The last several days, I've been putting together the second laser prestabilization loop for the GRAVITES moving platform test setup. I stuffed another servo board and put together a chassis. The noise performance is comparable to the previous unit. I now am able to lock both the 1550 nm and 1545 nm lasers to the prestabilization interferometer simultaneously, each with about 10 kHz bandwidth, which should be more than sufficient to suppres noise at the platform modulation frequency. See (11829) for a more detailed write-up on the prestab setup.
Still need to set up the prestabilization temp controller again, just waiting for a new cable from thorlabs. We're more or less ready to close up the acoustic enclosure. Tomorrow I'll start assembling the rotating stage now that all of the components Elio ordered have arrived.