The LASTI squeezer was recovered to the state before I left in last December. The misalignment into the SHG cavity was found and fixed. The fiber coupling was fine. Note that the SHG TEC was suddenly off overnight (March 14th) for unknown reasons. We'll keep an eye on it if it gets turned off again for some reason.
The green alignment to OPO was recovered. We measured 36.0 uW transmission after M2 when on resonance and 27.2 uW on the in-air TRANS PD, given 3.2 mW of input to M1 (sideband + HOM). The peak power on TRANS PD is 145 mV for main 00 resonance, but I do see another resonance giving 54 mV peak in one FSR. This secondary resonance also has a 00 mode shape on camera. We will tune the input waveplate to see if we can remove the secondary 00.
In the previous post, I saw another beam spot on M1 that's as bright as the circulating beam. I tried to find the ghost beam but didn't find any. This may be the reflection from the AR-coated wedge surface. I'll leave it as it is. The laser card was accidentally dropped into the gap between the breadboard and the chamber. I think it's easiest to retrieve it by lifting up the breadboard again. We'll probably do it near the end of the installation, just in case if there's anything else slipped into the gap.
We've lifted up the VOPO breadboard today and picked up all the things dropped in the gap - one laser card and one optics.