SQZ General
wenxuan - posted 21:04, Monday 14 October 2024 (11804)
LASTI VOPO rough alignment

Eric, Wen

We did a rough alignment of the VOPO cavity after installing the input paths. The pump and seed beams were delivered via the long in-air fibers wrapped with protective foam. We were able to see and align the beam spots traversed the round trips of the cavity. It was difficult to see the transmitted beam of either green or red; a PD and a camera would be needed to do a finer alignment. Unfortunately, there's not much space in the small clean room to install the sensors. Instead, we'll put the circular breadboard into the vacuum tank once we receive the new table legs. This will free a lot of space. 

Images attached to this report
Displaying report 1-1 of 1.