Reports until 15:17, Monday 10 March 2025
Heisenberg IFO General
hudsonl - posted 15:17, Monday 10 March 2025 (11911)
Parasitic Couplings to CSQZ HD after MZI
I had noticed that there was some coupling from light in the MZI squeeze angle control LO and the CSQZ CLF (even with the OPO unlocked) to the CSQZ's homodyne after passing through the interferometer. The coupling to the squeeze angle control LO was mitigated by adding a fiber Faraday isolator in the fiber path between the free space to fiber coupler for the 1% pickoff and the 90/10 beam splitter where the pick off beam is mixed with a LO beam of several mW. 

The 9 MHz CLF beam appears to effect the homodyne's DC signal somewhat, although this is reduced along with CLF power, as expected. The origin of this coupling is likely the same mechanism that always limits CLF power, and I suspect that it will not limit squeezing levels as long as the CLF power is at or below the level used to measure large levels of squeezing on the homodyne without first passing through the interferometer.