dennis.martynov - posted 12:20, Saturday 17 May 2025 (11961)
C-6D control strategy
Since Rich would like to start testing C-6D, I summarise the current C-6D control strategy in this log and some known problems / solutions. C-6D would significantly gain from automatisation and from the LIGO Guardian. However, at the moment, most of the switching is done manually.

Procedure for ISI isolation with C-6D in loop: C-6D should be transitioned from the BOSEM control state (see the definition below) to the LPS control state. The transition happens by disabling inputs of CATCH RX, RY, and engaging FM1 on CATCH RZ filter bank, enabling inputs of DAMP RX, RY, RZ banks. Also, need to turn off outputs of CATCH X, Y, Z and engage outputs of DAMP X, Y, Z. No need to clear history in any of these steps. Now ISI controls can be enabled.

Procedure for disabling ISI isolation with C-6D in loop: C-6D should be transitioned from the LPS control state to the BOSEM control state. Disable inputs of DAMP RX,RY,RZ and engage inputs of CATCH RX, RY and disable FM1 of CATCH RZ. Then disable outputs of DAMP X, Y, Z and engage outputs of CATCH X, Y, Z.

BOSEM control state: this is the usual C-6D state when it is not in loop. The inertial mass is damped in X,Y,Z and caught in RX, RY, RZ with a bandwidth of 15 mHz. This state is quite robust and should survive ISI trips and earthquakes without losing the mass out of the sensor range.

LPS state: this is the usual C-6D state when it is in loop. The state is a bit more fragile than the C-6D BOSEM control state but it is lower noise and has proper dynamics. RX and RY are controlled with a bandwidth of 1 mHz + its resonances at 8 mHz and 16 mHz are damped to Q of 2.85 - 3.

Known minor challenges during the transition (occur frequently, easy to fix, and should probably be a part of the automatisation script):

LPS signals are large: If C-6D is caught with BOSEMs, such that RX = 0 um, RY = 0 um, and RZ = -300 um (see um column in the “BOSEM SIGNALS” block of the SIXD master MEDM screen) but LPS signals are more than a few um (see um column in the “LPS SIGNALS” block of the SIXD master MEDM screen) then LPS should be reset. This scenario typically occurs when ISI trips and LPS sensors accumulate junk signal due to fast oscillations of the inertial mass. It is fine to reset LPS during every transition because it is quick. Go to the LPS MAIN window and click 6 buttons V1, V2, V3, H1, H2, H3 RESET in the “Linearisation” block.

Signals in the DoF DECOUPLING block are large (nm column): if LPS signals were large and then reset (as discussed in the previous step) then these large signals may decay for a while in three slow filters: two feedforward filters (X/RY and Y/RX) and one matching filter (to equalise the response of RX and RY to the platform tilt). If the signals in the nm column are more than 20,000 nm, it is worth clearing the history of these three signals. Go to the FF window and then clear history in filter banks 5_1 and 4_2. Then go to C-6D RXYZ window (also inside the DoF DECOUPLING block) and clear the history of the FF_SENS_RY filter bank.

Known major challenges (some are easy to fix and some items require time to fix):

C-6D loses balance (and cannot be caught again with the coils) if ISI is controlled with GS-13 [fixed]: this occurred once (log 11906) because the C-6D 5.8 Hz bounce mode (with a large Q-factor) couples into the ISI dynamics. The ISI has strongly excited the mode (by a few mm) and unclamped masses (such as balancing magnetobullets) moved on the mass. This problem is addressed by engaging the CATCH Z damping servo as discussed above if C-6D is not in loop. Once this occurred, Rich and I have rebalanced the mass with magnetobullets.

C-6D loses balance if ISI is tripped with C-6D in loop: this happens frequently because LPS accumulate junk once they measure fast signals. Therefore, C-6D should transition from LPS control to the BOSEM control as soon as possible. If done within a few sec, C-6D should not loose balance. However, since we do not have Guardian at the moment, and ISI may trip when no one is looking, junk LPS signal imbalances C-6D. In this case, it is required to transition C-6D to a slightly altered BOSEM control state: X, Y, Z are as usual (unless the C-6D motion is so large that CATCH gains for X, Y, Z should be lowered a bit to avoid the actuator saturations). CATCH RZ is in its usual state. CATCH RX, RY should run with FM6 engaged instead of FM1 ('damp' instead of 'catch'). The mass is typically parked in the state with BOSEM RZ of -650 um. The RZ servo will slowly bring the mass back. It might take time. It is feasible to help the servo by adding a negative offset (of -1000) to H1 COIL with a ramp of 30 sec. The offset must be removed immediately once the inertial mass starts to move (BOSEM RZ signal grows). Then the servo should catch it (potentially after bouncing back and forth between the rails for a couple of times). Once RZ is caught at -300 um then ramp down the gain of CATCH RX and RY, switch off FM 1 (damp), switch on FM1 (catch) and then slowly ramp the gain to -1 (with a ramping time of 60 sec).

C-6D centre of mass sagging: this occurs due to a compressive load of Epo-Tek 353 ND between the C-6D mass and the spacers between the mass and the fused silica anchor. We tried to minimise the layer thickness by heating both surfaces to 100 C (to improve the 353 ND's viscosity) but there is still a bit of sagging. In the long term, this should be fixed by cutting a monolithic fused silica mass with spacers. The sagging is very slow. So far, I had to reduce C-6D feedforward and RX/RY alignment filters twice (in 2.5 months and 5 months after installation). During the first 2.5 months, epoxy sagged by 203 nm and during the last 2.5 months - by 61 nm. The consequence of this sagging (and this is how it is estimated) is that the tilt modes increase in frequencies: from 7.4 mHz to 8.15 mHz during the first 2.5 months and from 8.15 mHz to 8.35 mHz. This change requires retuning of the X/RY and Y/RX feedforward filters and RX/RY coalignment filters. Since 353 ND's sagging slows down, I expect the next retuning might be required in ~half a year or longer. The problem can be diagnosed if RX and RY blends start to ring at around 8 mHz. Then, it is required to transition C-6D to the LPS control state and slightly excite RX and then RY degrees of freedom and measure the damped period and Q-factor (should be around 3).

C-6D drift: sagging of Epo-Tek 353 ND also leads to drift in the C-6D. It seems like a small effect though and we did not have to correct it yet. However, this might happen in the future. If DC vertical coil signal are large than ~14,000 cnts, it might be a good time to rebalance C-6D with magnetoguns.

C-6D LPS nonlinearities: this is quite an interesting challenge that we did not see before. During the past two months, the LPS laser current modulation reduced by 10%. The cause is unknown but most likely the modulation of the index of refraction of the DFB cavity is temperature dependent. Since we do not have a temperature controller for the DFB laser at the moment (though it might be very good to have one, such as Thorlabs TED200C), the DFB modulation has reduced. The consequence of this change was quite interesting: when engaging ISI loops with C-6D in loop then Z, RX, RY, and RZ engage fine but X rings at 1.7 Hz (looks like ISI eigen mode) and trips the ISI. This is probably how non-linear control systems work; I think quite counter-intuitive. To fix this problem, we need to control the DFB temperature and (once it occurs) linearise LPS. This can be done by providing 10 um offsets to CATCH RX, RY, RZ loops (such that the mass moves by a few fringes) and recording 10-30 sec of LPS COS and SIN signals. It is typically sufficient just to balance the amplitudes of the two harmonics. A more details Matlab script linearise_LPS.m is in Documents/birmingham. Note that it returns the ellipse rotation angle (should be inserted with a minus sign to the MEDM LPS ROT field inside the "Linearisation" block. The script also returns 'ratio' which is the gain for relevant COS quadrature.

LPS demodulate phase correction: the phase typically stays stable. However, I noticed (both in Birmingham and MIT) that the phases have to be adjusted after CDS reboot. I think real-time oscillators at different frequencies end up at random phases between each other after reboots. The demodulation phases should then be corrected. Note that the phase error column should show numbers around +/- 90 degrees because we proceed with the Q-quadrate. Correcting the phase is quite straightforward. However, LPS signals might change their signs after this correction. The sign should be validated against BOSEM signals. Provide an offset to CATCH RX servo and observe how signals in BOSEM SIGNAL and LPS SIGNAL (um column) change. If the direction is the same then the problem is fixed. Otherwise, need to flip LPS signs in LPS XYZ, RXYZ filter banks (within LPS SIGNAL block).

Below, I also summarise the C6D master MEDM screen and control strategy:

BOSEM path: BOSEM V1-3 and H1-3 filters apply dewhitening and calibrate BOSEM signals to um. The DIAG matrix converts BOSEM signals to XYZ, RXYZ at the local coordinate system (defined by the RX,RY diagonalisation). These signals then go to CATCH filter banks and then to COIL XYZ, RXYZ. These control signals are then converted to the H1-3 and V1-3 COIL basis with ACT matrix. Note this is still in the local C-6D coordinate system.

LPS path: LPS V1-3 and H1-3 apply calibration from the Lissajous phase to um. Then matrix DIAG converts the signal to XYZ, RXYZ in the local C-6D basis. These signal go to DAMP XYZ, RXYZ to control C-6D in the low noise regime. Note that the name "DAMP" stays there for historical reasons and must be replaced in the future. LPS signals do not only damp but also catch the mass in RXYZ.

DoF DECOUPLING path: LPS signals (not BOSEM signal) flow to the FF block where X/RY and Y/RX feedforward is applied to diagonalise the degrees of freedom. Then C-6D XYZ, RXYZ filter banks calibrate the signals to nm or nrad and also apply a frequency-dependent filter to RY (to equalise its response to RX in tilt). This step is required due to the asymmetric fibre. The nm column means nm signals in XYZ and nrad signals in RXYZ.

COORD ROTATION: Matrix TO CARD rotates the signal from the C-6D system to the ISI coordinate system (by 30 degrees). ISI XYZ and RXYZ filter banks apply correction gains (on the order of 1) to match the C-6D signals to GS-13 signals in the frequency band around 0.5 - 5 Hz.

TEMPERATURE block: just monitors T around C-6D and shows signals in K relative to 25 C. Typically around -10 K (15 C) but may change quite a bit (up to 5 degrees) when weather in Boston changes.

MAGNETOGUNS block: rebalances the mass (once needed). Only the second channel is utilised. Frequency should be 3.8 kHz (corresponding to the gun's LC circuit resonance). Amplitude can be around 15,000 - 33,000 cnts and duration around 30 - 300 cycles. Higher amplitudes and longer duration of the pulse move the mass longer (quadratically in the number of cycles).

ISI control sequence with the C-6D in loop:

Null CPS signals and engage Z with GS-13 in loop (CPS and GS-13 blending filters: 100). Then slowly ramp (in ~5 sec) the C-6D Z blending signal (with FM1 R5.8 engaged). This should help damp the C-6D bounce mode. This is the only C-6D signal that should be ramped. Note that the Z isolation loop will likely not engage if the C-6D signal is blended during the ISO gain ramping and may strongly ring up the C-6D bounce mode. All other C-6D blend signals should be engaged from the start. 

Then engage RX,RY,RZ isolation loops with CPS/C-6D blending at 25 mHz and C-6D / GS blending at 2 Hz. The blending filters are likely to change. At the moment, they are as follows. CPS RX, RY: 25m_B and CPS RZ: 25m. C-6D RX, RY: 25m_B + LP2b + LP20 and C-6D RZ: 25m + LP2b + LP20. GS13 RX, RY, RZ: 250 + HP2.

Once the transient from RX/RY has passed (within a minute or two) then engage XY isolation loops. The blending filter are as follows. CPS X,Y: 35m_B. C-6D X, Y: 35m_B + LP2b + LP20. GS-13 X, Y: 250 + hp2.