Displaying report 1-1 of 1.
Reports until 16:31, Tuesday 29 October 2024
SQZ General
wenxuan - posted 16:31, Tuesday 29 October 2024 (11818)
Preliminary alignment of LASTI VOPO pump beam

Eric, Wen

We set up the temporary viewport for the transmission of green beam to do some preliminary alignment work before the hardware arrives for mounting the 4-in breadboard. The camera and PD for green TRANS were taken away from the large SQZ table.

The green fiber is now routed to the VOPO tank, along with other cables like OPO PZT. The throughput from the output of in-air fiber to the output of the in-vacuum fiber collimator is 20 mW/34 mW = 59%.

Upon the connection of pump fiber, we immediately saw the cavity flashes that were seen in the previous alog. With the help of the camera, we were able to align the pump to the cavity fairly quickly. The cavity scan shows decent TRANS peaks of a few FSR. We will continue optimizing green and start working on red alignment once we have the breadboard properly set up. 

Images attached to this report
Displaying report 1-1 of 1.