Reports until 15:16, Wednesday 22 January 2025
testbedAI General
nikhil - posted 15:16, Wednesday 22 January 2025 (11874)
testbedAI Mach-Zehnder updates

[Adam, Nikhil]

After the RL training with 2 degrees of freedom (DOF), we are now working towards controlling more DOFs (pitch & yaw for two optics). 

So we recently updated the layout (attached) with the following modifications:

  1. Added an extra Basler gigE CCD camera to better observe both the lateral and angular alignments from the 4 DOFs.
  2. We replaced some of the ND filters which were causing ghost beams. 
  3. We swapped the mirror in the reference beam path with another one from Slawek that has a piezo (for dither length locking)
  4. Extra photodector in the output path for observing the final output power (for visibility measurements)
  5. PBS+HWP in the output path to reduce power to the CCD.

 

Beam ellipicity is around 90%. 50 mW in each arm. S-pol. 

Manual alignment now gives us a visibility close to 96%. The beam walk procedure involves first minimizing lateral mis-alignment by ensuring the overlap of the two beams on the near-field camera using the M1 mirror. This step is followed by fringe-based optimization using the far-field camera. We then adjust  the fringe on the near-field camera using BS2 beam-spliiter (and repeating the three steps if necessary based on visibility metric).

Mach-Zehnder is now dither locked to dark fringe using the output PD & piezo via CyMAC with a simple Foton-based proportional integrator feedback loop (needs some fine-tuning). We use the spare Thorlabs three-axis piezo controller (MDT 693A) from Hudson. We will follow up with some open loop measurements to design a more optimal filter.

Images attached to this report