enclosure. The TIA gains for the detector at this time are:

PD1/2: 5K

DC: 100K

The spare board was also investigated, and curiously, the initial transient noise that was first noticed on this board was originating from the non-inverting input pin of U8B. It seems like this output buffer (U8) that drives the differential diff-channel through the DB15 connector tends to fail in such a way that can cause the previous diff-channel TIA (U9) to fail as well. As for why, a potential theory is that it is possible for the inputs of both op amps to exceed their differential voltage absolute maximum limits of +/-0.7 volts when each stage rails. Additional non-idealites such as the fact that these opamps have neither rail-to-rail inputs or outputs means that at extreme photocurrent imbalance, the input pins of U8 and U9 can begin to draw current that may result in input overload, especially if U8B is railed. A rough guess as to what exactly occurs is as follows.

1.) During alignment, the two detectors produce imbalanced photocurrents.

2.) If the imbalance is too great, U9 will rail, placing +/-13.7V on the noninverting input of U8B.

3.) U8B will rail, and in doing so will try to pull the inverting input back up to match the output of U9.

4.) Because at this voltage, the inputs may draw current, U8B will fail to balance the inputs as the amplifier is now sautrated and a voltage drop must occur across R34 and R32. If the imbalance on these inputs approaches or exceeds +/- 0.7 volts, the device will be damaged, potentially shorting the non-inverting input to a supply rail and thus shorting out the output of U9.

The same logic can be applied more basically to the differential TIA stage, only the source driving the inputs away from each other is now the photodetectors - which are less likely to be able to source enough current to cause damage to the junctions in the device. This is a very speculative theory as to what the failure mechanism is here and more investigation would be necessary to conclude that this holds any weight.... this is just an idea I figured I would write down before forgetting.

In any case, the spare detector board was repaired in the same way as the previous one and is now functional again. The TIA gains for the spare detector board at this time are:

PD1/2: 1K

DC: 10K

Successful LO Shot Noise Measurement

Today, we re-aligned the homodyne to the LO path on the squeezer table and were able to balance and capture the shot-noise floor of the LO alone. Using amplitude modulation on the LO, we observed an input-referred common-mode rejection of at least 30dB. Turning the amplitude modulation off, we took noise measurements of the difference channel and one of the two single-ended PD channels here. For this measurement, the LO power on each PD was 0.620mW (confirmed by the DC voltage on PD1 -> 2.68V). At this power, the expected shot noise contribution to the output voltage noise spectral density is ~1.9uV/rt(Hz), which is close to the noise floor we measured. The darker traces on the SR785 are the dark-noise floor of the detector. At this point, we conclude that the homodyne detector we are using is functioning well enough and will move on with aligning the sqz path.

Images attached to this comment