SQZ General
wenxuan - posted 18:38, Friday 15 November 2024 - last comment - 14:12, Monday 18 November 2024(11824)
LASTI VOPO red and green setup

Eric, Wen

We've received all the hardware and mounted the 4-inch breadboard to level the beam height to the viewports (thanks to Kellen's help!) This setup avoids any periscope. We installed pump TRANS/REFL camera & PD, CLF REFL camera & PD, and seed TRANS camera & PD on the breadboard. With these sensors, we get the pump and seed pretty-well aligned into the VOPO cavity. 

We then tried to lock the OPO loop. The demod PDH signal was too weak so we removed the 6dB attenuator of the 80-MHz injection to EOM. After that, we can see the signal pretty clearly on the scope. Locking with the current OPO servo board was not successful. We have to re-do some loopology as we did with SHG lock acquisition. 

Images attached to this report
Comments related to this report
Lisa - 14:12, Monday 18 November 2024 (11826)

I am attaching here the ICS record with the successful mirror gluing process, with screeshot of the procedure:

https://ics.ligo-la.caltech.edu/JIRA/browse/Bake-10201

Images attached to this comment