[Adam, Nikhil]
After the RL training with 2 degrees of freedom (DOF), we are now working towards controlling more DOFs (pitch & yaw for two optics).
So we recently updated the layout (attached) with the following modifications:
Beam ellipicity is around 90%. 50 mW in each arm. S-pol.
Manual alignment now gives us a visibility close to 96%. The beam walk procedure involves first minimizing lateral mis-alignment by ensuring the overlap of the two beams on the near-field camera using the M1 mirror. This step is followed by fringe-based optimization using the far-field camera. We then adjust the fringe on the near-field camera using BS2 beam-spliiter (and repeating the three steps if necessary based on visibility metric).
Mach-Zehnder is now dither locked to dark fringe using the output PD & piezo via CyMAC with a simple Foton-based proportional integrator feedback loop (needs some fine-tuning). We use the spare Thorlabs three-axis piezo controller (MDT 693A) from Hudson. We will follow up with some open loop measurements to design a more optimal filter.