dmdesant - posted 17:25, Thursday 08 May 2025 (11955)
LASTI VOPO CLF beam path re-established and mode matched

[Wen, Eric, Daniel]

Today, we finished realigning and mode-matching the CLF beam on the out-of-vac table in LASTI. The ideal thin-lens mode-matching solution from alamode is attached here given the available 300-mm and 88.3-mm focal-length lenses. In practice, the position of lens 2 needed significant adjustment to achieve good mode matching (see image/diagram of completed setup). The origin of this discrepancy is unclear, although it could be explained by a mislabeled lens. The rest of the lens/collimator positions were close to the thin-lens solution. The final positions of all components in the chain are given in the setup diagram.

Something else that through me through a loop was that I was struggling to walk the beam into the center of the collimator using combinations of M2, M3, and M4. This was preventing us from achieving a coupling efficiency above 50%. Eric thankfully pointed out that the Gouy-phase separation between these three mirrors was too small and that their actions would be degenerate (in this case they could only really affect the incidence angle of the beam on the collimator). Switching to using M1 and M4 to course walk the beam and then using M2 and M4 to achieve fine alignment allowed us to achieve a coupling efficiency of 95% fairly easily. With 9.99 mW of CLF incident on the collimator, 9.50 mW was measured at the other end of a standard single-mode fiber. Following this, flippers for both the seed path and CLF path were reinstalled and are also working nicely.

Images attached to this report
Displaying report 1-1 of 1.