I moved the PZT mirror phase actuator from the CSQZ path to the BOPO's path such that both the high and low frequency phase actuators (AOMs and PZT) to keep the BOPO phase in sync with the squeeze angle control LO's phase are on the same optical path. The previous configuration locked the LO to the CSQZ CLF phase, and then used a PZT mirror on the CSQZ path plus an AOM pair on the BOPO pump phase path to attempt to keep the BOPO's CLF phase in sync with the LO's. Some loop algebra indicates that this configuration should have been unstable, which may be responsible for the observed 30 Hz rail-to-rail oscillation. I also placed a lens in an xy-translation mount prior to PD B on the differential receiver for MZI locking. This allows us to adjust the 99/1 beam splitter's angle while keeping the beam centered on this PD. After making this switch, I re-aligned the OPO beams to each other (96% mode matched), re-aligned the MZI (98.6% mode matched), balanced the power levels on the MZI differential receiver (balanced to within 0.1%), and mode matched the beams to the compact squeezer's homodyne (99% mode matching from the BOPO beam to the CSQZ homodyne and ~90% for the CSQZ beam). This mode matching should be fine to assess the stability of the relative squeeze angle control and MZI with the various improvements over the last few weeks. However, before taking final data, we will likely want to adjust the position of the lenses on the CSQZ path before the MZI in order to optimize the mode matching between the CSQZ and BOPO's OPO cavities. The attached picture shows the current optics configuration with the PZT mirror moved to the BOPO path and the XY lens mount in before PD B.